Shi Rutong
SUMMARY
Mr. Shi Rutong is a highly experienced QA/QC Engineer and Senior Expeditor with over 12 years in quality inspection and manufacturing control. Their expertise encompasses a wide range of industrial equipment, including mixing plants, centrifugal fans, generator shafts, HRSG, steam boilers, tube panels, pressure vessels, air ducts, water-cooled systems, and valve groups. They excel at supplier auditing, inspection plan review, production expediting, and ensuring product quality through detailed reporting and verification testing.
education
- Ningbo University - Bachelor in Mechanical Engineering and Automation
QUALIFICATIONs AND TRAINING
- Welding Inspector (CWI) from American Welding Society (AWS), AWS QC1, Standard for AWS Certification of Welding Inspectors, Certificate Number: 16081901, Issue Date: Aug 2016, Expiration Date: Aug/01/2028
- International Welding Engineer (IWE) from International Institute of Welding (IIW), ID Number: 321322198508126816, Diploma Number: CNIWE22, Issue Date: Sep 2025
- NDT Level II, Magnetic Particle Testing from CCIC Shaanxi, EN ISO 9712-2021, Certificate Number: 231103302, Issue Date: Nov 21,2023, Expiration Date: Nov 20,2028, Product Sectors: Welds, Forgings, Castings
- NDT Level II, Liquid Penetrant Testing from CCIC Shaanxi, EN ISO 9712-2021, Certificate Number: 231103302, Issue Date: Nov 21,2023, Expiration Date: Nov 20,2028, Product Sectors: Welds, Forgings, Castings
- NDT Level II, Ultrasonic Testing from CCIC Shaanxi, EN ISO 9712-2021, Certificate Number: 231103302, Issue Date: Feb 28,2024, Expiration Date: Feb 27,2029, Product Sectors: Welds, Forgings, Castings
- NDT Level 2, Magnetic Particle Testing, Liquid Penetrant Testing from CCIC, EN ISO 9712, Level: 2, Method: MT, PT, Issue Date: Nov 2023
- NDT Level 2, Radiographic Testing from CCIC Shaanxi, EN ISO 9712-2022, Certificate Number: 231103302, Issue Date: Oct 14,2025, Expiration Date: Oct 13,2030, Product Sectors: Welds, Castings
- NDT Level 2, Ultrasonic Testing from CCIC, EN ISO 9712, Level: 2, Method: UT, Issue Date: Feb 2024
- NDT Level 2, Radiographic Testing from CCIC, EN ISO 9712, Level: 2, Method: RT, Issue Date: Oct 2025
- NDT Level 3, Magnetic Particle Testing from CCIC Shaanxi, EN ISO 9712-2021, Certificate Number: 250606403, Issue Date: Jun 11,2025, Expiration Date: Jun 10,2030, Product Sectors: Welds, Forgings, Castings
- NDT Level 3, Ultrasonic Testing from CCIC Shaanxi, EN ISO 9712-2021, Certificate Number: 250606403, Issue Date: Jun 11,2025, Expiration Date: Jun 10,2030, Product Sectors: Welds(Butt welds in plate, Butt welds in pipe), Forgings, Castings
- NDT Level 3, Magnetic Particle Testing, Ultrasonic Testing from CCIC, EN ISO 9712, Level: 3, Method: MT, UT, Issue Date: Jun 2025
- SQS004 Supplier Quality Surveillance Knowledge Validation - Valves from FLUOR UNIVERSITY, Date Completed: Jun 2025
- SQS010 Supplier Quality Surveillance Knowledge Validation - Shell & Tube Heat Exchangers from FLUOR UNIVERSITY, Date Completed: Jun 2025
- SQS006 Supplier Quality Surveillance Knowledge Validation - Pressure Vessels from FLUOR UNIVERSITY, Date Completed: Jun 2025
- SQS007 Supplier Quality Surveillance Knowledge Validation - Shop Fab Piping from FLUOR UNIVERSITY, Date Completed: Jun 2025
Work experience
Jun 2013 – Present
VARIOUS CLIENTS
QA/QC Engineer and Senior Expeditor
- Conducted supplier audits and qualifications.
- Facilitated pre-production meetings and expedited production schedules and fabrication.
- Reviewed inspection plans and assessed equipment/products.
- Reviewed vendor inspection and test plans.
- Witnessed verification testing at vendor premises.
- Prepared detailed inspection reports, including production progress checks, delay cause investigations, and corrective action suggestions.
- Surveyed vendor production capability and quality.
Projects
Sep 2025 – Oct 2025
Lenzing fiber Ltd
Pre-heater, Secondary condenser, tank, vessel fabrication
Wuxi Jinlong Petrochemical & Metallurgical equipment Co., Ltd
- Conducted pre-inspection meeting and material receiving inspection.
- Ensured material traceability and controlled welding consumables.
- Verified qualifications of welders and welding operators.
- Checked and verified calibrated and suitable welding equipment to be applied, supervising WPS being carried out throughout welding process.
- Performed fit-up inspection, visual, and dimensional inspection.
- Established NDT requirements and ensured welds were tested according to project specifications.
- Closely monitored repair welding for cracks to assure proper excavation, preheats, and hold time for NDT.
- Conducted pressure testing, leakage testing, painting, lining, picking, and passivation inspections.
- Reviewed project documents.
Sep 2025 – Sep 2025
BorsodChem VCM 3 Project
EDC Pyrolysis Furnace
Ningbo Liantong Equipment Group Co., Ltd.
- Reviewed Supplier Submittal Documentation.
- Conducted material inspection, fit-up, and welding inspection.
- Performed APQ Test Inspection of Refractory Lining.
- Conducted Dry Out Inspection of Refractory (Visual Dimensional Check & Hammer Test).
- Performed Trial Assembly inspection for convection, stack, radiant, and duct components.
- Conducted visual and dimension inspection, PWHT inspection, and welding inspection.
- Witnessed NDT and hydrostatic testing.
- Performed painting inspection and packing inspection.
- Conducted final inspection for cleaning, nameplates, and marking.
Feb 2025 – Sep 2025
BARAM JUNIOR CLUSTER (BJC) DEVELOPMENTPROJECT
Aluminum anode
Zhejiang Yuxi Corrosion Control Corporation
- Checked PQT.
- Witnessed PPT.
- Checked chemical composition testing.
- Witnessed electrochemical performance testing.
- Inspected weight.
- Witnessed destructive testing.
- Inspected contact resistance.
- Performed pre-assembly inspection.
- Conducted dimension inspection.
- Performed appearance inspection.
- Inspected coating.
- Checked marking and reviewed MRB.
- Conducted packing inspection.
Jan 2025 – Feb 2025
EPC for Strategic Fuel Reserve (SFR) for Musandam
Aluminum anode
Zhejiang Yuxi Corrosion Control Corporation
- Checked PQT.
- Checked chemical composition testing.
- Witnessed electrochemical performance testing.
- Inspected weight.
- Conducted destructive testing inspection.
- Inspected contact resistance.
- Performed pre-assembly inspection.
- Conducted dimension inspection.
- Checked appearance.
- Inspected coating.
- Checked marking and reviewed MRB.
- Conducted packing inspection.
Mar 2024 – Dec 2024
(K524) New Green Diesel Production Plant Hamburg
Convection Coil Fabrication and Convection Modularization & Steel work Prefabrication
Ningbo Liantong Equipment Group Co., Ltd.
- Reviewed Supplier Submittal Documentation.
- Conducted material inspection, fit-up, and welding inspection.
- Performed APQ Test Inspection of Refractory Lining.
- Conducted Dry Out Inspection of Refractory (Visual Dimensional Check & Hammer Test).
- Performed Trial Assembly inspection for convection, stack, radiant, and duct components.
- Conducted visual and dimension inspection, PWHT inspection, welding inspection, NDT inspection, and hydrostatic inspection.
- Performed painting inspection.
- Conducted final inspection for cleaning, nameplates, marking, and packing.
Jan 2024 – Jan 2024
CNCE7/Gas chemical complex
Ethylene Unloading Vessel 153-V-001
Ningbo Mingxin Chemical Machinery Co., Ltd.
- Reviewed WPS/PQR.
- Conducted raw material and machined parts inspection.
- Performed pumping vacuum & perlite sand filling inspection.
- Inspected welding process.
- Witnessed NDE: MT, PT, UT.
- Performed helium leak detection.
- Conducted pressure test of inter layer (Air Tightness Test).
- Expedited product progress.
- Performed sandblasting & painting inspection.
- Conducted final inspection for dimension and surface quality.
Mar 2023 – Dec 2023
THE QASSIM 2 1980MW CCGT INDEPENDENT POWER PROJECT
Steel Structure
Huaye Steel Structure Co., Ltd.
- Reviewed WPS/PQR.
- Conducted raw material and machined parts inspection.
- Reviewed and commented on the ITP and FAT procedure.
- Inspected welding process.
- Witnessed NDE: MT, PT, UT.
- Verified hole opening: orientation, dimension, and grooving.
- Conducted final inspection for dimension and surface quality.
- Expedited product progress.
- Performed painting inspection.
- Conducted final inspection for cleaning, nameplates, marking, and packing.
- Verified NCR Closing.
- Issued Inspection Release Certificate (IRC) and Manufacturer Data Report (MDR).
Jan 2023 – Feb 2023
PJSC Nizhnekamskneftekhim Construction
Pre-cutting Column(1140-C-401), EB / SM Column(1140-C-402), SM Column (1140-C-403)
Ningbo Tianyi Petrochemical Heavy Equipment Manufacturing Co., Ltd
- Reviewed WPS/PQR.
- Conducted raw material and machined parts inspection.
- Reviewed and commented on the ITP and FAT procedure.
- Inspected welding process.
- Witnessed NDE: MT, PT, UT.
- Verified hole opening: orientation, dimension, and grooving.
- Conducted final inspection for dimension and surface quality.
- Expedited product progress.
- Performed painting inspection.
- Conducted final inspection for cleaning, nameplates, marking, and packing.
- Verified NCR Closing.
- Issued Inspection Release Certificate (IRC) and Manufacturer Data Report (MDR).
Aug 2022 – Jan 2023
Suez CNOOC Shenzhen Power Plant Upgrading Project
High-temperature Fan
Ningbo Berkejet Industrial Fan Co., Ltd.
- Reviewed WPS/PQR.
- Conducted raw material and machined parts inspection.
- Performed Impeller Dynamic Balance Performance Test.
- Witnessed NDE: MT, PT.
- Performed Impeller Rotor Assembly Operation Test.
- Conducted final inspection for dimension and surface quality.
- Performed Bearing Housing Penetration Test.
- Conducted High-temperature Fan Assembly Dimension and Appearance Inspection.
- Performed Fan Performance (FAT) Test.
- Conducted final inspection for cleaning, nameplates, marking, painting, and packing.
- Reviewed Manufacturer Data Report (MDR).
Apr 2022 – Aug 2022
Ras Laffan Petrochemicals Project, Qatar
Ground Flare Package 50-PKF-9012
UOP CALLIDUS (UOP)
- Reviewed WPS/PQR.
- Conducted raw material and machined parts inspection.
- Reviewed and commented on the ITP and FAT procedure.
- Inspected welding process.
- Witnessed NDE: PT, RT.
- Verified hole opening: orientation, dimension, and grooving.
- Conducted final inspection for dimension and surface quality.
- Expedited product progress.
- Performed painting inspection.
- Conducted final inspection for cleaning, nameplates, marking, and packing.
- Issued Inspection Release Certificate (IRC).
Jan 2022 – Mar 2022
HCCS
HCCS-L LARGE, TOOL DEPLOYMENT BASKET, HUB SIZE 520
Ningbo Total Quality Fabrications Solutions Co., Ltd.
- Conducted FAT Test.
- Performed final coating condition inspection.
- Conducted marking inspection.
- Performed visual inspection.
- Conducted quantity inspection.
- Reviewed MRB.
Dec 2021 – Dec 2021
NFPS Offshore Compression Complexes Project COMP2
PIPING BOLTS AND NUTS FOR LQ6S & LQ7S
NINGBO ZHONGJIANG HIGH STRENGTH BOLTS CO LTD
- Performed PMI.
- Conducted tensile test for bolts.
- Performed proof load test for nuts and washer.
- Conducted hardness test & impact test.
- Performed visual & dimensional check for bolts, nuts, and washers.
- Conducted coating cure test.
- Performed coating hardness testing.
- Conducted coating adhesion inspection.
- Performed coating thickness inspection.
- Conducted coating color inspection.
- Performed product identification inspection.
- Conducted color coding and marking inspection.
- Performed IRN & packing and marking inspection.
Sep 2021 – Nov 2021
Kingfisher Oil Field Production Facilities Project (EPC Package 3)
Portable dry powder extinguisherPortable CO2 extinguisher
NINGBO ZHENGXIN FIRE FIGHTING EQUIPMENT CO., Ltd.
- Reviewed documents.
- Performed dimensional inspection.
- Conducted appearance inspection.
- Performed painting inspection.
- Conducted identification inspection.
- Performed quantity inspection.
Jul 2021 – Sep 2021
BUPC - Olefin Plant (OL16)
Cracked Gas Decoke Electric Motorized Valves (Furnace)
PALA MACHINE IRANIAN
- Witnessed WPS/PQR Test.
- Conducted raw material and machined parts inspection.
- Reviewed and commented on the ITP and FAT procedure.
- Inspected welding process.
- Witnessed NDE: MT, PT.
- Verified hole opening: orientation, dimension, and grooving.
- Conducted final inspection for dimension and surface quality.
- Expedited product progress.
Jun 2021 – Jul 2021
BALTIC GAS CHEMICAL COMPLEX PROJECT
Vee Valve
ORBINOX VALVES (NINGBO) CO., LTD.
- Witnessed pressure test for body.
- Witnessed seat leak test.
- Performed final dimensional & visual inspection.
- Conducted PMI & marking inspection.
- Performed paint thickness check and adhesion test.
- Conducted final inspection.
- Performed packing inspection.
- Reviewed data record and report.
Feb 2021 – Jun 2021
LPG PLANT RHOURDE EL BAGUEL (ALGERIE)
HOT OIL HEATER AND WASTE HEAT RECOVERY UNIT PREFABRICATION & MODULARIZATION
Ningbo Liantong Equipment Group Co., Ltd.
- Reviewed Supplier Submittal Documentation.
- Conducted material inspection, fit-up, and welding inspection.
- Performed APQ Test Inspection of Refractory Lining.
- Conducted Dry Out Inspection of Refractory (Visual Dimensional Check & Hammer Test).
- Performed Trial Assembly inspection for convection, stack, radiant, and duct components.
- Conducted visual and dimension inspection, PWHT inspection, welding inspection, NDT inspection, and hydrostatic inspection.
- Performed painting inspection.
- Conducted final inspection for cleaning, nameplates, marking, and packing.
- Verified NCR Closing.
- Issued Inspection Release Certificate (IRC) and Manufacturer Data Report (MDR).
Jan 2021 – Jan 2021
HDS REACTOR HEATER
Heating furnace pipe coil
Ningbo Liantong Equipment Group Co., Ltd.
- Reviewed WPS/PQR.
- Conducted material receiving inspection.
- Reviewed and commented on the ITP and FAT procedure.
- Conducted cutting and beveling inspection, verifying cutting/beveling quality.
- Performed forming inspection for head and shell.
- Inspected welding process.
- Witnessed NDE: RT, MT, UT, PT.
- Verified hole opening: orientation, dimension, and grooving.
- Witnessed heat treatment.
- Conducted final inspection for dimension and surface quality.
- Witnessed hydraulic test and cleaning after hydraulic test.
- Performed final visual/dimensional inspection: painting, packing, and shipping.
- Reviewed shop ex-work documents.
Jul 2020 – Dec 2020
GE/MHI
Skids & Pressure pipe/pipe
CIMTAS (Ningbo) Steel Structure Manufacturing Co., Ltd.
- Reviewed WPS/PQR.
- Conducted material receiving inspection.
- Reviewed and commented on the ITP and FAT procedure.
- Conducted cutting and beveling inspection, verifying cutting/beveling quality.
- Performed forming inspection for head and shell.
- Inspected welding process.
- Witnessed NDE: RT, MT, UT, PT.
- Verified hole opening: orientation, dimension, and grooving.
- Witnessed heat treatment.
- Conducted final inspection for dimension and surface quality.
- Witnessed hydraulic test and cleaning after hydraulic test.
- Performed final visual/dimensional inspection: painting, packing, and shipping.
- Reviewed shop ex-work documents.
Feb 2020 – Jul 2020
BASF(Guangdong) Integrated Project PE Cluste
Butterfly valve, skateboard valve
Shanghai Bolong Equipment Technology Co., LTD
- Reviewed punch list.
- Witnessed pressure valve test.
- Conducted function test inspection.
- Performed PMI & marking inspection.
- Performed paint thickness check and adhesion test.
- Conducted visual and dimension inspection.
Sep 2019 – Jan 2020
FPSO P-80 Buzios Project
Umbilical
Ningbo Dongfang Cable Co., Ltd
- Conducted raw material receiving inspection.
- Performed incoming inspection.
- Conducted MTC inspection.
- Performed assembly inspection.
- Conducted NDT inspection.
- Performed final assembly inspection.
- Conducted functional test inspection.
- Performed final inspection.
- Conducted packing inspection.
- Reviewed data record and report.
Jun 2019 – Sep 2019
Ust-Luga Project
Spiral-Wound Gaskets
Ningbo Xinyuan Group Co., Ltd
- Conducted MTC inspection.
- Performed visual and dimension inspection.
- Conducted quantity inspection.
- Performed marking inspection.
- Conducted packing inspection.
- Reviewed data record and report.
Apr 2019 – Jun 2019
SMIP Offsite SMR
Spiral-Wound Gaskets
Burgmann Sealing Materials Co., Ltd. (Cixi)
- Conducted MTC inspection.
- Performed final inspection (visual and dimension).
- Conducted packing inspection.
- Reviewed data record and report.
Mar 2019 – Apr 2019
Missan Oil Field Development Project
Pressure Vessel
VERITAS-MSI (CHINA) CO., LTD
- Reviewed WPS/PQR.
- Conducted material receiving inspection.
- Reviewed and commented on the ITP and FAT procedure.
- Conducted cutting and beveling inspection.
- Performed forming inspection for head and shell.
- Inspected welding process.
- Witnessed NDE: RT, MT, UT, PT.
- Verified hole opening: orientation, dimension, and grooving.
- Witnessed heat treatment.
- Conducted final inspection for dimension and surface quality.
- Witnessed hydraulic test and cleaning after hydraulic test.
- Performed final visual/dimensional inspection: painting, packing, and shipping.
- Reviewed shop ex-work documents.
Jan 2019 – Mar 2019
REALISATION EN EPC D'UNE USINE D'EXTRACTION DE GPL A RHOURDE EL BAGUEL ALGERIE
BOLTING and NUT
Shanghai G&T industry Co., Ltd.
- Witnessed bolt mechanical test & nut proof load test.
- Conducted marking, colour coding, and final stamping inspection.
- Conducted MTC inspection.
- Performed PMI inspection.
- Conducted dimension inspection.
- Performed final inspection.
- Conducted packing inspection.
- Reviewed data record and report.
Sep 2018 – Dec 2018
WAITSIA Gas Project Stage 2
Pressure vessels
Himile Mechanical Manufacturing Co., Ltd
- Held pre-inspection meeting.
- Reviewed/checked QC system of manufacturer, ITP, MPS, specification, raw material certification, personal qualification, calibration certificates, code, and standard.
- Reviewed design complying with ASME standards and reviewed drawings.
- Witnessed NDT and hydrostatic test.
- Conducted pickling and passivation inspection.
- Performed final inspection for dimension and surface quality.
- Performed final visual/dimensional inspection: packing and shipping.
- Reviewed documents.
Jun 2018 – Aug 2018
COPPER & NICKEL SULPHATE EVAPORATION/CRYSTALLIZATION
Pressure vessels
Himile Mechanical Manufacturing Co., Ltd
- Held pre-inspection meeting.
- Reviewed/checked QC system of manufacturer, ITP, MPS, specification, raw material certification, personal qualification, calibration certificates, code, and standard.
- Reviewed design complying with ASME standards and reviewed drawings.
- Witnessed NDT and hydrostatic test.
- Conducted pickling and passivation inspection.
- Performed final inspection for dimension and surface quality.
- Performed final visual/dimensional inspection: packing and shipping.
- Reviewed documents.
Feb 2018 – May 2018
GCC within Ethane-rich Gas Processing Complex
Aluminum plate heat exchanger
Yixing Jiaren Low-temperature Technology Co., Ltd.
- Conducted raw material receiving inspection.
- Performed material cutting inspection.
- Conducted inspection of forming & assembling of shell side.
- Performed inspection of bundle assembling.
- Conducted tube box assembly inspection.
- Performed final assembly inspection.
- Conducted visual & dimension inspection.
- Performed PWHT inspection.
- Conducted NDT inspection.
- Performed pressure test inspection.
- Conducted dew point check.
- Performed nitrogen sealing and pressure gauge check.
- Conducted final inspection for completeness, accessories, etc.
- Performed nameplate and tagging inspection.
- Conducted preservation / packing / marking inspection.
- Reviewed data record and report.
Sep 2017 – Feb 2018
Huizhou Chemical Complex Project
Control valves
Flowserve Fluid Motion and Control (Suzhou) Co., Ltd.
- Conducted raw material receiving inspection.
- Performed incoming inspection.
- Conducted inspection of pre-painting.
- Performed assembly & low-pressure air seal test inspection.
- Conducted final assembly inspection.
- Performed functional test (for valve with actuator).
- Conducted final & packing inspection.
- Reviewed data record and report.
Aug 2017 – Sep 2017
ACC VALLADOLID
Steel structure
Qingdao Tiancheng Energy Equipment Manufacturing Co., Ltd.
- Held pre-inspection meeting.
- Reviewed/checked QC system of manufacturer, ITP, WPS, PQR, raw material certification, personal qualification, calibration certificates, code, and standard.
- Witnessed NDT.
- Performed final inspection for dimension and surface quality.
- Performed final visual/dimensional inspection: packing and shipping.
- Conducted galvanization check.
- Performed marking and hard stamping check.
- Reviewed documents.
May 2017 – Aug 2017
UARU FPSO PROJECT
Pumps
Sulzer Pumps Suzhou Ltd.
- Conducted raw material receiving inspection.
- Performed incoming inspection.
- Conducted inspection of pre-painting.
- Performed assembly & low-pressure air seal test inspection.
- Witnessed hydrostatic test.
- Conducted final assembly inspection.
- Witnessed functional test.
- Performed final inspection.
- Reviewed data record and report.
Mar 2017 – May 2017
National Energy Group Zhoushan Power Plant Phase III 2x660MW expansion project
Valve
VELAN Valve (Suzhou) Co., Ltd
- Conducted raw material receiving inspection.
- Performed incoming inspection.
- Conducted inspection of pre-painting.
- Performed assembly & low-pressure air seal test inspection.
- Conducted hydro test inspection.
- Performed functional test.
- Conducted final & packing inspection.
- Reviewed data record and report.
Jan 2017 – Mar 2017
Screw air compressor project
Screw air compressor
Atlas Copco (Wuxi Compressor Co., Ltd.
- Conducted raw material receiving inspection.
- Performed incoming inspection.
- Conducted inspection of pre-painting.
- Performed assembly inspection.
- Conducted final assembly inspection.
- Performed functional test.
- Reviewed data record and report.
Sep 2016 – Jan 2017
Indonesia hydrogen peroxide H202 Project
Waste heat boiler
Wuxi Petrochemical Equipment Co., Ltd
- Conducted raw material receiving inspection.
- Performed material cutting inspection.
- Conducted inspection of forming & assembling of shell side.
- Performed inspection of bundle assembling.
- Conducted tube box assembly inspection.
- Performed final assembly inspection.
- Conducted visual & dimension inspection.
- Performed PWHT inspection.
- Conducted NDT inspection.
- Performed pressure test inspection.
- Conducted painting check.
- Reviewed data record and report.
Jun 2016 – Sep 2016
Indonesia hydrogen peroxide H202 Project
Air compressor
Zhejiang Kaishan Compressor Co., Ltd
- Conducted raw material receiving inspection.
- Performed impeller dynamic balance test inspection.
- Performed high-speed shaft balance test inspection.
- Conducted inspection of assembling of gear box.
- Performed inspection of host assembly.
- Conducted final assembly inspection.
- Performed visual & dimension inspection.
- Conducted pressure test inspection.
- Performed painting check.
- Conducted unit performance test.
- Reviewed data record and report.
Mar 2016 – Jun 2016
INPEX Ichthys Phase IIA
PACKER and SETTING TRIGGER
Schlumberger
- Witnessed assembling of packer.
- Witnessed assembling of setting trigger.
- Witnessed pressure test / drift test of packer.
- Witnessed pressure test / drift test of setting trigger.
- Performed final inspection and release.
- Reviewed documentation: MTC/NDT/THD Report.
- Conducted shipment preparation inspection.
Sep 2015 – Dec 2015
Deluge valve skid for SZ361 LD5
Deluge valve skid
KinFire Technology (Suzhou) Co., Ltd.
- Performed visual and dimension inspection.
- Witnessed hydrostatic test.
- Witnessed function test.
- Performed final inspection and release.
- Reviewed documentation: MTC/COC/NDT/FAT Report.
Mar 2015 – Jul 2015
Gwangyang Biomass Power Plant 2x100MW CFB boiler
Code Piping
South China Piping Industry Co. Ltd.
- Reviewed Welding Procedure Specification.
- Reviewed Welder Qualification Certification.
- Reviewed NDE Personnel Qualification and Level.
- Reviewed NDE Procedure, Visual Inspection Procedure, PMI Procedure, Bending Procedure, Heat Treatment Procedure, Hot Pointing Procedure, MSDS of paint, Surface Preparation and Painting Procedure, and Packing Procedure.
- Attended PIM Meeting.
- Reviewed MTR.
- Conducted raw material receiving inspection and raw material retest inspection.
- Performed cutting, marking, and transfer inspection.
- Conducted dimension inspection and bending inspection.
- Performed heat treatment PBHT inspection and hardness test inspection.
- Conducted NDE after bending.
- Performed fit-up butt joint of pipe and visual inspection.
- Conducted PWHT inspection and hardness test inspection.
- Performed NDE after heat treatment.
- Conducted dimension inspection and surface preparation inspection.
- Performed coating inspection.
- Verified Cortec VCI-309 powder of each component.
- Conducted final inspection.
- Performed marking, tagging, and packing inspection.
- Issued SFW QA Release for shipment.
Dec 2014 – Mar 2015
ACC Structure Steel and Ducting for NFE Project
Material Inspection certificate type 3.2
Guangdong torch testing co. Ltd.
- Conducted raw material receiving inspection.
- Performed cutting, marking, and transfer inspection.
- Witnessed chemical composition test, tensile test, bend test, Charpy pendulum impact test, flattening test, and Vickers hardness test.
- Issued Type 3.2 certificate by BV company.
Sep 2014 – Nov 2014
Tomato WP Project
Bark Crusher/Screw Reclaimer/Reclaimer-Screw Assembly
Andritz (China) Co. LTD
- Conducted raw material certificate inspection.
- Performed visual inspection.
- Conducted dimension inspection.
- Performed coating inspection.
- Witnessed functional test.
- Reviewed documents.
Jun 2014 – Aug 2014
JURASSIC PRODUCTION FACILITY
CAUSTIC MAKE-UP PUMP/LEAN TEG CIRCULATION PUMP
Benxi Laurel Petroleum Chemical Equipment Co., Ltd.
- Conducted raw material certificate inspection.
- Performed visual inspection.
- Conducted dimension inspection.
- Performed coating inspection.
- Witnessed functional test.
- Reviewed documents.
Jun 2014 – Jun 2014
Panama Gatun CCPP Project
Gearbox and Fan
Seagull Cooling Technologies (Asia Pacific)
- Conducted raw material certificate inspection.
- Performed visual inspection.
- Conducted dimension inspection.
- Performed coating inspection.
- Witnessed mechanical running test.
- Witnessed balance test.
- Reviewed documents: MTC/UT/MT/No-Load Test/Balance test Report.
Jun 2014 – Aug 2014
Pipeline Repair/ Replacement Services in South and East Kuwait Areas
20" Hot Induction Bend
Shanghai Feiting Pipe Manufacture Co., Ltd.
- Conducted pre-inspection meeting.
- Reviewed PO and vendor acknowledgement.
- Reviewed requisition.
- Confirmed vendor documents and drawings.
- Reviewed manufacturer organization.
- Reviewed inspection requirements.
- Reviewed contractors inspection organization.
- Confirmed technical requirements.
- Determined extent of QC activities.
- Established communication channels.
- Managed inspection release.
- Reviewed fabrication schedule.
- Reviewed main sub-orders.
- Managed packing / marking.
- Managed shipment.
- Conducted shop tour.
Apr 2014 – Jun 2014
EPCC of CPF-Gas treatment system and auxiliary system project
CP system materials
Zhejiang Yuxi Corrosion Control Corporation
- Checked pre-packaged high potential magnesium anode.
- Checked MMO linear anode.
- Checked permanent Cu/CuSO4 reference electrode.
- Conducted dimension inspection.
- Performed appearance check.
- Conducted marking check.
- Performed packing inspection.
Jan 2014 – Mar 2014
SO17023 FPSO SEPETIBA
DESANDING HYDROCYCLONE (skid)
Himile Mechanical Manufacturing (Shandong) Co., Ltd
- Reviewed drawings, ITP, WPS & PQR.
- Conducted material inspection including mill certificate review, visual, dimension, and marking check.
- Witnessed PMI test for materials according to client's specification.
- Conducted welding inspection according to WPS and PQR as well as welder qualifications.
- Witnessed NDT test (UT/PT/MT) and reviewed RT films/reports.
- Performed final dimension and visual inspection.
- Checked pickling and passivation.
- Witnessed hydrostatic and pneumatic leak test.
- Conducted E&I installation check.
- Checked sand blasting and painting.
- Reviewed cable inspection report and electrical earthing inspection report.
- Performed final inspection including packing and marking inspection.
- Checked spare parts and loose parts.
- Conducted equipment installation and cable installation and connection check.
- Witnessed pre-electrical test.
- Witnessed FAT.
Sep 2013 – Dec 2013
Petrobras FPSO Cidade de Campos Dos Goytacazes / Project MV29
MBM-1410 Water Collection Skim Vessel, ZBM-1420 A/B Hydro Cyclone, MBM-1430 Induced Gas, Flotation Cell
Himile Mechanical Manufacturing Co., Ltd
- Held pre-inspection meeting.
- Reviewed/checked QC system of manufacturer, ITP, MPS, specification, raw material certification, personal qualification, calibration certificates, code, and standard.
- Reviewed design complying with ASME standards and reviewed drawings.
- Witnessed NDT, hydrostatic test, painting & marking & packing.
- Witnessed heat treatment.
- Conducted pickling and passivation inspection.
- Performed final inspection for dimension and surface quality.
- Witnessed hydraulic test and cleaning after hydraulic test.
- Performed final visual/dimensional inspection: painting, packing, and shipping.
- Reviewed shop ex-work documents.
Languages
Skills
- Quality inspection
- Manufacture controlling
- Supplier audit and qualification
- Pre-production meeting
- Production schedule and fabrication expediting
- Inspection plan review
- Equipment/products review
- Vendor inspection and test plan review
- Verification witness testing
- Detail inspection report
- Production expediting
- Production progress check
- Delay cause investigation
- Corrective action suggestion
- Vendor production capability survey and quality
- Mixing plant
- Centrifugal fans
- Generator shaft
- HRSG
- Steam boiler
- Tube panel
- Pressure vessel
- Air duct
- Water cooled
- Valve group