ZAHRA SAFARI is a QA/QC Inspector with over 10 years of experience in industrial inspection, quality control, and project coordination across the oil & gas, LNG, and manufacturing sectors. She is experienced in vendor and third-party inspections, including pre-shipment inspection, hydrostatic testing, functional inspections, FAT, and mechanical, instrumentation, and electrical equipment inspection. Her capabilities include vendor surveillance, quality audits, material traceability, compliance verification, inspection reporting, and NCR preparation in accordance with international standards and client requirements. She has conducted inspections for international manufacturers across Romania and Europe, including Emerson, Stamford, Flintab, and Balkansko, and has held project coordination and inspection supervision responsibilities.
| Row No | SUPPLIER | CLIENT | PROJECT | EQUIPMENT | INSPECTION ACTIVITIES |
|---|---|---|---|---|---|
| 1 | BALKANSKO EHO | LLC "Ruskhimalyans" EPC Contractor: LLC Velesstroy | Gas processing complex as part of the ethane-containing gas processing complex near the village of Ust-Luga. | Electric Chain Hoist | - Photo and video documentation of the inspection; monitoring of production processes with reflection in reports - Dynamic and static tests - Electromechanical tests (ЗОМ (Manual Control) and Automation). - External inspection of the hoist - Control of basic geometric dimensions - Electrical equipment inspection - Checking the operation of an electric hoist without load - Testing of electric hoists with rated load - Static testing of hoists - Dynamic testing of hoists |
| 2 | EMERSON | WOODSIDE | ETL SCARBOROUGH PROJECT | CORIOLIS FLOW METERS | Final inspection |
| 3 | EMERSON | Total Energies | Tilenga Project- Upstream Facilities | Thermowell, indicator and transmitter | Final inspection |
| 4 | EMERSON | TOTALENERGIES EP UGANDA | Tilenga Project - Upstream Facilities | Pitot Tube (Annubar) | Final inspection |
| 5 | EMERSON | Total Energies | TILENGA PROJECT CEMS & FLARE MONITORING PACKAGE | CEMS & Flare Monitoring | Final inspection |
| 6 | FLINTAB SRL | QATARENERGY LNG | North Field South Project Onshore LNG Facilities | WEIGHBRIDGE | 1. Reviewed project drawings, datasheets, ITPs, procedures, and applicable technical specifications. 2. Performed manufacturing record (MR) and document verification. 3. Reviewed vendor and sub-vendor documentation and procurement specifications. 4. Verified WPS, PQR, welding maps, welder qualifications, and NDT procedures. 5. Verified NDT personnel qualifications and examined NDT reports. 6. Witnessed pre-inspection meetings and inspection activities in accordance with ITP requirements. 7. Witnessed continuity and insulation resistance testing. 8. Verified hazardous area certification (ATEX/IECEx) documentation for electrical equipment. 9. Reviewed Inspection Release Notes (IRN) prior to shipment release. 10. Verified closure of NCRs, punch list items, and final documentation packages. 11. Verified material specifications, equipment compliance, and engineering comments against project requirements. 12. Ensured final documentation complied with client specifications and applicable international standards. |
| 7 | FLINTAB SRL | QATARENERGY LNG | North Field South Project Onshore LNG Facilities | WEIGHBRIDGE | Quality and documents Control |
| 8 | STAMFORD / AvK | CCS JV | MOZAMBIQUE LNG PROJECT | ESSENTIAL DIESEL GENERATOR | 1. Measurement of resistances (cold ) 2. No-load characteristic,remanent voltage,winding test 3. Short-circuit characteristic,overload test,SCR,xd 4. Rotating field control / phase sequence check 5. Voltage balance 6. Functional test of AVR-System 7. Load characteristic at p.f. = 0,1 8. Overspeed test 9. Vibration measurement 10. High voltage test (aka Hipot) 11. Measurement of insulation resistance 12. Determination of efficiency (calculated based on Tests 13. Determination of rated field current 14. Sustained short circuit test 15. Temperature rise test 16. Sudden short circuit test at partial voltage (for Xa,Xa", Ta, Ta") only for Low Voltage - 50% U nominal 17. Harmonic analysis of voltage waveform, THD 18. Sudden load application at p.f.0.1, diagram; max 2000kVA and 2500 kVA for LV 19. Noise pressure level measurement without harmonics 20. Polarization index measurement 21. Shaft voltage measurement |
| 9 | Appleton_ATX (Emerson Group) | Eni SpA/ SAIPEM | EPC BIO RAFFINERIA LIVORNO | Pannelli Luce e Forza Motrice | 1. Visual and dimensional check 2. Galvanization/painting check 3. Nameplate and label components check 4. Electrical Operation Test 5. Insulation Resistance Measurement 7. Power Frequency Voltage Dry Test 8. Voltage Test on Auxiliary Circuits 9. Wiring Check |
| 10 | EMERSON | BAKER HUGHES ENERGY SERVICES LLC | Woodise Lousiana LNG ( LALNG ) | Mixed Refrigerant Compresso rs -Gas Turbine Drivers | 1. Certification/MDR Review 2. Applicable Documents Presence & Last Revision Check 3. POSITIVE MATERIAL IDENTIFICATION,CONTROL VALVESPOSITIVE MATERIAL IDENTIFICATION,POSITIVE MATERIAL IDENTIFICATION |
| 11 | EMERSON | BAKER HUGHES ENERGY SERVICES LLC | Driftwood Louisiana LNG | PRESSURE REGULATING VALVE ORDERING SHEET | 1. Certification/MDR Review 2. Applicable Documents Presence & Last Revision Check 3. CHECK OF MATERIAL TRACEABILITY,CONTROL VALVESRAW,RAW |
| 12 | EMERSON | Eni SpA/ SAIPEM | EPC BIO RAFFINERIA LIVORNO | FLOW INDICATOR / FLOW TRANSMITTER – XX-6210 (LPG Treatment) | 1. Hydro witness inspection for 2 Mameters 2. Hydro witness inspection for 1 Vortex |
| 13 | ELECTROTEL SA | QatarEnergy LNG | North Field South Project Onshore Facilities | MV SWGR FOR FUEL GAS RECYCLE COMPRESSOR SB-365293 A/B | FINAL INSPECTION |
| 14 | FRAMO Fusa & FRAMO Holsnøy | BW Offshore | FPSO Offshore Project | Pumps & Piping Systems | 1.Review of Welding Procedure Specifications (WPS) 2. Review of Welding Procedure Qualification Records (WPQR) 3. Verification of welding documentation compliance with project specifications and applicable international standards |
| 15 | FATI S.R.L. | Woodside | FPSO Offshore Project | TEG Dehydration Package (Heater Bundle) | 1. Review of Welding Procedure Specifications (WPS) 2. Review of Welder Qualification Certificates (WQ/WPQ) 3. Review of Procedure Qualification Records (PQR) 4. Witness of Hydrostatic Test 5. Witness of Flushing Test 6. Witness of Pneumatic Test 7. Verification of inspection records and test documentation in accordance with project requirements |
| 16 | EMERSON | KT | Prototype Plant for PMMA Depolymerization 650 kg/h MYREMONO | Pressure Regulator | 1. Unpainted hydro, seat leakage 2. Visual & dimensional, functional, painting |
| 17 | EES-MECI | TECNIMONT | REALISATION EN EPC D’INSTALLATIONS DE PRODUCTION DE LINEAR-ALKYL-BENZENE <<LAB>> A SKIKDA ALGERIE | - Piping - 910-PK-001 (Kerozene) -Piping - 930-PK-002 (LAB) -Piping - Prover associated to 910-PK-001 (Kerozene) & 930-PK-002 (LAB) - Piping - 810-PK-001 (Natural gas) | 1. Hydro test for piping. 2. Visual and dimensional check / Name plate check 3. Material Inspection / Certificates / Traceability 4. Welding visual check 5. Welding NDT check |