Fulkrum — Standardized CV (PoC)

Abouzar Zaer

Summary

Abouzar Zaer is an experienced mechanical engineer specializing in Non-Destructive Testing, weld inspection, mechanical testing, and quality control. He has a strong background in quality assurance, maintenance, offshore operations, lifting and rigging inspections, and process and safety improvements. His expertise includes applying NDT techniques to detect defects, improve weld quality, and assess structural integrity, alongside inspection of mechanical, piping, structural, painting, and electrical equipment. He has managed QC teams and welding workforces on aluminum-plant, refinery, petrochemical, and structural-steel projects, and has prepared WPS, WPQR, ITPs, NDT procedures, inspection reports, and quality dossiers. He also brings expediting, vendor coordination, documentation management, and deadline-focused project support experience.

projects: table row differs from source — check column alignment: | General - Instrumentation | ☒ | Flanges & Fittings | Stainless Steel | Columns
projects: table row differs from source — check column alignment: | Motors | ☐ | Fire and Gas Detection | ☒ | API Tubular | SPS Equipment | Blow O
projects: table row differs from source — check column alignment: | Electrical Panels | ☐ | Transmitters | ☐ | Jacket Fabrication | Umbilicals | O
projects: table row differs from source — check column alignment: | Electrical Cables / Junction Boxes | ☒ | Field Instruments | FFP Audits | ☐ |
projects: table row differs from source — check column alignment: | UPS / Battery Chargers | ☐ | Pressure Gauges | Completion Equipment | Crane In
projects: table row differs from source — check column alignment: | McDermott Middle East – ADNOC Offshore Project | Celeros Flow Technology; Sub-
projects: table row differs from source — check column alignment: | MAPA Construction / Juranah Water Reservoir Company (JWRC) | Scotmas Group Ltd
projects: table row differs from source — check column alignment: | ADNOC Offshore / McDermott Middle East Inc. | Online Electronics Ltd / Gorilla
projects: table row differs from source — check column alignment: | Kanadevia Inova ( HZI) | Forbes Technologies Ltd | 3 off 100m³ Fully Demineral
projects: table row differs from source — check column alignment: | COOEC / PIC Project | Solartron ISA / DNV | Wet Gas Flowmeters | Witnessed dry
projects: table row differs from source — check column alignment: | NPCC-SAIPEM JV | Washington Components Ltd E Blast, eGroup Ltd Aberdeen | Subs
projects: table row differs from source — check column alignment: | McDermott (MDR) | Metec SARL -UK Averon Engineering Aberdeen – Scotland | ROV-
projects: table row differs from source — check column alignment: | ADNOC Gas | Howden CO Glasgow | HYDROCARBON FLARE GAS RECOVERY COMPRESSORS | F
projects: table row differs from source — check column alignment: | Petrobras | Techflow Marine | Offloading System - UCP PN-UH-(FWD) & PN-UH-(AFT
projects: table row differs from source — check column alignment: | McDermott | FTV Proclad International Limited – Scotland | Connector Subsea So
projects: table row differs from source — check column alignment: | NMDC | EXHEAT Ltd, Watton, Norfolk, UK | Electrical Process Heater Package, Tu
projects: table row differs from source — check column alignment: | INDIAN OIL CORPORATION LIMITED | Howden Compressors Glasgow | DRIVE TRAIN FOR
projects: table row differs from source — check column alignment: | Kuwait Energy | KROHNE Ltd | Coriolis Flow Meters | Performed FAT including hy
projects: table row differs from source — check column alignment: | Shell Crux | JDR Cables | Subsea umbilical | Inspected electric cables, fibre-
projects: table row differs from source — check column alignment: | L&T HYDROCARBON ENGINEERING LIMITED -ABU DHABI | ITT Bornemann company | Multi
projects: table row differs from source — check column alignment: | pt pln (persero) Indonesia | Rolls-Royce Bergen Engines AS | Stationary engine
projects: table row differs from source — check column alignment: | ARAMCO | IPP ACCURA Ltd ARAMCO Project | DuplexFittings inspections, (Elbow,Te
projects: table row differs from source — check column alignment: | Groupement Berkine (Algeria Oil & Energy) | Curtisswright Company | Safety val
projects: table row differs from source — check column alignment: | Shell | FLEXIBLE ENGINEERED SOLUTIONS | Riser DBSC clamp and Umbilical DBSC cl
projects: table row differs from source — check column alignment: | Total Energies - SINOPEC | Rossendale Group | Motor Lifting Frame | Reviewed m
projects: table row differs from source — check column alignment: | ADNOC OFFSHORE | Celeros Flow Technology (GD Engineering) | 18” to 28” Bandloc
projects: table row differs from source — check column alignment: | Siemens Energy | JDR CABLE Ltd | Umbilical Fiber Optic cable | Performed OTDR,
projects: table row differs from source — check column alignment: | Qatar Gas | ROTORK CONTROLS LTD | Hydraulic Actuator (Manual Ball Valves and A
projects: table row differs from source — check column alignment: | Shell | FLEXIBLE ENGINEERED SOLUTIONS LTD | Riser DBSC clamp and Umbilical DBS
projects: table row differs from source — check column alignment: | Special Piping Materials Limited | PIPE, ELBOW, FLANGE WELLDNECK | | Inspectio
projects: only 56 table rows extracted but the source's largest table has ~86 rows — possible truncation, review required

Education

Qualifications and Training

Work Experience

– Present FREELANCE (Various clients)
⚠ Review: start date missing or unclear
Jan 2023 – Apr 2023 McLaren Automotive
Skilled Inspector
2016 – 2018 NDTS - Vista Faraz Bam / NFC (China Nonferrous Metal Industry’s Foreign Engineering & Construction Co., Ltd)
QC Engineer
2009 – 2016 Payandan
Steel Structure Quality Control Manager
⚠ Review: dates overlap with Parsian Gas Refinery
2013 – 2016 Parsian Gas Refinery
Night Shift Technical Manager
⚠ Review: dates overlap with Payandan
2007 – 2009 Azmoon Rad Parsian Co. (Payandan)
Welding and NDT Technician
2006 – 2007 Behine Azma Iranian Co. (Payandan)
Welding Inspector

Projects

DisciplineMaterial FormsMaterial TypesPressure EquipmentRotating EquipmentLifting Equipment
General MechanicalPlatesCarbon SteelPressure VesselsPumpsEOT Cranes
General - ElectricalPipesLTCS / CS NACEHeat ExchangersCompressorsPedestal Cranes
General - InstrumentationFlanges & FittingsStainless SteelColumns / ReactorsTurbinesHoists / Slings / Winches
Painting / CoatingCastingsHigh Alloy SteelBoilersCentrifugal FansLifts/ Elevators
WeldingForgings / FlangesNickel Alloy / InconelProcess Control / Safety ValvesDiesel EnginesLifting Loose Gears
NDTFabricated ItemsDuplex / Super Duplex SteelAir Cooled Heat ExchangersGearsLifting Cables
ExpeditingWind Turbein MonopilesAluminum / Titanium AlloysLine Pipes – RigidReciprocatin g EquipmentChain Pulley Blocks
Supplier Technical AssessmentWind Turbein jacketNon Metallic MaterialsStorage TanksHigh Precision MachiningSensor and accessories
Electrical EquipmentInstrumentation EquipmentOffshore PlatformsSubsea EquipmentDrilling & Wellhead EquipmentSite Construction / Installation
GeneratorsCommunicati on SystemsOffshore Structure FabricationSubsea Structures / TemplatesOil Country Tubular GoodsOffshore Platforms
MotorsFire and Gas DetectionAPI TubularSPS EquipmentBlow Out Preventers
TransformersMetering EquipmentTKY JointsSubsea ValvesWellhead PumpsCross Country Pipelines
Switchgears / Circuit BreakersControl PanelsEquipment InstallationFlexible Pipes & RisersOnshore Drilling RigsPiping Installation
Electrical PanelsTransmittersJacket FabricationUmbilicalsOffshore Drilling RigsStorage Tanks
Electrical Cables / Junction BoxesField InstrumentsFFP AuditsTopside FabricationOther subsea equipmentOther Wellhead Equipment
UPS / Battery ChargersPressure GaugesCompletion EquipmentCrane Installation
ClientSupplierEquipmentActivities
ADNOC OffshoreCeleros Flow Technology, Glasgow, UKWater Injection Main Pump PackageWitnessed Factory Acceptance Testing comprising pump performance testing, NPSH verification using the 3% head-drop method, and a four-hour Mechanical Run Test in accordance with the approved ITP and FAT procedure. Verified test setup, calibrated instrumentation and operating conditions. Monitored and reviewed flow rate, suction and discharge pressures, pump speed, motor current, voltage, power consumption, casing vibration, bearing temperatures and lubrication-oil temperatures. Confirmed operational stability across maximum, rated and reduced-flow conditions, with no abnormal vibration, noise, temperature rise, instability or interruption observed. Reviewed recorded test data, applicable drawings, calibration certificates and supporting quality documentation for compliance with ADNOC Offshore/NMDC project requirements.
Wood GroupScore Australasia / Davidsons Blast Services Ltd Aberdeen – ScotlandActuated Valve AssembliesWitnessed surface preparation and coating inspection activities including verification of surface cleanliness to ISO 8501-1 Sa 2.5, blast profile measurement using Testex replica tape, surface chloride contamination testing (Bresle method), environmental condition checks, abrasive conductivity testing, final coating visual inspection and DFT verification in accordance with ISO 19840 and ISO 12944. Review of coating documentation, calibration certificates and preservation readiness assessment.
ADNOC Offshore / McDermott Middle EastPietro Fiorentini / TÜV SÜD National Engineering Laboratory (NEL), East Kilbride, UKMultiphase Flow Meters (MPFM)Witnessed Dynamic Flow Loop Performance Testing (FAT) of Multiphase Flow Meters (MPFM). Verified execution of approved FAT and performance test procedures, reviewed calibration certificates, instrumentation records and quality documentation. Witnessed live flow testing using oil, water and gas mixtures under simulated operating conditions. Verified meter performance, repeatability, uncertainty acceptance criteria, data acquisition functionality and compliance with project specifications, ITP requirements and ADNOC Offshore / McDermott quality requirements.
Acciona Agua / Samsung C&T – Qatar Facility E IWPPBray Controls Glasgow - ScotlandManual and Motor Operated Butterfly Valves (8” to 28”)Witnessed FAT, hydrostatic shell and seat pressure testing, operational/open-close functional testing, dimensional verification, visual inspection and documentation review activities for butterfly valve assemblies in accordance with approved ITP, FAT procedures, datasheets and project specifications. Verified valve identification, orientation, nameplates, coating condition, gearbox installation, assembly workmanship and preservation requirements. Reviewed certification packages including 3.1 material certificates, PED certification, gearbox documentation and calibration records. Raised technical comments related to documentation inconsistencies, coating damage observations, calibration certification validity and traceability records.
McDermott Middle East – ADNOC Offshore ProjectCeleros Flow Technology; Sub-supplier: Denholm Wellclad Ltd, Glasgow, UKHorizontal Bandlock 2 Closures, ASME Class 1500 – Hubs and Doors with Alloy 625 Weld OverlayWitnessed in-process inspection and NDT of Alloy 625 weld-overlay areas in accordance with the approved ITP and NDE procedures. Verified identification and traceability of hubs, doors and ERNiCrMo-3 weld consumables against EN 10204 Type 3.1 MTCs, heat numbers and route cards. Witnessed PMI of Alloy 625 weld consumables and deposited weld metal using a calibrated XRF analyser. Reviewed WPS, PQR, welder qualifications, NDT personnel certification, consumable certificates and calibration records. Conducted visual/workmanship inspection of the Production Test Coupon and completed hub/door weld-overlay surfaces. Witnessed 10% first-layer DPI and subsequent 100% VT and DPI of completed overlay areas. Witnessed UT bonding examination for lack of fusion and disbondment using calibrated UT equipment, V2 reference block and weld-overlay reference step block. Reviewed NDT reports, signed ITP stages and supporting quality documentation.
SBM OffshoreHEATRIC / SGS UK Ltd2nd Stage IGC Discharge Cooler – PWTP Mechanical & Metallurgical TestingWitnessed and reviewed mechanical and metallurgical testing activities for PWTP samples including tensile testing, Charpy impact testing at -46°C, bend testing, hardness testing, ferrite testing and metallographic examination in accordance with ASME, ASTM and ISO requirements for duplex stainless steel weldments.
Samsung C&T / Acciona – Qatar Facility E IWPP ProjecBray Controls UK LtdManual & Motor Operated Butterfly Valves for Water PlantWitnessed hydrostatic shell and seat testing, functional/open-close testing, dimensional verification, nameplate verification, metallic surface protection inspection and final inspection activities for butterfly valves in accordance with approved ITP, test procedures and project requirements.
MAPA Construction / Juranah Water Reservoir Company (JWRC)Scotmas Group LtdChlorine Dioxide Generator Systems, Dosing Manifolds & Control PanelsWitnessed Factory Acceptance Testing, hydrostatic pressure testing, electrical and instrumentation verification, panel wiring checks, PLC I/O verification using 4–20 mA simulation, HMI functional testing, signal and alarm verification, P&ID cross-checking, control panel inspection and functional testing of chlorination systems in accordance with IEC requirements and approved project procedures/ITP.
ADNOC Offshore / NMDC EnergyCurtiss-Wright / Eta Process PlantPressure Safety Valves (PSVs) for Sea Water Filtration PackageFinal inspection and documentation review of Monel/Hastelloy PSVs including visual inspection, nameplate and serial number verification, inspection against piping isometrics and ITP requirements, review of valve test reports and documentation, coating/DFT verification and release readiness assessment for offshore service application.
ADNOC Offshore / McDermott Middle East Inc.Online Electronics Ltd / Gorilla Corrosion Services LtdNon-Intrusive Pig SignallersWitnessed painting and coating inspection activities including DFT measurements and adhesion pull-off testing in accordance with ASTM D4541 and approved coating procedures; verified coating inspection reports, calibration status, test plate inspection and painting documentation as per ITP requirements.
Kanadevia Inova ( HZI)Forbes Technologies Ltd3 off 100m³ Fully Demineralised Water Storage Tanks (GRP/FRP Composite Tanks) – Thameside ERF ProjectFinal Inspection Workshop, Pre-Delivery Inspection and Pre-Shipment Inspection; visual inspection, dimensional verification, Barcol hardness testing, laminate thickness verification, nameplate verification, internal/external surface inspection, nozzle/manhole verification, drawing and ITP review, documentation review and spare-parts verification in accordance with EN 13121 and approved ITP requirements.
COOEC / PIC ProjectSolartron ISA / DNVWet Gas FlowmetersWitnessed dry gas flow calibration activities at a UKAS accredited facility including verification of flowmeter installation against GA drawings, DP tapping verification, instrumentation/calibration checks, review of calibration data, flow-point verification, monitoring of pressure, temperature and flow parameters, and assessment of calibration results in accordance with approved calibration procedures and ITP requirements.
NPCC-SAIPEM JVWashington Components Ltd E Blast, eGroup Ltd AberdeenSubsea umbilical termination hardware (hang-offs & armour bodies)Paint adhesion testing, coating inspection including DFT measurement and visual assessment, ISO 4624 pull-off adhesion testing, evaluation per ISO 16276, coating procedure and QA report verification, calibration checks, MTC and traceability review, subsea offshore coating compliance verification, and paint-workshop site audit.
McDermott (MDR)Metec SARL -UK Averon Engineering Aberdeen – ScotlandROV-installable retrofit retroclamps for offshore subsea pipeline/umbilical systemsFinal inspection, visual and dimensional verification against approved GA drawings, coating inspection including DFT measurement, MTC/NDT/certification-package review, traceability and marking checks, punch-list issuance and re-inspection coordination.
ADNOC GasHowden CO GlasgowHYDROCARBON FLARE GAS RECOVERY COMPRESSORSFactory Acceptance Test of oil-free compressor in accordance with API 619; start-up inspection and stabilisation-run verification; Trip Speed Test verification; four-hour Mechanical Run Test; Heat Run Test; Performance Test at multiple discharge-pressure set points; monitoring of speed, vibration, bearing temperature, suction/discharge pressure and temperature; verification of lubrication-oil system and Dry Gas Seal operation; FAT-procedure, ITP and calibration-status review; FAT-record documentation review.
PetrobrasTechflow MarineOffloading System - UCP PN-UH-(FWD) & PN-UH-(AFT)Executed FAT and partial Integrated FAT of offshore Offloading Control Panels. Performed E&I inspection in accordance with IEC 60204-1 and IEC 60079. Verified wiring integrity, terminations, Protective Earth continuity and Insulation Resistance testing. Checked panel assembly against drawings, schematics, loop diagrams and BOM. Supported PLC/HMI functional checks, I/O verification and Cause & Effect matrix review. Conducted mechanical and visual inspection of enclosure build, cable entry layout, labelling and internal component installation. Raised punch-list items and supported offshore-commissioning readiness.
McDermottFTV Proclad International Limited – ScotlandConnector Subsea Solutions 32in #900 mechanical connectorsWelding inspection, machining expediting, ultrasonic examination of cladding, visual inspection, clad-thickness check, liquid penetrant inspection, PMI of clad overlay, hardness testing in groove area and final dimensional inspection using FARO.
NMDCEXHEAT Ltd, Watton, Norfolk, UKElectrical Process Heater Package, Tubesheet, Forged Flanges and Control PanelConducted inspection and field-expediting activities covering purchase-order, drawings, specifications, ITP, manufacturing schedule and progress-documentation review. Verified raw materials and bought-out items against MTCs, heat numbers and traceability requirements. Reviewed WPS, PQR, welder qualifications, consumable controls and NDT procedures. Performed welding surveillance and visual inspection. Reviewed VT, PT/LPI, MT, UT and PMI requirements and reports. Monitored heater, tubesheet, forged-flange, control-panel and instrumentation status, subcontractor progress, documentation and delivery schedule, and issued a field-expediting report.
INDIAN OIL CORPORATION LIMITEDHowden Compressors GlasgowDRIVE TRAIN FOR 050-K-002 DEHEPTANIZER VENT GAS COMPRESSORHydro test, inspection of outstanding project spares and data-dossier review.
Kuwait EnergyKROHNE LtdCoriolis Flow MetersPerformed FAT including hydrostatic testing and flow calibration; witnessed hydrostatic pressure testing; monitored flow calibration and accuracy tolerances; reviewed calibration certificates; identified and followed up calibration non-conformances and re-testing.
Shell CruxJDR CablesSubsea umbilicalInspected electric cables, fibre-optic cables and hydraulic hoses; supported FAT, reeling and final inspection.
L&T HYDROCARBON ENGINEERING LIMITED -ABU DHABIITT Bornemann companyMultiphase Pumps, Oil piping systems. Ball valvesWitnessed performance and mechanical-run testing, disassembly and strip testing for a multiphase pump. Inspected pump components, piping spools and ball valves, including visual, PMI, hardness and radiographic testing. Reviewed and signed NDT protocols, material certifications and calibration certificates, and inspected painting.
pt pln (persero) IndonesiaRolls-Royce Bergen Engines ASStationary enginesWitnessed FAT and engine performance testing at different loads, compared machine-derived test reports with quality documents, and assessed operating parameters including cylinder pressure, gas pressure and temperature, lubricating-oil pressure, water temperature, turbocharger speed, exhaust temperature, generator bearing and voltage, and crankshaft deflection.
ARAMCOIPP ACCURA Ltd ARAMCO ProjectDuplexFittings inspections, (Elbow,Tee-Reducer, Equal Tee, weldolet etc.)Reviewed material certificates, conducted material, dimensional and visual inspection, reviewed documents, and inspected coating, preservation and packing.
Groupement Berkine (Algeria Oil & Energy)Curtisswright CompanySafety valvesWitnessed hydrostatic and functional testing based on the inspection test plan and ASME standards. Controlled QA documents and procedures for series 3800 and series 2600 safety valves.
ShellFLEXIBLE ENGINEERED SOLUTIONSRiser DBSC clamp and Umbilical DBSC clampWitnessed FAT, functional and performance testing, visual and dimensional inspection, and document review.
Total Energies - SINOPECRossendale GroupMotor Lifting FrameReviewed material certification and performed post-test NDE including MPI and DPI, and proof-load testing.
ADNOC OFFSHORECeleros Flow Technology (GD Engineering)18” to 28” Bandlock 2 ClosurePerformed DPI and UT of weld overlay.
Siemens EnergyJDR CABLE LtdUmbilical Fiber Optic cablePerformed OTDR, insertion-loss and continuity testing, visual and dimensional inspection, and document review.
Qatar GasROTORK CONTROLS LTDHydraulic Actuator (Manual Ball Valves and Actuated Valves)Reviewed documents and witnessed FAT and performance testing; performed visual, packing and preservation inspection.
ShellFLEXIBLE ENGINEERED SOLUTIONS LTDRiser DBSC clamp and Umbilical DBSC clampWitnessed FAT, functional and performance testing, visual and dimensional inspection, and document review.
Special Piping Materials LimitedPIPE, ELBOW, FLANGE WELLDNECKInspection of pipe, elbow and weld-neck flange, quantity check, visual inspection, dimensional inspection and document review.
ManufacturerClient
BABCOC&KWILCOX- Diamond Power Specialty Ltd Glasgow - ScotlandHZI (Hitachi Zosen Inova)- Zurich, Switzerland
Inline Valve LtdGCC China
Schneider Electric LtdCLP Power Hong Kong Ltd
Chemical& Allied Products PLC, NigeriaAKZONOBEL Decorative Coatings Company
Howden CompressorADNOC-NMDC

Skills

Commodities