Summary
Syed Majeed Hussain H is a QA/QC professional with 15 Years and 11 months of experience across Petrochemicals, Oil & Gas and Power Projects, including 7 years in an EPC company. He provides leadership and coordinates with engineering personnel, subcontractors and clients on welding, NDE, piping, vendor inspection and project quality matters. His inspection scope covers steam turbines, turbine generators, gearboxes, pumps, valves, compressors, pressure vessels, piping, structural items and fabrication. He is experienced in welding qualifications, NDE, PMI, hydrostatic and pneumatic testing, material verification, QA/QC documentation, NCR and FTQ resolution, and pre-commissioning activities. His rotating-equipment work includes mechanical run, performance, NPSH, vibration, noise, balancing, overspeed and safety checks, and he received a Schneider Electric Best Employee management award.
Education
- Diploma in Mechanical Engineer from KSEEB (S.S.LC qualification)
Qualifications and Training
- CSWIP 3.1 level II from TWI (UK)
- ASNT UT Level II
- ASNT VT Level II
- ASNT MT Level II
- ASNT RT Level II
- ASNT PT Level II
Codes & Standards
- ASME: Sec II, Sec V, Sec VIII, Sec IX, NBIC.
- API: 1104, 510, 570, 578, 571, 577, 598.
- ANSI: B31.1, B31.3, B31.4, B31.8
- AWS D1.1- Structural Welding Code-Steel
- ASME Sec ll, Sec V, Sec Vlll, Sec lX, ASME B31.3 & B31.1.
- API 610(11th and 12th Edition)
- API 6D (Pipelines and valves)
- API 598 – Testing Pressure Procedure
- ASME B16.34 – Valves Flanged, Threaded and Welding End & NDT
- ASME B16.50 – Flange Related detail selection.
- ASME 31.3 – Process piping
Work Experience
2020 – Present
FREELANCE (Various clients)
- Performed third-party mechanical inspection for steel plants, casting, petrochemical plants and industrial projects for clients including TR, Technip, Technimount and Wood.
- Inspected steam turbines, turbine generators, gearboxes, pumps, compressors, valves, pressure vessels, piping, structural items, skids and fabrication.
- Performed rotating-equipment, pump, turbine, valve, material, casting, welding, NDT, PMI, hydrotest, performance-test, balancing, vibration, noise, painting and packing inspections.
- Reviewed MTCs, calibration certificates, drawings, datasheets, QAPs, ITPs, NDT reports and final documentation; generated inspection reports and release notes.
- Expedited inspection and production activities and coordinated NCR, FTQ and SDR resolution with subcontractors and clients.
- Witnessed WQT, WPS/WPQT, PQR destructive testing and welder training for SMAW, GMAW and SAW processes.
- Supported assembly, erection, pre-commissioning, commissioning, preservation, material traceability and equipment acceptance activities.
⚠ Review: dates overlap with JGC (JAPAN GAS CORPORATION)
Mar 2018 – Jul 2020
JGC (JAPAN GAS CORPORATION)
QC INSPECTOR
- Co-ordinated QC activities and joint safety walkthroughs with construction, safety and client representatives.
- Issued and executed permits to work for critical areas, piping and NDE processes.
- Co-ordinated and witnessed SCAR-RT and TOFD teams for piping NDE.
- Performed line checks and punch closing before and after hydrotesting.
- Confirmed skid-package materials through PMI using XRF and OES machines.
- Verified vendor drawings, receiving packages, vendor reports, project specifications and purchase-order requirements.
- Supported QC activities during pre-commissioning and material/equipment failure analysis, root-cause analysis and non-conformance reporting.
- Supported duplex stainless-steel ferrite and hardness testing and other NDE activities.
- Managed equipment and material quarantine until certification, replacement or acceptable conditions were confirmed.
⚠ Review: dates overlap with FREELANCE (Various clients)
Dec 2012 – Jan 2018
JGC (JAPAN GAS CORPORATION)
QC INSPECTOR
- Witnessed and monitored piping NDE in accordance with project specifications.
- Performed PQR and WQT for duplex, super duplex, Incoloy, Inconel, stainless steel, carbon steel and LTCS materials.
- Witnessed mechanical testing and manual-count ferrite measurement for duplex and super-duplex PQRs.
- Performed visual and dimensional inspections using drawings and quality plans.
- Directed and coordinated technical personnel conducting welding inspections and testing against procedures, standards and national code requirements.
- Monitored subcontractor QA/QC documentation, welding consumable stores, welder performance, project NDT status and repair rates.
- Witnessed hydrostatic and pneumatic testing of piping and pressure vessels and performed piping line checks.
- Inspected live-plant welding joints, pressure-vessel weld repairs and injection-package skids.
- Reviewed customer and engineering specifications and prepared quality assurance and functional-testing procedures.
- Prepared NDE procedures in accordance with ASME Sec. V / VIII Div.1.
- Prepared field technical query plans and coordinated resolution of FTQs, NCRs and SDRs.
- Checked piping systems, components, in-line equipment and instruments against P&IDs and isometric drawings.
- Prepared unfinished-work and mismatched-item lists and reinstatement reports after hydrotesting.
- Prepared as-built drawing information and completion records for handover to pre-commissioning.
Dec 2007 – Nov 2012
SCHEINDER ELECTRIC INDIA PVT LTD
QUALITY PROCESSOR
- Compiled documents for handover of works.
- Performed data entry of certificates for project completion.
- Prepared dossiers and handled documentation work.
- Interacted with various departments to collect data.
- Assisted with secretarial work and checked dispatch accuracy.
- Maintained electronic filing and presented and filed documents and drawings.
- Handled incoming and outgoing calls.
Projects
| Vendor | Client | Item | Project | Year | Status |
|---|
| Triveni Turbine | DL E & C (DAELIM) | Steam Turbine | AGCC PE/LAO PJT | 2026 | Completed |
| Triveni Turbine | DL E & C (DAELIM) | Gearbox | AGCC PE/LAO PJT | 2026 | Completed |
| Triveni Turbine | Persian Gulf Hormoz Petrochemical Co | Steam Turbine | 2026 | Ongoing |
| Triveni Turbine | KSB | Steam Turbine | Long Term (LT) Works for Habshan Debottlenecking (DBN) | 2025 | Completed |
| Triveni Engineering Industries Limited | Adnoc | Gearbox | Hail & Gasha Project | 2025 | Completed |
| Triveni Turbine | Samsung Engineering | Steam Turbine | Baltic Chemical Plant Cracker | 2024 | Completed |
| Triveni Turbine | Samsung Engineering | Gearbox | Baltic Chemical Plant Cracker | 2024 | Completed |
| Triveni Turbine | Saipam | Steam Turbine | Burrup Urea Australia, AUSTRALIA | 2024 | Completed |
| Triveni Turbine | Adnoc | Steam Turbine | Hail & Gasha Project | 2025 | Ongoing |
| Elliot Ebara Turbo machinery India Pvt Ltd | Hyusung Good spring | Steam Turbine | Ras Laffan Petrochemical QATAR | 2025 | Completed |
| Elliot Ebara Turbo machinery India Pvt Ltd | Hyusung Good spring | Steam Turbine | Ras Laffan Petrochemical QATAR | 2025 | Completed |
| Elliot Ebara Turbo machinery India Pvt Ltd | Samsung Engineering | Steam Turbine | Ras Laffan Petrochemical QATAR | 2025 | Completed |
| Flowserve/Armstrong | Adnoc | Pumps | Hail & Gasha Project | Ongoing |
| Weir Minerals India Pvt Ltd | Jesa | Pumps | DAOUI FILTRATION | 2025 | Completed |
| Weir Minerals India Pvt Ltd | L&T | Pumps | Sagardighi Thermal Power Project (2X300 MW+ 2X500 MW) | 2024 | Completed |
Languages
Skills
- QA/QC Inspection
- Mechanical Inspection
- Third-Party Inspection
- Welding Inspection
- NDE Inspection
- Piping Inspection
- Vendor Inspection
- Material Inspection
- Rotating Equipment Inspection
- Valve Inspection
- Quality Documentation
- Expediting
- Pre-commissioning Support
- WPS / WPQT Qualification
- NCR / FTQ Resolution
- Project Coordination
Commodities
- Steam Turbines
- Turbine Generators
- Gearboxes
- Pumps
- Compressors
- Motors
- Valves
- Pressure Vessels
- Drums
- Heat Exchangers
- Agitators
- Piping
- Pipe Fittings
- Flanges
- Castings
- Forgings
- Structural Steel
- Plates
- Fasteners
- Gaskets
- Skid Packages
- Oil Lubrication Systems
- Cooling Water Systems
- Rubber Lining
- Electrical Components