Summary
Shi Rutong is a QA/QC Engineer and senior expeditor with more than 12 years’ experience in quality inspection and manufacturing control. His experience covers pressure vessels, heat-recovery equipment, steam boilers, tube panels, centrifugal and high-temperature fans, steel structures, piping, valves, pumps, compressors, air ducts, water-cooled equipment, anodes, and offshore equipment. He has managed supplier audits and qualification, pre-production meetings, inspection-plan and vendor ITP reviews, fabrication expediting, witness testing, inspection reporting, production-progress monitoring, delay investigations, and corrective-action recommendations. His project work has included international oil, gas, petrochemical, power, FPSO, and industrial assignments. He is a certified welding inspector and welding engineer with extensive NDT and vendor-inspection experience, and works in English and Chinese.
Education
- Bachelor. Mechanical Engineering and Automation, Ningbo University
Qualifications and Training
- CWI
- EN ISO 9712 UT/MT/PT/RT -II
- EN ISO 9712 UT/MT -III
- IWE
- Training for CWI, AWS, Aug.2016
- Training for International welding engineer, International institute of welding, Sep.2025
- Training for EN ISO 9712 MT, PT level 2, CCIC, Nov.2023
- Training for EN ISO 9712 UT level 2, CCIC, Feb.2024
- Training for EN ISO 9712 RT level 2, CCIC, Oct.2025
- Training for EN ISO 9712 MT, UT level 3, CCIC, June.2025
- QA/QC Engineer and senior expeditor experienced in inspection of mixing plant, centrifugal fans, generator shaft, HRSG, steam boiler, tube panel, pressure vessel, air duct, water cooled, valve group, and etc.
Work Experience
Jun 2013 – Present
TPI AGENCY
QA/QC Engineer and senior expeditor
- Conducted supplier audits and qualification.
- Organized pre-production meetings and monitored production schedules and fabrication expediting.
- Reviewed inspection plans and equipment/product requirements.
- Reviewed vendor inspection and test plans and witnessed testing at vendor premises.
- Prepared detailed inspection reports.
- Checked production progress and investigated causes of delays.
- Suggested corrective actions and prepared detailed reports.
- Surveyed vendor production capability.
Projects
SEP 2025 – OCT 2025
Client: Lenzing fiber Ltd
Vendor: Wuxi Jinlong Petrochemical & Metallurgical equipment Co., Ltd
Product: Pre-heater, Secondary condenser, tank, vessel
Position: Inspector &Expediter
- Conducted the pre-inspection meeting.
- Performed material receiving inspection and material traceability checks.
- Inspected control of welding consumables.
- Verified welder and welding-operator qualifications.
- Performed fit-up inspection and verified suitable calibrated welding equipment.
- Supervised WPS implementation throughout welding.
- Performed visual and dimensional inspection and specified NDT requirements.
- Monitored repair welding for cracks, including excavation, preheats, and NDT hold time.
- Inspected pressure testing, leakage testing, painting, lining, pickling, and passivation.
- Reviewed project documents.
SEP 2025 – SEP 2025
BorsodChem VCM 3 Project
Vendor: Ningbo Liantong Equipment Group Co., Ltd.
Product: EDC Pyrolysis Furnace
Position: Inspector &Expediter
- Reviewed supplier submittal documentation and materials.
- Performed fit-up and welding inspection.
- Inspected APQ testing and dry-out inspection of refractory lining, including visual, dimensional, and hammer testing.
- Inspected trial assembly of convection and stack, radiant, duct, and related components.
- Performed visual and dimensional inspection and PWHT inspection.
- Witnessed welding, NDT, and hydrostatic testing.
- Performed painting, packing, and final inspection, including cleaning, nameplates, and marking.
FEB 2025 – SEP 2025
BARAM JUNIOR CLUSTER (BJC) DEVELOPMENTPROJECT
Vendor: Zhejiang Yuxi Corrosion Control Corporation
Product: Aluminum anode
Position: Inspector
- Checked PQT and witnessed PPT.
- Checked chemical composition and witnessed electrochemical performance testing.
- Performed weight, destructive-testing, and contact-resistance inspection.
- Performed pre-assembly, dimensional, appearance, and coating inspection.
- Checked marking and reviewed the MRB.
- Performed packing inspection.
JAN 2025 – FEB 2025
EPC for Strategic Fuel Reserve (SFR) for Musandam
Vendor: Zhejiang Yuxi Corrosion Control Corporation
Product: Aluminum anode
Position: Inspector
- Checked PQT and chemical composition testing.
- Witnessed electrochemical performance and destructive testing.
- Performed weight, contact-resistance, pre-assembly, dimensional, appearance, and coating inspection.
- Checked marking and reviewed the MRB.
- Performed packing inspection.
MAR 2024 – DEC 2024
(K524) New Green Diesel Production Plant Hamburg
Vendor: Ningbo Liantong Equipment Group Co., Ltd.
Product: Convection Coil Fabrication and Convection Modularization & Steel work Prefabrication
Position: Inspector & Expediter
- Reviewed supplier submittal documentation and materials.
- Performed fit-up and welding inspection.
- Inspected APQ testing and dry-out inspection of refractory lining, including visual, dimensional, and hammer testing.
- Inspected trial assembly of convection and stack, radiant, duct, and related components.
- Performed visual, dimensional, PWHT, welding, NDT, hydrostatic, and painting inspection.
- Performed final inspection of cleaning, nameplates, marking, and packing.
JAN 2024 – JAN 2024
CNCE7/Gas chemical complex
Vendor: Ningbo Mingxin Chemical Machinery Co., Ltd.
Product: Ethylene Unloading Vessel 153-V-001
Position: Inspector & Expediter
- Reviewed WPS/PQR and inspected raw materials and machined parts.
- Inspected vacuum pumping and perlite sand filling.
- Inspected the welding process and witnessed MT, PT, and UT NDE.
- Witnessed helium leak detection and interlayer air-tightness pressure testing.
- Expedited product progress.
- Inspected sandblasting and painting.
- Performed final dimensional and surface-quality inspection.
- Verified NCR closure and reviewed the IRC and MDR.
MAR 2023 – DEC 2023
THE QASSIM 2 1980MW CCGT INDEPENDENT POWER PROJECT
Vendor: Huaye Steel Structure Co., Ltd.
Product: Steel Structure
Position: Inspector & Expediter
- Reviewed WPS/PQR, raw materials, machined parts, ITP, and FAT procedure.
- Inspected the welding process and witnessed MT, PT, and UT NDE.
- Verified hole-opening orientation, dimensions, and grooving.
- Performed dimensional, surface-quality, painting, cleaning, nameplate, marking, and packing inspection.
- Expedited product progress.
- Verified NCR closure and reviewed the IRC and MDR.
JAN 2023 – FEB 2023
PJSC Nizhnekamskneftekhim Construction
Vendor: Ningbo Tianyi Petrochemical Heavy Equipment Manufacturing Co., Ltd
Product: Pre-cutting Column(1140-C-401), EB / SM Column(1140-C-402), SM Column(1140-C-403)
Position: Inspector &Expediter
- Reviewed WPS/PQR, raw materials, machined parts, ITP, and FAT procedure.
- Inspected welding and witnessed MT, PT, and UT NDE.
- Verified hole-opening orientation, dimensions, and grooving.
- Performed dimensional, surface-quality, painting, cleaning, nameplate, marking, and packing inspection.
- Expedited product progress.
- Verified NCR closure and reviewed the IRC and MDR.
AUG 2022 – JAN 2023
Suez CNOOC Shenzhen Power Plant Upgrading Project
Vendor: Ningbo Berkejet Industrial Fan Co., Ltd.
Product: High-temperature Fan
Position: Inspector
- Reviewed WPS/PQR and inspected raw materials and machined parts.
- Witnessed impeller dynamic-balance testing and impeller rotor assembly operation testing.
- Witnessed MT and PT NDE.
- Performed final dimensional and surface-quality inspection.
- Inspected bearing-housing penetration testing and high-temperature fan assembly dimensions and appearance.
- Witnessed the fan performance FAT.
- Performed final cleaning, nameplate, marking, painting, and packing inspection.
- Reviewed the MDR.
APR 2022 – AUG 2022
Ras Laffan Petrochemicals Project, Qatar
Vendor: UOP CALLIDUS (UOP)
Product: Ground Flare Package 50-PKF-9012
Position: Inspector& Expedite
- Reviewed WPS/PQR, raw materials, machined parts, ITP, and FAT procedure.
- Inspected welding and witnessed PT and RT NDE.
- Verified hole-opening orientation, dimensions, and grooving.
- Performed dimensional, surface-quality, painting, cleaning, nameplate, marking, and packing inspection.
- Expedited product progress.
- Reviewed the IRC.
JAN 2022 – MAR 2022
HCCS
Vendor: Ningbo Total Quality Fabrications Solutions Co., Ltd.
Product: HCCS-L LARGE, TOOL DEPLOYMENT BASKET, HUB SIZE 520
Position: Inspector
- Witnessed the FAT.
- Inspected final coating condition, marking, visual condition, and quantity.
- Reviewed the MRB.
DEC 2021 – DEC 2021
NFPS Offshore Compression Complexes Project COMP2
Vendor: NINGBO ZHONGJIANG HIGH STRENGTH BOLTS CO LTD
Product: PIPING BOLTS AND NUTS FOR LQ6S & LQ7S
Position: Inspector
- Performed PMI and tensile testing of bolts.
- Performed proof-load testing of nuts and washers.
- Performed hardness and impact testing.
- Performed visual and dimensional checks of bolts, nuts, and washers.
- Inspected coating cure, hardness, adhesion, thickness, and color.
- Inspected product identification, color coding, marking, IRN, packing, and marking.
SEP 2021 – NOV 2021
Kingfisher Oil Field Production Facilities Project (EPC Package 3)
Vendor: NINGBO ZHENGXIN FIRE FIGHTING EQUIPMENT CO., Ltd.
Product: Portable dry powder extinguisher、Portable CO2 extinguisher
Position: Inspector
- Reviewed documents.
- Performed dimensional, appearance, painting, identification, and quantity inspection.
JUL 2021 – SEP 2021
BUPC – Olefin Plant (OL16)
Vendor: PALA MACHINE IRANIAN
Product: Cracked Gas Decoke Electric Motorized Valves (Furnace)
Position: Inspector & Expediter
- Witnessed WPS/PQR testing and inspected raw materials and machined parts.
- Reviewed and commented on the ITP and FAT procedure.
- Inspected welding and witnessed MT and PT NDE.
- Verified hole-opening orientation, dimensions, and grooving.
- Performed dimensional, surface-quality, and painting inspection.
- Expedited product progress.
JUN 2021 – JUL 2021
BALTIC GAS CHEMICAL COMPLEX PROJECT
Vendor: ORBINOX VALVES (NINGBO) CO., LTD.
Product: Vee Valve
Position: Inspector
- Witnessed body pressure and seat-leak testing.
- Performed final dimensional and visual inspection.
- Performed PMI and marking inspection.
- Checked paint thickness and adhesion.
- Performed final and packing inspection.
- Reviewed data records and reports.
FEB 2021 – JUN 2021
LPG PLANT RHOURDE EL BAGUEL (ALGERIE)
Vendor: Ningbo Liantong Equipment Group Co., Ltd.
Product: HOT OIL HEATER AND WASTE HEAT RECOVERY UNIT PREFABRICATION & MODULARIZATION
Position: Inspector
- Reviewed supplier submittal documentation and materials.
- Performed fit-up and welding inspection.
- Inspected APQ testing and dry-out inspection of refractory lining, including visual, dimensional, and hammer testing.
- Inspected trial assembly of convection and stack, radiant, duct, and related components.
- Performed visual, dimensional, PWHT, welding, NDT, hydrostatic, and painting inspection.
- Performed final cleaning, nameplate, marking, and packing inspection.
- Verified NCR closure and reviewed the IRC and MDR.
JAN 2021 – JAN 2021
HDS REACTOR HEATER
Vendor: Ningbo Liantong Equipment Group Co., Ltd.
Product: Heating furnace pipe coil
Position: Inspector
- Reviewed WPS/PQR, raw materials, ITP, and FAT procedure.
- Inspected cutting, beveling, forming of heads and shells, and welding.
- Witnessed RT, MT, UT, and PT NDE and heat treatment.
- Verified hole-opening orientation, dimensions, and grooving.
- Witnessed hydraulic testing and cleaning after testing.
- Performed final dimensional, surface, painting, packing, and shipping inspection.
- Reviewed shop ex-work documents.
JUL 2020 – DEC 2020
GE/MHI
Vendor: CIMTAS (Ningbo) Steel Structure Manufacturing Co., Ltd.
Product: Skids& Pressure pipe/pipe
Position: Inspector
- Reviewed WPS/PQR, materials, ITP, and FAT procedure.
- Inspected cutting, beveling, forming of heads and shells, and welding.
- Witnessed RT, MT, UT, and PT NDE and heat treatment.
- Verified hole-opening orientation, dimensions, and grooving.
- Witnessed hydraulic testing and cleaning after testing.
- Performed final dimensional, surface, painting, packing, and shipping inspection.
- Reviewed shop ex-work documents.
FEB 2020 – JUL 2020
BASF(Guangdong)Integrated Project PE Cluste
Vendor: Shanghai Bolong Equipment Technology Co., LTD
Product: Butterfly valve, skateboard valve
Position: Inspector
- Reviewed punch lists.
- Witnessed valve pressure testing and inspected function testing.
- Performed PMI and marking inspection.
- Checked paint thickness and adhesion.
- Performed visual, dimensional, final, and packing inspection.
- Reviewed data records and reports.
SEP 2019 – JAN 2020
FPSO P-80 Buzios Project
Vendor: Ningbo Dongfang Cable Co., Ltd
Product: Umbilical
Position: Inspector
- Inspected raw-material receipt, incoming materials, and MTCs.
- Performed assembly and NDT inspection.
- Performed final assembly, functional-test, final, and packing inspection.
- Reviewed data records and reports.
JUN 2019 – SEP 2019
Ust-Luga Project
Vendor: Ningbo Xinyuan Group Co., Ltd
Product: Spiral-Wound Gaskets
Position: Inspector
- Inspected MTCs, visual and dimensions, quantities, marking, and packing.
- Reviewed data records and reports.
APR 2019 – JUN 2019
SMIP Offsite SMR
Vendor: Burgmann Sealing Materials Co., Ltd. (Cixi)
Product: Spiral-Wound Gaskets
Position: Inspector
- Inspected MTCs, final visual and dimensional condition, and packing.
- Reviewed data records and reports.
MAR 2019 – APR 2019
Missan Oil Field Development Project
Vendor: VERITAS-MSI (CHINA) CO., LTD
Product: Pressure Vessel
Position: Inspection Engineer
- Reviewed WPS/PQR, materials, ITP, and FAT procedure.
- Inspected cutting, beveling, forming of heads and shells, and welding.
- Witnessed RT, MT, UT, and PT NDE and heat treatment.
- Verified hole-opening orientation, dimensions, and grooving.
- Witnessed hydraulic testing and cleaning after testing.
- Performed final dimensional, surface, painting, packing, and shipping inspection.
- Reviewed shop ex-work documents.
JAN 2019 – MAR 2019
REALISATION EN EPC D’UNE USINE D’EXTRACTION DE GPL A RHOURDE EL BAGUEL ALGERIE
Vendor: Shanghai G&T industry Co., Ltd.
Product: BOLTING and NUT
Position: Inspector
- Witnessed bolt mechanical testing and nut proof-load testing.
- Inspected marking, color coding, final stamping, MTCs, PMI, dimensions, final condition, and packing.
- Reviewed data records and reports.
SEP 2018 – DEC 2018
WAITSIA Gas Project Stage 2
Vendor: Himile Mechanical Manufacturing Co., Ltd
Product: Pressure vessels
Position: Inspector
- Held the pre-inspection meeting and reviewed the manufacturer QC system, ITP, MPS, specification, material certificates, personnel qualifications, calibration certificates, codes, and standards.
- Reviewed design compliance with ASME standards and drawings.
- Witnessed NDT and hydrostatic testing.
- Inspected pickling and passivation.
- Performed final dimensional, surface, packing, and shipping inspection.
- Reviewed documents.
JUN 2018 – AUG 2018
COPPER & NICKEL SULPHATE EVAPORATION/CRYSTALLIZATION
Vendor: Himile Mechanical Manufacturing Co., Ltd
Product: Pressure vessels
Position: Inspector
- Held the pre-inspection meeting and reviewed the manufacturer QC system, ITP, MPS, specification, material certificates, personnel qualifications, calibration certificates, codes, and standards.
- Reviewed design compliance with ASME standards and drawings.
- Witnessed NDT and hydrostatic testing.
- Inspected pickling and passivation.
- Performed final dimensional, surface, packing, and shipping inspection.
- Reviewed documents.
FEB 2018 – MAY 2018
GCC within Ethane-rich Gas Processing Complex
Vendor: Yixing Jiaren Low-temperature Technology Co., Ltd.
Product: Aluminum plate heat exchanger
Position: Inspector
- Inspected raw materials, cutting, shell-side forming and assembly, bundle assembly, and tube-box assembly.
- Performed final assembly, visual, dimensional, PWHT, NDT, and pressure-test inspection.
- Checked dew point, nitrogen sealing, and pressure gauges.
- Performed final completeness, accessories, nameplate, tagging, preservation, packing, and marking inspection.
- Reviewed data records and reports.
SEP 2017 – FEB 2018
Huizhou Chemical Complex Project
Vendor: Flowserve Fluid Motion and Control (Suzhou) Co., Ltd.
Product: Control valves
Position: Inspector
- Inspected raw materials, incoming materials, and pre-painting.
- Inspected assembly and low-pressure air-seal testing.
- Inspected final assembly and functional testing of valves with actuators.
- Performed final and packing inspection.
- Reviewed data records and reports.
AUG 2017 – SEP 2017
ACC VALLADOLID
Vendor: Qingdao Tiancheng Energy Equipment Manufacturing Co., Ltd.
Product: Steel structure
Position: Inspector
- Held the pre-inspection meeting and reviewed the manufacturer QC system, ITP, WPS, PQR, material certificates, personnel qualifications, calibration certificates, codes, and standards.
- Witnessed NDT and performed final dimensional and surface-quality inspection.
- Performed packing, shipping, galvanization, marking, and hard-stamping inspection.
- Reviewed documents.
MAY 2017 – AUG 2017
UARU FPSO PROJECT
Vendor: Sulzer Pumps Suzhou Ltd.
Product: Pumps
Position: Inspector
- Inspected raw materials, incoming materials, and pre-painting.
- Inspected assembly and low-pressure air-seal testing.
- Witnessed hydrostatic and functional testing.
- Performed final assembly and final inspection.
- Reviewed data records and reports.
MAR 2017 – MAY 2017
National Energy Group Zhoushan Power Plant Phase III 2x660MW expansion project
Vendor: VELAN Valve (Suzhou) Co., Ltd
Product: Valve
Position: Inspector
- Inspected raw materials, incoming materials, and pre-painting.
- Inspected assembly and low-pressure air-seal testing.
- Inspected hydro testing and functional testing.
- Performed final and packing inspection.
- Reviewed data records and reports.
JAN 2017 – MAR 2017
Screw air compressor project
Vendor: Atlas Copco (Wuxi Compressor Co., Ltd.
Product: Screw air compressor
Position: Inspector
- Inspected raw materials, incoming materials, pre-painting, assembly, and final assembly.
- Witnessed functional testing.
- Reviewed data records and reports.
SEP 2016 – JAN 2017
Indonesia hydrogen peroxide H202 Project
Vendor: Wuxi Petrochemical Equipment Co., Ltd
Product: Waster heat boiler
Position: Inspector
- Inspected raw materials, cutting, shell-side forming and assembly, bundle assembly, and tube-box assembly.
- Performed final assembly, visual, dimensional, PWHT, NDT, pressure-test, and painting inspection.
- Reviewed data records and reports.
JUN 2016 – SEP 2016
Indonesia hydrogen peroxide H202 Project
Vendor: Zhejiang Kaishan Compressor Co., Ltd
Product: Air compressor
Position: Inspector
- Inspected raw materials and impeller dynamic-balance and high-speed-shaft balance testing.
- Inspected gearbox and host assembly and final assembly.
- Performed visual, dimensional, pressure-test, painting, and unit-performance inspection.
- Reviewed data records and reports.
MAR 2016 – JUN 2016
INPEX Ichthys Phase IIA
Vendor: Schlumberger
Product: PACKER and SETTING TRIGGER
Position: Inspector
- Witnessed packer and setting-trigger assembly.
- Witnessed pressure and drift testing of the packer and setting trigger.
- Performed final inspection and release.
- Reviewed MTC, NDT, and THD reports.
- Performed shipment-preparation inspection.
SEP 2015 – DEC 2015
Deluge valve skid for SZ361 LD5
Vendor: KinFire Technology (Suzhou) Co., Ltd.
Product: Deluge valve skid
Position: Inspector
- Performed visual and dimensional inspection.
- Witnessed hydrostatic and functional testing.
- Performed final inspection and release.
- Reviewed MTC, COC, NDT, and FAT reports.
MAR 2015 – JUL 2015
Gwangyang Biomass Power Plant 2x100MW CFB boiler
Vendor: South China Piping Industry Co. Ltd.
Product: Code Piping
Position: Inspector
- Reviewed welding, welder, NDE, visual-inspection, PMI, bending, heat-treatment, hot-pointing, paint, surface-preparation, packing, and related procedures.
- Reviewed MTRs and attended the PIM meeting.
- Inspected raw materials, retesting, cutting, marking, transfer, dimensions, bending, PBHT, hardness, fit-up, and visual condition.
- Performed NDE after bending and heat treatment and PWHT inspection.
- Inspected surface preparation, coating, Cortec VCI-309 powder, final condition, marking, tagging, and packing.
- Completed SFW QA release for shipment.
DEC 2014 – MAR 2015
ACC Structure Steel and Ducting for NFE Project
Vendor: Guangdong torch testing co. Ltd.
Product: Material Inspection certificate type 3.2
Position: Inspector
- Inspected raw materials, cutting, marking, and transfer.
- Witnessed chemical-composition, tensile, bend, Charpy pendulum impact, flattening, and Vickers hardness testing.
- Issued Type 3.2 certificate through BV company.
SEP 2014 – NOV 2014
Tomato WP Project
Vendor: Andritz (China) Co. LTD
Product: Bark Crusher/Screw Reclaimer/Reclaimer-Screw Assembly
Position: Inspector
- Inspected raw-material certificates, visual condition, dimensions, and coating.
- Witnessed functional testing.
- Reviewed documents.
JUN 2014 – AUG 2014
JURASSIC PRODUCTION FACILITY
Vendor: Benxi Laurel Petroleum Chemical Equipment Co., Ltd.
Product: CAUSTIC MAKE-UP PUMP/LEAN TEG CIRCULATION PUMP
Position: Inspector
- Inspected raw-material certificates, visual condition, dimensions, and coating.
- Witnessed functional testing.
- Reviewed documents.
JUN 2014 – JUN 2014
Panama Gatun CCPP Project
Vendor: Seagull Cooling Technologies (Asia Pacific)
Product: Gearbox and Fan
Position: Inspector
- Inspected raw-material certificates, visual condition, dimensions, and coating.
- Witnessed mechanical running and balance testing.
- Reviewed MTC, UT, MT, no-load, and balance-test reports.
JUN 2014 – AUG 2014
Pipeline Repair/ Replacement Services in South and East Kuwait Areas
Vendor: Shanghai Feiting Pipe Manufacture Co., Ltd.
Product: 20” Hot Induction Bend
Position: Inspection Engineer
- Held the pre-inspection meeting and reviewed the purchase order, vendor acknowledgement, requisition, vendor documents, drawings, manufacturer organization, inspection requirements, contractor inspection organization, technical requirements, QC activities, communication channels, inspection release, fabrication schedule, sub-orders, packing, marking, and shipment.
- Conducted a shop tour.
APR 2014 – JUN 2014
EPCC of CPF-Gas treatment system and auxiliary system project
Vendor: Zhejiang Yuxi Corrosion Control Corporation
Product: CP system materials
Position: Inspector
- Checked pre-packaged high-potential magnesium anodes, MMO linear anodes, and permanent Cu/CuSO4 reference electrodes.
- Performed dimensional, appearance, marking, and packing inspection.
JAN 2014 – MAR 2014
SO17023 FPSO SEPETIBA
Vendor: Himile Mechanical Manufacturing (Shandong) Co., Ltd
Product: DESANDING HYDROCYCLONE (skid)
Position: Inspection Engineer
- Reviewed drawings, ITP, WPS, and PQR.
- Inspected materials, mill certificates, visual condition, dimensions, and marking.
- Witnessed PMI, welding, UT/PT/MT NDT, and reviewed RT films and reports.
- Performed final dimensional and visual inspection and checked pickling, passivation, sandblasting, and painting.
- Witnessed hydrostatic, pneumatic leak, pre-electrical, and FAT testing.
- Checked E&I installation, cable and electrical-earthing reports, spare and loose parts, equipment and cable installation, and connections.
- Performed final packing and marking inspection.
SEP 2013 – DEC 2013
Petrobras FPSO Cidade de Campos Dos Goytacazes / Project MV29
Vendor: Himile Mechanical Manufacturing Co., Ltd
Product: MBM-1410 Water Collection Skim Vessel, ZBM-1420 A/B Hydro Cyclone, MBM-1430 Induced Gas, Flotation Cell
Position: Inspector
- Held the pre-inspection meeting and reviewed the manufacturer QC system, ITP, MPS, specification, material certificates, personnel qualifications, calibration certificates, codes, and standards.
- Reviewed design compliance with ASME standards and drawings.
- Witnessed NDT, hydrostatic testing, heat treatment, painting, marking, and packing.
- Inspected pickling and passivation.
- Performed final dimensional, surface, hydraulic-test, cleaning, packing, and shipping inspection.
- Reviewed shop ex-work documents.
Languages
Skills
- QA/QC Engineering
- Third-Party Inspection
- Vendor Inspection
- Fabrication Expediting
- Supplier Audit and Qualification
- Inspection Plan and ITP Review
- Welding Inspection
- NDT Inspection
- Pressure Vessel Inspection
- Mechanical Equipment Inspection
- Steel Structure Inspection
- Valve and Piping Inspection
- Quality Documentation Review
- Production Progress Monitoring
- NCR and Corrective Action Follow-up
Commodities
- Mixing Plants
- Centrifugal Fans
- Generator Shafts
- HRSGs
- Steam Boilers
- Tube Panels
- Pressure Vessels
- Air Ducts
- Water-Cooled Equipment
- Valve Groups
- Heat Exchangers
- Steel Structures
- Piping
- Valves
- Pumps
- Compressors
- Flares
- Anodes
- Refractory Linings
- Bolts and Nuts
- Fire Extinguishers
- Umbilicals
- Gaskets
- Cable Equipment
- Offshore Equipment