Yusrizal Yusoff is a results-oriented professional with over 15 years of experience in oil and gas fabrication, inspection, quality management, and expediting. His experience spans fabrication and construction, procedural preparation, project management, and inspection of static and rotating equipment, process skids, pressure vessels, piping, pumps, valves, instrumentation, and subsea and wellhead equipment. He has managed worksites and coordinated fabrication and installation activities while maintaining project quality systems, reviewing technical documentation, and ensuring compliance with international codes, standards, specifications, and statutory requirements. Yusrizal has improved project efficiency, reduced delays, and supported quality delivery from project initiation and fabrication through painting and handover. He has also managed vendor schedules, long-lead items, milestone reporting, supplier performance, and recovery planning in multicultural local and international environments.
Education
- Mechanical Engineering - Universiti Teknologi Malaysia
Qualifications and Training
- Certificate & Attendance Course – ISO 9001:2008 Internal Audit Conducted by Care Certification International
- Certificate & Attendance Course – ISO 14001: 2004 Environmental Management System Awareness Conducted by Nexus TAC.
- Certificate & Attendance Course (WIS5) TWI Material Joining Technology and Welding Inspection – Steel (CSWIP 3.1) Conducted by Technology Welding Institute Training Centre; CSWIP Cert No: 45243 (Exp: 29 Apr 2014), Cert No:45243/2 (Exp:30 Mar 2019), Cert No:394896 (Exp:18 Dec 2024), Cert No: 394896/2 (Exp: 18 Dec 2029)
- Certificate & Attendance Course of Radiographic Interpretation (PCN Level II) Conducted by MINDT - Certificate F009S3620020 & PCN No: 307007
- Certificate & Attendance Course of ASNT Level II PT, MT and RI Conducted by NDT & Engineering Technology Consultations - Certificate PT/2023-1/035; MT/2023-1/033; RT/2023-1/031 (Exp: Jan 2028)
- Subsea Equipment - process of drilling / wellhead equipment in-process inspection - SGS Singapore and Copper Cameroon Singapore Pte. Ltd.
- Blasting / Painting and Basic Corrosion Protection and Inspection Protocol - International Paint (IP) Malaysia
Work Experience
Jan 2013 – Present
FREELANCE (Various clients)
- Managed worksites and acted as a site focal point for safe and technical delivery of fabrication and installation activities.
- Coordinated fabrication activities with vendors and fabricators to meet assigned engineering project delivery dates.
- Interacted with clients, interpreted their needs and requirements, and represented them in the field.
- Cooperated with project managers, project participants, and senior engineers to develop efficient project methods.
- Reviewed engineering tasks and initiated necessary corrective actions.
- Prepared status reports by gathering, analysing, and summarising findings and project progress for project management.
- Ensured project compliance with applicable codes, practices, policies, performance standards, and specifications.
- Developed and prepared fabrication procedures in accordance with relevant codes, standards, and specifications.
- Obtained and reviewed relevant project documents against specifications, codes, and standards.
- Maintained project quality systems and project quality plans and ensured compliance during construction and commissioning.
- Ensured QAPs were implemented and initiated preventive action against product non-conformities.
- Verified welder performance records and witnessed Welder Qualification Tests against approved WPSs.
- Verified incoming materials and consumables against mill certificates and project requirements.
- Inspected piping and mechanical equipment skids during pre-installation, assembly, and fabrication, including static and rotating packages, tanks, steel structures, package piping, and components.
- Checked piping and mechanical equipment installation for material classification, fit-up, dimensional survey, levelling, verticality, alignment, orientation, and bolt torque/tensioning.
- Implemented fabrication controls to anticipate welding problems such as distortion and major defects.
- Updated welding summaries and shop-drawing mark-ups for modifications and as-built drawing revision.
- Prepared daily surveillance and observation reports for welding activities before, during, and after welding.
- Ensured NDT status was complete and accepted against project requirements, codes, and specifications.
- Carried out line checks by system against test packages and verified system installation completion.
- Monitored and inspected hot tapping, ferrite content testing, holiday testing, thickness gauging, and hardness testing.
- Monitored coating and painting applications, including surface profile assessment, salt testing, WFT/DFT, holiday testing, rubber lining, and FRP work.
- Inspected and witnessed hydro-testing, flushing, cleaning, and drying of piping and mechanical equipment skids and related painting tests.
- Witnessed final line-system reinstatement through commissioning.
- Reviewed, arranged, and compiled final documentation, including FDR/MDR, before project handover.
- Inspected new instrumentation and electrical items against applicable standards.
- Expedited materials based on purchase-order requirements, priorities, and required schedule buffer.
- Negotiated vendor delivery dates and proactively expedited long-lead items.
- Followed up with suppliers for order acknowledgements, milestone information, quantities, shipping details, and promise dates.
- Obtained required material certificates and documentation.
- Prepared and maintained weekly expediting reports for the project team and scheduler.
- Identified and resolved late-delivery notifications from suppliers.
- Worked with suppliers to ensure delivery commitments and on-time performance were met.
- Monitored subcontractor facilities, including staffing levels, operating hours, receipt of major materials, and sub-supplier performance.
- Identified schedule bottlenecks and critical-path items and alerted the project team to potential slippage.
- Monitored process sub-suppliers to verify production status and anticipate schedule-impacting issues.
- Monitored and reported milestone dates, including receipt of free-issue items, welding-procedure approvals, and approved drawings.
- Implemented recovery plans for project or supplier-delivery slippage.
Jan 2011 – Dec 2012
BC Petrochemical Sdn Bhd
Fabrication Engineer & Quality Engineer
- Maintained Project Quality System and Project Quality Plan compliance during fabrication and commissioning.
- Obtained and reviewed project documents against specifications, codes, standards, and client requirements.
- Prepared and conducted WPS, PQR, welder and welding-operator performance qualification, fabrication, and coating procedures.
- Reviewed design drawings for quality-control, code-compliance, and fabrication-planning matters.
- Prepared fabrication and testing inspection checklists and liaised with inspection authorities, TPI, and clients.
- Prepared and implemented QA/QC procedures and fabrication standards.
- Participated in internal quality audits and maintained the quality system.
- Performed root-cause analysis and implemented corrective actions for process concerns.
- Identified, coordinated, and expedited deviation issues and resolved discrepancies between fabrication, field installation, and engineering design.
- Managed continual-improvement activities to enhance the quality system and meet company objectives.
- Planned, organised, and managed receiving, outgoing fabrication, and quality activities.
- Initiated preventive action against NCRs, prepared punch-list summaries, and monitored clearance.
- Monitored inspection progress and reviewed QA/QC documentation prepared by subordinates.
- Verified fabrication through daily surveillance and inspection against drawings, specifications, procedures, and schedule.
- Reviewed and compiled FDR/MDR documentation before project handover.
- Provided guidance and assistance to QC Inspectors.
- Raised purchase requisitions for inspection tools and assisted procurement sourcing.
- Provided feedback for quality, work-process, and work-method improvements.
- Provided on-the-job training to trainee QC Inspectors.
Jan 2010 – Dec 2010
Rosscor Malaysia Sdn Bhd
QA/QC Engineer
- Maintained Project Quality System and Project Quality Plan compliance during fabrication and commissioning.
- Obtained and reviewed project documentation against specifications, codes, standards, and client requirements.
- Prepared and conducted WPS, PQR, and welder/welding-operator performance qualification procedures.
- Reviewed design drawings for quality-control and code-compliance matters.
- Prepared and compiled Manufacturer Data Records.
- Prepared fabrication procedures for client approval.
- Monitored fabrication activity against engineering and procedural, procurement and material, fabrication, and delivery schedules.
- Coordinated inspections in accordance with the Inspection Test Plan.
Apr 2006 – Dec 2009
TPI AGENCY
Engineering Inspector / Expeditor
- Inspected engineering and industrial pressurised equipment for supply-chain and statutory departments.
- Performed engineering inspections, testing, general inspections, and assignments independently as a competent and qualified Engineering Inspector.
- Ensured pressurised equipment complied with applicable standards and codes.
- Reviewed, inspected, expedited, and reported production status to clients.
- Reviewed RT film, NDT reports, and Manufacturer Data Reports and witnessed PQR, WQT, WPS, and painting preparation.
- Surveyed second-hand equipment and electrical components and assessed machinery valuation and performance testing.
- Witnessed non-destructive testing activities.
- Inspected welding and witnessed and qualified WPS, PQR, and WQT for welders against ASME IX, AWS D1.1, and client-specified codes.
- Performed damage and failure investigation surveys.
- Performed pre-shipment surveys, including packing, marking, and loading supervision.
- Witnessed coating, painting, and blasting inspections for pipes, structures, and vessels.
- Performed rubber/elastomer inspection for fenders and lining.
- Controlled vendor documentation and performed surveillance inspection.
- Provided monitoring and expediting services.
- Inspected crane and hoisting equipment, including pedestal, overhead, and mobile cranes and lifting appliances such as forklifts, shackles, and wire ropes, for new and in-service equipment.
- Inspected rotary equipment including pumps, blowers, motors, and air coolers.
Sep 2003 – Mar 2006
ExxonMobil Manufacturing (M) Sdn Bhd
Technical Operation / Production Assistant
- Monitored and assisted plant operations and maintenance schedules.
- Planned, managed, and coordinated supply-chain activities, planning, replenishment, and inventory to support plant requirements under ExxonMobil guidelines and practices.
- Updated the system as required.
- Assisted the ATS/Plant Operation Superintendent with inspection activities and reviewed fit-up, visual welding, dimensional, verticality, and NDE/NDT reports.
Projects
OCT 2025 – JUN 2026
KIMA Ammonium Nitrate and Nitric Acid Project – Upper Egypt
Vendor: Wasco Process Engineering
Product: Pressure Vessel, Heat Exchanger and Columns
Position: Inspector
OCT 2025 – DEC 2025
Various
Vendor: Excellift Sdn Bhd
Product: Overhead Crane, Hoist, Trolley
Position: Third Party Inspector for DNV
DEC 2024 – JUL 2025
ADNOC AGP MERAM / ARAMCO JAFURAH
Vendor: Jord International - Malaysia
Product: Air Cooler
Position: Expeditor obo Siemens Energy
JUL 2024 – FEB 2025
Raia FPSO Project
Vendor: Emerson Process Management
Product: Control Valves
Position: Inspector obo Modec
JUL 2024 – SEP 2024
Manyar Smelter Project
Vendor: Kanon Loading Equipment Sdn Bhd
Product: Acid Ship Loading Arm
Position: Inspector obo PT Chiyoda International Indonesia
Jun 2024
North Bangkok Power Plant Outage 2024 – GT21
Position: Welding Supervisor / HGP Specialist – GT21 (seconded to Ansaldo Energia)
SEP 2024 – NOV 2024
S1MV Moreno Compression Station
Vendor: CECO Burgess Aarding / Bennova Mechanical Engineering / Fonco Engineering
Product: Blowdown Stack Silencer
Position: Inspector (seconded to Flour USA)
JAN 2024 – DEC 2024
FPSO P72, P80, P82
Vendor: Asia Propel
Product: Pressure Vessel
Position: Third Party Inspector – NR13 (seconded to TUV Brazil)
MAY 2023 – DEC 2023
Melamine Plant for Petronas Chemical Fertilizer Plant
Vendor: Ingersoil Rand, Setiaflex, Wika
Product: Air Dryer Package, Fire Hydrant Hose, Various type of Gauges
Position: Source Inspector (seconded to Technip Energies)
FEB 2023 – MAY 2023
Scarborough SURF EPCI Project
Vendor: LFM Energy / Goldini Engineering Work Sdn Bhd
Product: Buckle Arrestor
Position: Source Inspector (seconded to Subsea 7)
MAR 2022 – JAN 2023
Reliance Industries Limited ~ KGD6 Block Field Development Additional MEG Reclamation Facilities
Vendor: Wasco Energy / Jutasama Sdn Bhd
Product: Pressure Vessels (various sizes and materials)
Position: Resident Quality Inspector (seconded to Schlumberger Cameron)
JUN 2021 – DEC 2021
Rebuilt DHT Petronas, RAPID
Vendor: Sanwa Iron
Product: Various size and type of Bolt and Nut
Position: Inspector (seconded to Tecnicas Reunidas)
MAY 2021 – DEC 2021
Application of Digital Oil Field Technology on Brownfield Towers in Zakum Field
Vendor: Mirvalve Sdn Bhd
Product: Various size and type of Manual Operative Valve
Position: Vendor 3rd Party Inspector
DEC 2020 – APR 2021
Reliance KGD6 Ruby FPSO
Vendor: Asia Propel Sdn Bhd
Product: Pressure Vessels, Skids and Piping. Package – Produce Water Treatment Package
Position: Fabrication Supervisor / Coordinator (seconded to Schlumberger Cameron)
DEC 2020 – APR 2021
Reliance KGD6 Ruby FPSO
Vendor: Asia Propel Sdn Bhd
Product: Pressure Vessels, Skids and Piping. Package – Produce Water Treatment Package
Position: Fabrication Supervisor / Coordinator (seconded to Schlumberger Cameron)
SEP 2020 – DEC 2021
HRRL Barmer Rajasthan Refinery Project - Diesel Hydro Treating Unit & Hydrogen Generation Unit
Vendor: Steelcon Heat Transfer Sdn Bhd
Product: Refractory Lined Outlet Header & Refractory Lined Piping (Reformer Package - 115-F- 0201) and Inlet System
Position: Inspector (seconded to JNK Heaters Co. Ltd)
JUL 2020 – NOV 2020
Offshore Process Platform (CPP&LQUP) Project for Development of KG- DWN- 98/2 NELP Block, Kakinada
Vendor: ISS Sdn Bhd / Steelcon Heat Transfer Sdn Bhd
Product: Pressure Vessels, Skids and Piping. Package – TEG Package and Scrubber Package.
Position: Client Site Representative (seconded to Afcons Construction)
MAY 2020 – NOV 2020
Supply of Regeneration Heater (33-E002)
Vendor: Boustead Internal Heater / Steelcon Heat Transfer Sdn Bhd
Product: Regeneration Gas Heater
Position: Inspector (seconded to Qatar Gas Operating Co Ltd)
MAR 2020 – JUL 2020
Sulphuric Acid Plan (SAP E and SAP U) Josf Lasfar Power Plant Morroco
Vendor: Sterling Deaerator Company / Vesseltech Engineering Sdn Bhd
Product: Deaerator and Storage Tank
Position: Inspector (seconded to Intecsa Industrial)
MAR 2020 – MAY 2020
EPC Al Dabb’iya Thamama Zone B Transition Dev. Project
Vendor: Mir Valve
Product: Manual Ball Valve ~ various size and type.
Position: Vendor Source Inspector (seconded to Archirodon Construction)
SEP 2019 – FEB 2020
EPCIC Pegaga Development Project
Vendor: Mir Valve, Emerson Process, True Features Corp., Turcomp, Favel Favco, Webforge, WV Valve
Product: MOVs, Control valves, Skid Structure and Piping, Pedestal Crane, Grating, Valves (Ball, Gate and Globe)
Position: Vendor Source Inspector (seconded to Sapura Fabricator Sdn Bhd.)
JAN 2019 – JUN 2019
Coral MEG Project
Vendor: Amalgamated Metal Corporation (AMC), Wika Instrument, Emerson Process, Win- Fung Fiberglass
Product: Various nos of Pressure Vessels / Chemical Injection Skid/ Instrumentation items (Pressure gauges, Temperature gauges, Analysers etc.) / FRP Tank and piping.
Position: Vendor Inspector cum Expeditor (seconded to Cameron Solutions/ Schlumberger)
JUL 2018 – SEP 2018
BSP Glycol System Upgrade
Vendor: Vesseltech / Geveke
Product: Various nos of Pressure Vessels / Chemical Injection Skid (Skid Structure, Piping, Pressure Vessel)
Position: Fabrication Supervisor / Coordinator (seconded to Cameron Solutions/ Schlumberger)
NOV 2017 – MAY 2018
Persian Gulf Bid Boland Gas Treating Project
Vendor: Vesseltech, Steelcon
Product: Various nos of Pressure Vessels / 3 units of TEG Regeneration Packages (Skid Structure, Piping, Pressure Vessel, E&I equipments)
Position: Project Coordinator / Inspector (seconded to Sajeh Jahanpars Cons. SJC)
JUN 2017 – OCT 2017
Samref 2017 TA Waste Heat Boiler & Non-Major Project
Vendor: Burgess Aarding / Fonco Engineering
Product: Blowdown Drum PSV Silencers
Position: Inspector (CAS seconded to ExxonMobil)
JUN 2017 – JUL 2017
ABPR4 Project
Vendor: Vesseltech
Product: CTCS Strainer, CTCS Pump Skid (c/w Ball Sorter & Ball Collector), CTCS FRP Piping
Position: Inspector (seconded to TPSC)
AUG 2016 – APR 2017
PETRONAS RAPID Pengerang Project
Vendor: KNM Shah Alam, Petra Fabricator, Peer Mark, Jutasama
Product: More than 100 nos of Pressure Vessels / Filter vessels for Package 2, 3 & 5
Position: Resident Expeditor (seconded to Fluor – Rapid PMC)
JAN 2016 – APR 2016
FPSO~ Ghana OCTP Development Project
Vendor: Petra Fabricator
Product: Filter Vessels (Dual Media Filter) and Tote Tank (Fresh Water Surge Tank)
Position: Quality Inspector cum Expeditor (seconded to Siemens Pte. Ltd)
JUL 2014 – DEC 2015
TGAST Development Project ~ Petronas Carigali
Vendor: Petra Fabricator / Asturi Metal Builders
Product: 18 nos of Pressure Vessels (Gas Filter Coalescer, Dry Gas Filter and Dust Filter); 18 nos of Skid Packages (Structure, Piping & Instrumentation)
Position: Resident Inspector (seconded to Cameron Solutions)
JUN 2013 – JAN 2014
Bibiyana Expansion Project Bangladesh ~ Chevron Bangladesh
Vendor: KNM Exotic Equipment, Petra Fabricator, Vesseltech & Steelcon
Product: Glycol Contactor & HP Separator Vessel, 2 units of TEG Regeneration Package (Skid Structure, Piping, Pressure Vessel)
Position: Resident Inspector cum Expeditor (seconded to Foster Wheeler Thailand)
APR 2013 – JUN 2013
1 X 1000 MW Manjung Coal Fired Power Plant Project.
Vendor: MMHE ATB
Product: Mixed Bed Exchanger 04LDF20AT001 (Pressure vessel completed with internal rubber lining)
Position: Inspector cum Expeditor (seconded to Tenaga Nasional Berhad)
APR 2013 – JUN 2013
Tan Burrup Project
Vendor: Tepat Teknik
Product: Carbon Steel Pressure Vessel
Position: Inspector (seconded to Tecnicas Reunidas)
JAN 2013 – APR 2013
Client: Petrobras
FPSO CIDADE DE ILHABELA Project ~ Petrobras
Vendor: VME Process & Petra Fabricator, Shah Alam
Product: Chemical Injection Package & Produced Water Treatment Package
Position: Resident Inspector / Expeditor (seconded to SBM Offshore Netherlands)
Client: Enquest
DEAA Seligi Platfrom
Vendor: AJ Petroleum Sdn Bhd
Product: Ball Valve, Check Valve and Globe Valve
Position: Source Inspector (seconded to Exergy SpA)
- Performed inspection as per NOI, mainly visual and dimensional inspection, testing witnessing, FAT, and documentation review.
Client: Various
Various ULJANIK,Croatia, Port Tanjung Pelepas, Johor, Cai Mep New Port, Vietnam.
Vendor: Shibata Asia Sdn Bhd, MSL Rubber Sdn Bhd
Product: Structure (Marine Rubber Fender & Frontal Frame)
Position: Source Inspector (seconded to Exergy SpA)
- Represented the client during inspection of Marine Rubber Fender and Frontal Frame.
- Witnessed visual inspection, mechanical testing, dimensional inspection, painting inspection, pull-off testing, coating thickness checks, and painting finish activities against the client’s ITP.
- Reviewed and endorsed the Manufacturer’s Data Report, mill certificates, and related reports.
- Expedited fabrication activities to keep progress aligned with the project schedule and client delivery target.
Client: Veolia Water Singapore
SBM LIZA DESTINY - FPSO EPCI
Vendor: Vesseltech
Product: Pressure Vessel
Position: Source Inspector (seconded to Exergy SpA)
- Performed inspection as per NOI, mainly visual and dimensional inspection, hydrostatic testing and painting witnessing, and documentation review.
Client: Cameron Solutions Sdn Bhd
Coral South Development Project
Vendor: Sedia Teguh Sdn Bhd / VTS Ventures Sdn Bhd
Product: Valves (Ball, Check, Globe, Butterfly)
Position: Source Inspector (seconded to Exergy SpA)
- Performed inspection as per NOI, mainly visual and dimensional inspection, testing witnessing, FAT, and documentation review.
Client: RAPID PMC
PETRONAS RAPID Pengerang Project
Vendor: Emerson Process, Nilai / Excellift Sdn Bhd / Elster Instromet / AVF Swagelok
Product: Control Valve ~ various size / Hoist & Cranes / Metering Skid / Instrument valve and fittings
Position: Source Inspector (seconded to Exergy SpA)
- Performed visual and dimensional inspection, witnessed FAT and hydrostatic testing, and reviewed documentation.
Client: Foster Wheeler Singapore / ExxonMobil Asia Pacific; Saudi Basic Industries Corporation (SABIC); CTCI Corporation
Various
Vendor: Emerson Process, Nilai
Product: Control Valve ~ various size
Position: Source Inspector (seconded to Exergy SpA)
- Performed visual and dimensional inspection, witnessed FAT, and issued IRN.
Client: 1. Chevron Thailand Exploration & Production Ltd 2. ITT SpA
1. Funan Fire Heater (CHF) Upgrade Thailand Exploration Project 2. Kaveh Methanol Plant Project
Vendor: Steelcon
Product: 1. Coil Assembly Tube Bundle, Burner & Refractory Material 2. Cold Collector & Transfer Line – Refractory Column
Position: Source Inspector (seconded to Exergy SpA)
- Performed visual and dimensional inspection and witnessed related refractory testing, including actual and laboratory testing.
Client: First Quantum Mineral Ltd
Kansanshi Cooper Smelter Project
Vendor: Air Product, Tanjung Langsat
Product: 2 units of A750 Cold Box Assembly
Position: Source Inspector (seconded to Exergy SpA)
- Performed visual and dimensional inspection, witnessed pressure testing, and reviewed documentation.
Client: CUEL Thailand Ltd
Chevron Phase 48
Vendor: SANWA Iron (Malaysia), Fukar Sdn Bhd
Product: Various sizes, type of Bolt & Nuts
Position: Source Inspector (seconded to Exergy SpA)
- Performed visual and dimensional inspection, witnessed testing, reviewed documentation, and issued IRN.
Client: Various
Various
Vendor: Hexagon Composite (Malaysia)
Product: Various type & size of FRP – Structure, Profiles and Tank
Position: Source Inspector (seconded to Exergy SpA)
- Performed inspection including testing witnessing, documentation review, and IRN issuance.
Client: Various
Various
Vendor: Win Fung Fibreglass (Malaysia)
Product: Various type & size of FRP Tank
Position: Source Inspector (seconded to Exergy SpA)
Location: Win Fung Fibreglass (Malaysia)
- Performed inspection including testing witnessing, documentation review, and IRN issuance.
Client: LTESA
Seawater RO-4 Potable Water, Jubail
Vendor: TAMCO Switchgear (Malaysia)
Product: Low to High Voltage Switchgear (4.6kV to 34.5KV Switchgear VCB Panel)
Position: Source Inspector (seconded to Exergy SpA)
Location: TAMCO Switchgear (Malaysia)
- Performed visual and dimensional inspection, functional checks, dielectric testing, contact resistance testing, mechanical operation checks, primary and secondary checks, performance testing witnessing, and documentation review.
Client: Shell Offshore, Inc.
Shell Stones Disconnectable FPSO
Vendor: Tepat Teknik Sdn Bhd, Sungai Kandis, Klang
Product: Chemical Injection Package
Position: Source Inspector (seconded to Exergy SpA)
Location: Tepat Teknik Sdn Bhd, Sungai Kandis, Klang
- Performed inspection and surveillance, witnessed testing and FAT, and reviewed documentation as per ITP.
Client: Flour Daniel Pacific Inc.
Malampaya Phase 3, Shell Philippines Exploration
Vendor: Petra Fabricator Sdn Bhd, Tanjung Energy Services
Product: DCP Instrument Air Filters , Nitrogen Gas Generation Skid
Position: Source Inspector (seconded to Exergy SpA)
Location: Petra Fabricator Sdn Bhd, Tanjung Energy Services
- Performed inspection and surveillance, witnessed testing and FAT, and reviewed documentation as per ITP.
Client: 1. Al Warka’a Company Dubai 2. Petronas Rapid
Vendor: Kejuruteraan Trisuria Sdn Bhd
Product: Stainless Steel Penstock / 304 Wall Mounted Penstock
Position: Source Inspector (seconded to Exergy SpA)
Location: Kejuruteraan Trisuria Sdn Bhd
- Performed visual and dimensional checks.
Client: Aker Solutions
Kraken Enquest WP05
Vendor: Extremach Manufacturing Services Sdn Bhd
Product: Stop Pin, Breach Lock, Hybrid Penetrator
Position: Source Inspector (seconded to Exergy SpA)
Location: Extremach Manufacturing Services Sdn Bhd
- Performed visual and dimensional inspection, witnessed testing, reviewed documentation, and issued IRN.
Client: Berlian McDermott Asia Pacific
BMD Kikeh Phase 2
Vendor: Aker Solutions, PKFZ, WestPort, Bandak Group
Product: IB Porch, Hub , Guide & Tie In Unit
Position: Source Inspector (seconded to Exergy SpA)
Location: Aker Solutions, PKFZ, WestPort, Bandak Group
- Performed visual and dimensional inspection, witnessed testing, and reviewed documentation.
| Patricia Development Project/ Serendah Development Project | Chemical Injection System | KHL / Murphy Oil Sarawak |
|---|
| Cendor Phase 2 - FPSO Project | Chemical Injection System | MMHE / Petrofac /MISC |
| Garraf Field Project | Chemical Injection System | Petronas Carigali Iraq BV |
| KBB Northern Hub Project | Chemical Injection System | Sime Darby / KPOC |
| Baram Dev. Project Cluster 3 / West Lutong Project / Bokor Field (BODP-B) | Chemical Injection System | Carimin / Petronas Carigali |
| Sumandak NAG Dev. | Methanol Injection Skid | KHL / Petronas Carigali |
| SK 309 Phase 1 – GOP-A / GOP-B | Chemical Injection System | Petra / Murphy |
| Berantai FPSO– Offshore Malaysia | Chemical Injection Package | Petrofac / Petronas Carigali |
Client: Murphy Oil Sarawak
MEPA Project
Vendor: Petra Fabricator, Jutasama, Jord Malaysia, Brooke Dockyard
Product: Chiller Package (Pressure Vessel- Air Steam Cooler, Filter, Pump Skid, Skid Structure, etc)
Position: QA/QC Engineer
- Prepared fabrication procedures for client approval.
- Monitored fabrication activity to meet the schedule for engineering and procedural, procurement and material, fabrication, and delivery status.
- Coordinated inspections as per the Inspection Test Plan.
Client: Cairn Energy India Pty. Limited / Kupps & Sachs Pte. Limited
Ravva PWRI-II Project
Vendor: Vestech Engineering, Ipoh, Perak
Product: Induced Gas Floatation Unit RT-V-1602-B & Skid Produced Water Media Filter RT-V-504G – U Stamp Pressure Vessel
Position: Engineering Inspector / Expeditor
Client: Samsung Heavy Industries Ltd., Korea
Schahin 1 & 2 Project
Vendor: Vesseltech Engineering, Balakong, Selangor
Product: 4 units of Mud & Gas Separator & Liquid Seal
Position: Engineering Inspector / Expeditor
Client: Sime Darby Engineering Sdn Bhd
ONGC B-193 Project
Vendor: BC Petrochemical Sdn Bhd, Anshin Steel Services, Khansforge Sdn Bhd, AMC Kuantan, Pantech Industries Sdn Bhd
Product: Crude Condensate Transfer Pumps and Diesel Transfer Pumps (skid), Platform Structural Chequered Plate, Galvanize Grating, Pressure Vessel, Various sizes of pipe.
Position: Engineering Inspector / Expeditor
Client: Mitsubishi Heavy Industries Ltd., Japan
Algeria Oman Fertilizer
Vendor: Yee Loong Engineering
Product: Mountable Derrick, Riser, Pressure Vessel
Position: Engineering Inspector / Expeditor
Client: Mitsubishi Heavy Industries (MHI) Nagasaki, Japan
Paiton Expansion Project of PT Paiton Energy, Indonesia
Vendor: PMI-Technology Sdn Bhd, Vantage Engineering Sdn Bhd
Product: Guide Bearing Assembly, Support Bearing Assembly, Ljungstrom Air Preheater
Position: Engineering Inspector / Expeditor
Client: Offshore Engineering & Construction Company (IOEC).
South Pars Gas Field Development Phase 12
Vendor: Favelle Favco Senawang Negeri Sembilan.
Product: 3 units of Pedestal Crane
Position: Engineering Inspector / Expeditor
Client: Hyundai Heavy Industries Ltd. Korea
FPSO - Usan Deepwater Development Project
Vendor: Global Process System / Veolia Water Solution Technologies Ltd
Product: Topside – Glycol Dehydration & TEG Package, Flare & HC Blanket Gas Recovery Package and Fine Filter Package
Position: Engineering Inspector / Expeditor
Location: Jutasama Sdn Bhd, AMC Kuantan, Penaga Dresser & Johnson Pump
Client: Samsung Heavy Industries Ltd. Korea
Gazflot 1 Project
Vendor: National Oilwell Varco
Product: Trip Tank
Position: Engineering Inspector (Client’s representative)
Location: Vesseltech Engineering Sdn Bhd
Client: Petronas Carigali Sdn Bhd
Kumang Cluster Development Project – Gas Dehydration & TEG Regeneration Package
Vendor: Sulzer Chemtech Ltd. Singapore
Product: Glycol Dehydration Package: -Contactor Equipment - Column Internals and SMS for C-2210, C-9555 and E-9551
Position: Engineering Inspector / Expeditor
Client: Petronas Carigali Sdn Bhd
Kumang Cluster Development Project– Gas Dehydration &TEG Regeneration Package
Vendor: Global Process System
Product: Pressure Vessel - Glycol Still Column ,Glycol Stripping Column , Glycol Filter, Activated Charcoal Filter, pH Balancing, Antifoam Tank.
Position: Engineering Inspector / Expeditor
Location: Vesseltech Engineering Sdn Bhd, Malaysia
Client: Daewoo E & C Ltd. Korea
Misurata Combined Cycle Project / Benghazi Combined Cycle Project
Vendor: MHE Demag
Product: STG Overhead Crane and GTG Hoists
Position: Engineering Inspector / Expeditor
Client: Samsung Engineering Services Limited, Korea
PTT Ethane Separation Plant Project
Vendor: John Zink Company, LLC USA
Product: Demountable Derrick Flare Package
Position: Engineering Inspector / Expeditor
Location: Yee Loong Engineering Sdn Bhd, Malaysia
Client: Ircon International Limited, India
KTM Electrified Double Track Project – Seremban Gemas
Product: Steel rails Section (UIC54)
Position: Project Coordinator
Location: West Port / Seremban
Client: Tsukishima Kankyo Engineering Limited, Japan
ZRCC Ethylene Project – Spent Caustic Incineration – POSM Plant
Vendor: Amalgamated Metal Corporation Sdn Bhd, Malaysia
Product: SS Venturi SP11103 / 11203 /11104/11204
Position: Engineering Inspector / Expeditor
JUL 2008 – AUG 2008
Client: Petronas Carigali Sdn Bhd
Betty Revisit Project (Petronas Carigali)
Vendor: Solar Alert Sdn Bhd
Product: 10K Wellhead and Christmas tree.
Position: Engineering Inspector / Expeditor
APR 2008 – JUN 2008
P&ID & PFS Updating and Services, PETRONAS Asean Bintulu Fertilizer, Bintulu, Sarawak
Position: Piping Inspector
Location: Bintulu, Sarawak
JAN 2008 – MAR 2008
Tuanku Jaafar Rehabilitation Project Phase 2, 750 MW Combined Cycle Power Plant, Port Dickson
Position: Third Party Inspector for DOSH requirement Specs. / DOSH.
Location: Port Dickson
Jan 2008
Client: Petronas Carigali Sdn Bhd
Betty Revisit Project (Petronas Carigali)
Vendor: Solar Alert Sdn Bhd
Product: 5k wellhead and Christmas Tree.
Position: Engineering Inspector / Expeditor
JUL 2007 – NOV 2007
Client: Toshiba / TOS Energy (M) Sdn Bhd
2 X 700MW Coal –Fired Power Plant Project -JIMAH / 750 MW Combined Cycle Power Plant PD-2 (Seconded to TOS Energy (M) Sdn Bhd)
Vendor: Tepat Teknik
Product: Various size of pipe spools
Position: QC Inspector / Piping Supervisor
2 X 700MW Coal –Fired Power Plant Project -JIMAH / 750 Combined Cycle Power Plant PD-2
Product: 2 units Condenser, 2 units Deaerator, 4 units Gland Steam Condenser, 2 units Turbine by Pass Nozzle, 1 unit Lube Oil Tank, 2 units Condensate Storage Water Tank, all various piping for Deaerator, Water Tank, and Condenser.
Position: QC Inspector / Equipment Supervisor
Kemaman Bitumen Project
Product: Piping systems
Position: QC Inspector / Equipment Supervisor
- Inspected 21 piping systems for handover before pre-commissioning.
- Carried out line checks by line system and verified test packages.
- Issued punch lists and punch kills, reviewed completion of piping test packages, and endorsed as-built drawings.
- Verified P&IDs against sub-drawings and isometric drawings.
Client: Chiyoda Technip Joint Venture
RasGas Onshore Expansion Project Phase 2
Vendor: Emerson Process Management Manufacturing (M) Sdn Bhd
Position: QC Inspector / Equipment Supervisor
Sumatec (M) Sdn Bhd, Malaysia (Sumatec-JCC)
Product: 72 units of pressurized items/vessels, including columns, towers, air-fin coolers, fired heaters, heat exchangers, and boilers.
Position: QC Inspector / Equipment Supervisor
- Performed third-party inspection for re-qualification of 72 pressurized items and vessels under statutory requirements.
- Submitted reports to DOSH/JKKP for design approval and performed integrity checks for the 72 pressure vessels.
Client: Mitsubishi Heavy Industries (MHI) Nagasaki, Japan
Rabigh IWSP Project, Saudi Arabia
Vendor: MHE Demag Malaysia Sdn Bhd, Malaysia
Product: 1 unit of Workshop Overhead Crane (10 Ton x 9.1 m Double Girder Crane ZKKE)
Position: Engineering Inspector / Expeditor
Client: Mitsubishi Heavy Industries (MHI) Nagasaki, Japan
Shuqaiq II IWPP Project, Saudi Arabia
Vendor: MHE Demag Malaysia Sdn Bhd, Malaysia
Product: 1 unit of CWP Gantry Crane (50/12 Ton x 11.6m Double Girder Electric Full Portal Crane)
Position: Engineering Inspector / Expeditor
Location: MHE Demag Malaysia Sdn Bhd, Malaysia
Skills
- Client Site Representation
- Fabrication Coordination
- Welding Supervision
- Welding Inspection
- Quality Inspection
- Vendor Source Inspection
- Third-Party Inspection
- Expediting
- QA/QC Management
- Project Quality System Management
- Project Quality Plan Management
- Fabrication Procedure Preparation
- Quality Auditing
- Document Review and Control
- NDT Coordination
- Coating / Painting Inspection
- Subsea and Wellhead Equipment Inspection
- Mechanical and Piping Inspection
Commodities
- Castings
- Forgings
- Plate
- Bolts and Nuts
- Fittings
- Structural Materials
- Stack
- Chamber
- Ducting
- Strainers
- Silencers
- FRP/GRP
- Machined Products
- Rubber Materials
- Pressure Vessels
- Air Cooled Heat Exchangers
- Heat Exchangers
- Columns
- Drums
- Boilers
- Heaters
- Coalescers
- Scrubbers
- Separators
- Tote Tanks
- Pumps
- Gear Boxes
- Motors
- Fans
- Pump Skids
- Chemical Injection Packages
- Air Compressor Packages
- Air Dryer Packages
- Hydro Cyclone Skids
- TEG/MEG Regenerator Packages
- Cooling Tower Packages
- HVAC Systems
- Casing Head Spools
- Hangers
- Tubing
- Drilling Equipment
- Risers
- Sleeves
- Xmas Trees
- Piping
- Pipe Spools
- Valves
- Filters
- Manual Chain Pulley Blocks
- Cranes
- Hoists
- Cable Trays
- Switchgear
- Generators
- Circuit Breakers
- Analyzers
- Pressure Gauges
- Temperature Gauges
- Coating Material
- Rubber Lining
- Rails
- Lifting Appliances