2026-08-24-cv-extraction-v9; the current pipeline is 2026-08-28-cv-extraction-v10. Regenerate this CV before re-testing an issue against it.SREERAG AROLI VEETTIL is a qualified E&I technical expert with 11+ years of experience across quality control, business development, sales, estimation and procurement. He has supported Petrochemical, Oil & Gas and construction projects, with hands-on experience in the installation, testing and commissioning of electrical equipment. His inspection and quality scope covers E&I systems, DCS/SCADA, F&G/ESD systems, generators, transformers, switchgear, cables, telecom and security systems. He reviews and approves quality documentation, ITPs and electrical drawings, coordinates with clients, contractors, vendors and sub-vendors, and attends FAT and SAT activities. He also completed Ex-Inspection Test Reports with no outstanding punch-list items before energization of potentially explosive equipment.
| PROJECT | CLIENT | VENDOR | COMMODITY |
|---|---|---|---|
| HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 2 - ONSHORE FACILITIES | TECHNIMONT | ELSEWEDY DIGITAL | TELECOM SYSTEM EQUIPMENTS/ACS/CCTV/LAN |
| HAIL & GHASHA DEVELOPMENT PROJECT PACKAGE 2 - ONSHORE FACILITIES | TECHNIMONT | ELSEWEDY DIGITAL | SECURITY SYSTEM CABINET (ACS & CCTV/LAN)- FACTORY ACCEPTANCE TEST, PACKING INSPECTION |
| KARACHAGANAK EXPANSION: THE 2ND (KEP1B) PHASE OF CONSTRUCTION. WKO, KARACHAGANAK OIL & GAS CONDENSATE FIELD (KOGC). | MERLION SICIM | AESTHETIX | TELECOM SYSTEM EQUIPMENTS |
| NEOM GREEN HYDROGEN ELEMENTS | AIR PRODUCTS | EMIRCOM | TELECOM SYSTEM EQUIPMENTS/PACKAGE |
| SYAMA ROSTER PROJECT | IQS | NEELKANTH CABLES | ELECTRICAL CABLES-LV/MV |
| ADNOC GAS PROCESSING EXECUTE STAGE RUWAIS CAPACITY ENHANCEMENT OF NGL TRAINS 1, 2, 3 & 4 | L & T | CORTEM GULF | CABLE GLANDS & ELECTRICAL FITTINGS AND CONDUITS |
| DP161 WQ CS8 NEW TEG PACKAGE | SLB | INTEGRATED INDUSTRIES | FINAL INSPECTION GENERATORS-EMERGENCY DIESEL GENERATOR-PACKAGE |
| BUZIOS FIELD AREA DEVELOPMENT PETROBRAS 82 | REI PROCESS PTY LIMITED | AL GURG | DIESEL GENERATOR |
| EPC FOR BAB FACILITIES UPGRADE PROJECT | ROBT STONE | ABB | DIESEL GENERATOR |
| HV/LV ELECTRICAL SYSTEM UPGARDE AT USSC | FALCOR ENGINEERING | CUMMINS | FAT -GENERATOR SYSTEM-DIESEL GENERATOR |
| AR RATAWI GAS MIDSTREAM PROJECT | AKT OIL SERVICES COMPANY | BERG INDUSTRIES LLC | PREFABRICATED OUTDOOR SUBSTATION FOR CAMP (E HOUSE)-FACTORY ACCEPTANCE TEST |
| PROJECT CERES | JV-NPCC- SAIPEM | CB&I AUSTRALIA & ZENNER MEASURING CONTROL SYSTEMS INSTALLATION AND REPAIRING LLC | HONEYWELL PRESSURE TRANSMITTER – VISUAL, HYDRO TEST, POWER ON TEST, REVIEW OF TEST CERTIFICATE & REPORT |
| BOROUGE4 PROJECT | TECHNIMONT | SAS POWER INDUSTRIES FZE | HVAC PANEL &DISTRIBUTION PANEL-VISUAL, DIMENSION, HV TEST, IR TEST, FUNCTIONAL TEST OF SWITCHGEAR, PRIMARY INJECTION OF CT, SECONDARY INJECTION, CIRCUIT CONTACT RESISTANCE TEST. |
| EPCM FOR BAB FAR NORTH FULL FIELD DEVELOPMENT PROJECT (BFN | KENT | EMERSON FZE | PREDICTIVE EMISSION MONITORING SYSTEM (PEMS) - FAT FOR PEMS SOFTWARE |
| DAMMAM AIRPORT (DACO) PROJECT | ENERGIA | FEDERAL POWER TRANSFORMERS LLC | 20/26 MVA POWER TRANSFORMER - FACTORY ACCEPTANCE TEST |