Andrea Tunesi is an Oil & Gas Inspector and Expeditor with experience since 2017, working from January 2022 for AB Oil & Gas Service Srl. He is specialized in mechanical, industrial and welding inspections and expediting for national and international clients. His scope includes valves, pipes, fittings, skids and associated material documentation, including EN 10204 3.1 and 3.2 certification evaluation. He performs visual and dimensional inspections, NDT Level II testing using UT, PT and MT methods, audits, and the control and approval of test reports and certificates. His electrical and instrumentation experience covers LV/MV switchgears, DCS and ESD systems, cables, transformers, battery charger panels, PLCs, field instruments and automation systems. He has supported major Oil & Gas and EPC clients including Shell, Exxon Mobil, Chevron, ENI, Total, Petrofac, Petrobras and Qatargas.
| Equipment | Client | Project | Vendor |
|---|
| Booster ASD Transformer | ADNOC | PROJECT P5.0 – Asab And Buhasa & Assets | SPECIALTRASFO |
| BUTTERFLY VALVES | ZEECO | KINNEIL TRAIN STORAGE FACILITY, GRANGEMOUTH | IMI ORTON |
| CLADDED FITTING | QATARGAS SAIPEM | EPCOL FOR NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) OFFSHORE & PIPELINES PROJECT | EEW PIPE PRODUCTION ERNDTEBRUECK |
| FLOATING VALVES | HOT ENGINEERING & CONSTRUCTION CO. KSCC | SHUWAIKH POWER STATION | OMB VALVES SPA |
| BUTTERFLY VALVES | EQUATE PETROCHEMICAL | C-00-835 EUDB 177 CASE LEFT OVER EQUIPMENT | EMERSON VANESSA |
| ACTUATED CHOKE VALVES | ADNOC | CALL-OUT CONTRACT FOR BU HASA WELLHEAD REMOTE MONITORING & CONTROL IMPLEMENTATION & CONSTRUCTION OF OIL NETWORK OVER PRESSURE PROTECTION - LONG TERM | QUAM |
| PIPELINE FLANGES AND TEST RINGS | PT. GUNANUSA UTAMA FABRICATORS | ZAWTIKA DEVELOPMENT PROJECT PHASE 1D EPCI OF WELLHEAD PLATFORMS, ASSOCIATED PIPELINE | OFFICINE GALPERTI |
| MANUAL CHOKE VALVES | DIALOG E&C SDN BHD | BYGP2 | QUAM |
| PRESSURE SAFETY VALVES | RELIANCE | P-AS005 / MEG RECLAMATION FACILITIES | TAI MILANO |
| CLADDED FITTING | QATARGAS SAIPEM | EPCOL FOR NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) OFFSHORE & PIPELINES PROJECT | TECTUBI RACCORDI SPA |
| BALL VALVES (PR2) | MODEC | BACALHAU EMCC | IMI TRUFLO |
| EQUAL BARRED TEE SEAMLESS | GPS | EPC FOR SILIA DEBOTTLENECKING & OMIFCO PROJECT | COPROSIDER |
| PIPING | ROBTSTONE/ADNOC | PIPELINE REMIDIAL PROJECT | COPROSIDER |
| CLADDED FITTING | QATARGAS SAIPEM | EPCOL FOR NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) OFFSHORE & PIPELINES PROJECT | CHERO PIPING |
| FLANGES | PTSC MECHANICAL AND CONSTRUCTION | GLF3- PROJECT-PC2 STEEL PIPING BULKS | OFFICINE MELESI |
| BALL VALVES | HEISCO | CONSTRUCTION OF FLOWLINES AND ASSOCIATED WORKS IN KOC WEST KUWAIT AREA | TAI MILANO S.P.A - ITALY |
| TRIPLE OFFSET VALVES | SAMSUNG ENGINEERING CO., LTD. | SARAWAK METHANOL PJT | EMERSON VANESSA |
| MOORING QE554AL031 TENSIONING SYSTEM | HYUNDAY / PETROBRAS | P-78 PROJECT | REMAZEL ENGINEERING S.P.A. |
| FITTING | QATARGAS | EPCOL FOR NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) OFFSHORE & PIPELINES PROJECT | TECTUBI RACCORDI SPA |
| ON OFF AND CONTROL VALVES | LINDE | LINDE PROJECT K-01-3110C7H2 | EMERSON VANESSA |
| BALL VALVES | MODEC | PETROBRAS FPSO ALMIRANTE BARROSO MV32 | CAMERON ITALY |
| FITTING | QATARGAS | EPCOL FOR NORTH FIELD PRODUCTION SUSTAINABILITY (NFPS) OFFSHORE & PIPELINES PROJECT | TECTUBI RACCORDI SPA |
| COMBUSTION CHAMBERS | ZEECO | EXXON COMBUSTION CHAMBER | ADNOR |
| MANUAL BALL VALVES | NATIONAL PETROLEUM CONSTRUCTION COMPANY (NPCC) | BELBAZEM FULL FIELD DEVELOPMENT PROJECT EPC STAGE | GWC ITALIA |
| FORGED FITTING | ADNOC | OPTIMUM SHAH GAS EXPANSION | CHERO PIPING |
| BALLAST GATE VALVE | PD&MS | BALLAST SYSTEM REPAIRS | CAMERON ITALY |
| REFRACTORY MATERIAL | KTI POLAND S.A. | VISBRAKER UNITS | REFRATTARI SIRC S.R.L. LINCO BAXO |
| CV TEST ON BALL VALVES | NPCC/ADNOC | EPC FOR DALMA GAS DEVELOPMENT PROJECT | SIET/QUAM |
| INCONELL FITTINGS | QATAR GAS | NORTH FIELD EXPANSION (NFXP) PROJECT – OFFSHORE | ALLIED/TECTUBI RACCORDI |
| BALL VALVES | VALVITALIA | VALVITALIA PROJECT | VARIOUS (OFF.MECCANICA MARTINI, BBD, LP LAVORAZIONI MECCANICHE, INSCO, ECOKIMICA) |
| FORCED DRAFT FAN IDUCED DRAFT FAN COOLING AIR FAN | HYUNDAI POWER SYSTEM | PKN ORLEN OLEFINS EXPANSION PROJECT | AEROMECCANICA STRANICH |
| UPS AND BATTERY CHARGER | SHANGHAI WAIGAOQIAO | SWS PROJECT | RIELLO UPS RPS SPA |
| FAS CABINET AND DETECTORS, ACCESSORIES AND SPARE PARTS | NOVA ENERGIES | ARTIC LNG2 | EUROCONTROLLI |
| PRESSURE REGULATING VALVE | DAEWOO | HU-CHEMS 6NA & 2MNB PLANT PROJECT | CARRARO |
| RUPTURE DISCS | KPO | FOR KARACHAGANAK PETROLEUM OPER. B.V PROJECT | DONADON |
| PRESSURE SAFETY VALVES | KPO | FOR KARACHAGANAK PETROLEUM OPER. B.V PROJECT | TAI MILANO |
| SHELTER | PETROFAC | NC200 ERAWIN FIELD EPF - PHASE I (PLAN B) | OMNISHELTER |
| FOAM MONITOR | SAPURA | SPTL A2 BERTH PROJECT | FAS |
| SKID | GE BAKER HUGHES | HYUNDAI & ENGINEEERING | LAZ |
| EQUAL BARRED TEE SEAMLESS | GPS | EPC FOR SILIA DEBOTTLENECKING & OMIFCO PROJECT | COPROSIDER |
| PIPING | SBMOFFSHORE | MERO 2 FPSO (FIELD INSPECTION EURO) | OMR |
| BALL VALVE | PETROJET | THE PETROLEUM PROJECTS AND TECHNICAL CONSULTATION CO. (PETROJET) | ITALBEST VALVE S.R.L. |
| GASKETS | GERAB | SUPPLY OF BULK MATERIAL | SEVAL |
| MAIN CONDENSER LOWER | BAKER HUGHES & MODEC OFFSHORE PRODUCTION SYSTEMS (SINGAPORE) PTE LTD | BHGE PROJECT | A.S.T.R.A. REFRIGERANTI SRL |
| PIPING | IREN | CENTRALE TERMOELETTRICA DI TURBIGO RIPOTENZIAMENTO UP_TURBIGO_3 | PLANA |
| ON-OFF VALVE (BUTTERFLY) | SECL | SAMSUNG PROJECT | EMERSON VANESSA |
| CHECK SWING VALVES VARIOUS SIZE | PETROJET | PETROJECT SUPPLY PROJECT | CVB VALVES |
| THROUGH CONDUIT GATE VALVE | PDMS | BERYL ALPHA | QUAM |
| THERMODISTRUCTORS AND EMERGENCY TORCHES | SNAM RETE GAS | SNAM PROGETTI:SISTEMA TERMODISTRUTTORE 00-230-0-AFY-001 TORCIA DI EMERGENZA 00-230-0-AFD-001 | GBA COSTRUZIONI – ADLER – ED SOLVING |
| ACTUATOR OLEOPNEUMATIC | SNAM RETE GAS SPA | SNAM PROJECT | DVG AUTOMATION |
| SKID | SNAM RETE GAS SPA | SNAM PROJECT | INDUSTRIAL PLANTS |
| FLANGE AND FITTING | TECKNIP KTI | 30.551-SISAK REFINERY NEW SRU CROATIA | CHERO PIPING |
| SAFETY VALVES | TECKNIP KTI | EMG EAST MEDITERRANEAN GAS | TAI |
| SAFETY VALVES | NPCC | MOQ PROJECT NÒ.6048 | TAI |
| SAFETY VALVES | KUWAIT OIL COMPANY | STATION BS 160-HP TRAIN 1/2 | TAI |
| SAFETY VALVES | NORD STREAM AG | NORD STREAM PIPELINE PROJECT | TAI |
| PILOTED OPERATED SAFETY VALVES | ADCO | ASAB PROJECT | TAI |
| SAFETY VALVES | SONATRAC FIRST CALGARY PETROLEUMS | MENZEL LEDJMET EAST PROJECT ALGERIE | TAI |
| SAFETY VALVES | DAELIM INDUSTRIAL CO, LTD | GE OIL & GAS | TAI |
| SAFETY VALVES | SKID | CENTRALE A CYCLE COMBINE DE KOUDIET EG DRAOUCH | TAI |
| SAFETY VALVE | TECHNIP OCEANIA PTY LTD -AUSTRALIA | KUPE GAS PROJECT | TECHNICAL |
| PIPING OF CENTRIFUGAL COMPRESSOR SKIDS. | CHIYODA | QATARGAS 3&4 ONSHORE PROJECT (QCS PROJECT | LAZ |
| BALL VALVES | SNAMPROGETTI | ADRIATIC LNG PROJECT | CCV GROVE |
| PLUG VALVES | ENAGAS | GASODUCTO | GALLI E CASSINA |
| WROUGHT STEEL FITTING | THAI | THAI BINH II THERMAL POWER PLANT | TECTUBI RACCORDI S.P.A |
| PLUG VALVES | ENAGAS | ESTACION DE COMPRESION DE ZARAGOZA | GALLI E CASSINA |
| PLUG VALVES | ENAGAS | GASODUCTO MONTESA-DEINA | GALLI E CASSINA |
| PLUG VALVES | ENAGAS | MONTESA P. 200000605 0170 | GALLI E CASSINA |
| BALL VALVES | CHIYODA LI MITED | SAKHALIN LNG PROJECT | PIBIVIESSE |
| CASTINGS | BOUSTEAD INTERNATIONAL HEATERS | BOUSTEAD INT.HEATERS LTD | FIAS |
| GLOBE VALVES CL 1500 | PETROFAC ENGINEERING LTD | AMENAS PROJECT ALGERIA | PETROLVALVES |
| MLV BALL VALVES & LARGE BORE BALL VALVES. | WORLEY PARSONS SERVICES PTY LTD | STAGE 5A EXPANSION | CCV GROVE |
| BALL VALVES | PETROLEO BRASILEIRO S/A - PETROBRAS | PDET SHALLOW WATER | PIBIVIESSE |
| INDUCED AIR FLOTATION PACKAGE | LAFFAN REFINERY COMPANY | 7S19/LAFFAN REFINERY PROJECT | TECHNIPLANT |
| BALL VALVE B5 12"/1500 RTJ WITH PNEUMATIC ACTUATOR, | MITSUBISHI | SOHAR FERTILISER PROJECT | GROVE |
| CHECK, GATE, GLOBE VALVES | AKER KVAERNER NETHERLANDS BV | YAN PETROCHEMICAL COMPLEX PROJECT | FASANI TYCO |
| SUPER DUPLEX STAINLESS STEEL MANUAL AND PNEUMATICALLY ACT.BUTTERFLY VALVES | QUIP SA-BRASIL | RIO GRANDE-RS - BRAZIL | VANESSA TYCO |
| QUALIFICATION TEST BEND CARBON STEEL | BURULLUS GAS COMPANY | ENI-SAIPEM P.O.253939 | NORDON NANCY |
| SPLIT UNIT WITH REMOTE CONDENSER | MONTAZHSPEZSTROY REPUBLIC OF KAZAKSTAN | KASHAGAN EXPERIMENTAL PROGRAMME(KAZAKHSTAN) | FRIGOTERMICA |
| REACTOR HEATER ITEM | TECHNIP KTI | P.O. NR.30561/A0003 | FATI |
| HYDRO REACTOR – | TECHNIP KTI | P.O. NR 30561/A0001 | ORLANDI IMPIANTI |
| COALESCER FILTERS | TÉCNICAS REUNIDAS, S. A. –KOC - KUWAIT | CAPACITY EXPANSION FOR COMPRESSION AND MEDIUM CRUDE PROCESSING | FILTERS - S.R.L. |
| COOLING TOWER – ITP 851-11-195/1 | SIEMENS VAI TECHOLOGIES - GL THERAN | L/C IR/9201/85700207 -CONFIRMATION OF ORDER 06/00851(34-497) AND 06/00851(11-195). | DECSA - |
| SUB-SEA BALL VALVES | APACHE ENERGY LIMITED – AUSTRALIA PDG | 859127-914969 – P.O.4700290671 | COOPER CAMERON-RING-O VALVES |
| ACTUATED AND MANUAL GATE VALVES | KARACHAGANAK PETROLEUM OPERATING BV | AP/X/01/2101 | BREDA ENERGIA |
| PIPING | TECHNIP KTI | 30551 | CHERO PIPING |
| BALL VALVES | DAEWOO ENG. & CONS. | PU230-M1005 | VALVITALIA |
| BALL VALVES | MONTAZHSPEZSTROY | 2002/0973 | VALVITALIA |
| BALL VALVES | QATARGAS | 0923-D5743-DD204939 & DD204941 | CAMERON-RING-O VALVES |
| BALL VALVES | MARSHSIDE | NORD STREAM | PETROLVALVES |
| FITTINGS | SAIPEM-TOTAL | USAN – UFR & OLT | BASSI |
| BALL VALVES | TOTAL | ANGOLA | CAMERON |
| GATE /BALL VALVES | NORD STREAM | NORD STREAM PROJECT RUSSIA/GERMANY | PETROLVALVES |
| GATE/BALL VALES AND PIPING INSULATION JOINTS | JRM MCDERMOTT MIDDLE EAST INC. | ARAMCO KARAN PROJECT | O.M.B. – B.FE. – PIBIVIESSE – TECTUBI ETC. |
| HORIZONTAL HEAT EXCHANGER | K.O.C. | KUWAIT | METALLURGICA MEDOLAGO |
| VIROLE/VESSEL | STF | FRANCE NUCLEAR | CIMA |
| REFRIGERANT DESUPERHEATER | GASCO | ABU DABHI | SNAM PROGETTI |
| CENTRIFUGAL PUPMS | CTCI CORPORATION | 09P0001A01 | FLOWSERVE |
| CONDENSING UNIT TAG.CPF-HB-77-201A/201B PER SUBSTATION HVAC SYSTEM | ENI - SAIPEM | MLE ALGERIE | FRIGOTERMICA |
| CHEMICAL INJECTION PACKAGES | ENI - SAIPEM | MLE ALGERIA | SEKO |
| BALL VALVES | TOTAL | USAN PROJECT | CAMERON GROVE |
| VENTURI | QAFCO QATAR | STEAM HEADER INTEGRATION | TERCOM |
| FAN | GE OIL & GAS | VARIOUS | CBI |
| HYDRAULIC/PNEUAMATIC ACTUATORS | NORD STREAM | NORD STREAM PROJECT RUSSIA/GERMANY | TYCO BIFFI |
| PROCESS GAS INTERCONNECTING PIPING | GE OIL & GAS | EDISON | LAZ |
| LUBE OIL INTERCONNECTING | GE OIL & GAS | EDISON | LAZ |
| HIGHT / LOW PRESSURE FLARE TIP | CNR INT. | PLATFORM NINIAN SOUTH | GBA |
| HVAC-CCR-CENTRAL CONTROL PACKAGE | SAIPEM | MENZEL LEDJMENT EAST PROJECT ALGERIA | SEKO |
| NITROGEN GENERATION PACKAGE | KARAN | KARAN UTILITIES & COGENERATION PROJECT | AIR PRODUCTS NORWAY |
| INJECTION COMPRESSOR | SAMSUNG – GE OIL - ARAMCO | SHAYABAH | LAZ |
| ALKALINE FILTER, UV STERILIZER, FRESH WATER PACKAGE | HYNDAY | GOLIAT FPSO | MEMBRANE |
| PIGGABLE WYES WITH PUP PIECES | CONOCOPHILLIPS | GREATER EKOFISH AREA PROJECT | M.E.G.A. |
| FITTING & PIPELINE INSULATION JOINTS | CHEVRON | GORGON PROJECT | ALLIED |
| FITTING & PIPELINE INSULATION JOINTS | SAMSUNG | SHAYBAH #1 | LAZ |
| PIPING SPOOLS | SAMSUNG | SHAYBAH #1 | LAZ |
| FITTING & PIPELINE | SAMSUNG | SHAYBAH #4 | BASSI |
| BUTTERFLY VALVES | SK ENG. | WASIT | TYCO VANESSA |
| BUTTERFLY VALVES | DAELIM/ | SAUDI YAMBU/ SADARA PROJECT | PENTAIR VANESSA |
| ACTUATED SLAB GATE VALVES | HYUNDAY/ENI NORGE | GOLIAT DEVELOPMENT PROJECT- RFQ: 1Q5C- S77900A2 | ATV SPA (JOB 459 ) |
| EXPANDING GATE VALVES AND SLAB GATE VALVES | HYUNDAY/ENI NORGE | GOLIAT DEVELOPMENT PROJECT IP02/QE524A2P02 | ATV SPA (JOB 426) |
| INJECTION QUILL | HYUNDAY/ENI NORGE | RFQ /PO NO: QE524A3W22 | CONACO |
| SKID- FRESH WATER GENERATOR PACKAGES - FOR GOLIAT FPSO PROJECT. | ENI NORGE HYUNDAI HEAVY INDUSTRIES | PROJECT: GOLIAT FPSO QE524B7H84 / 11J0012 | MEMBRANE SRL / RO IMPIANTI |
| FRESH WATER GENERATOR, 53XX001 A/B/C/D | ENI NORGE HYUNDAI HEAVY INDUSTRIES | FLUXA FILTRI SPA/LAB. COLMAS |
| PIPING FOR GAS AND OIL MAIN SKID | CLIENT: ENI NORGE HYUNDAI HEAVY INDUSTRIES | PROJECT: GOLIAT FPSO RFQ /PO NO: 1Q01/QE524B3Q01 | LAZ S.P.A. |
| EMERGENCY SHUT DOWN BALL VALVES | PETROFAC/ADCO | BAB HABSHAN 1 PROJECT | PIBIVIESSE S.P.A. |
| FITTINGS & PIPING INSULATION JOINTS | PETROFAC/ADCO | BAB HABSHAN 1 PROJECT | PIANA S.P.A. |
| ACTUATED BALL VALVES | MCDERMOTT ASIA PACIFIC PTE LTD MC DERMOTT ASIA | INPEX ICHTHYS PROJECT | PETROLVALVES S.P.A. |
| MANUAL & ACTUATED BALL VALVES | TALISMAN ENERGY | MONTROSE BLP PROJECT NUMBER: MO539 INSPECTION | DELLA FOGLIA S.P.A. |
| ACTUATED BALL VALVES | MCDERMOTT/INPEX | THE ICHTHYS GAS FIELD DEVELOPMENT | PETROLVALVES |
| ACTUATED BALL VALVES | PETROFAC/ADCO | BAB HABSHAN-1 DEVELOPMENT PROJECT (PHASE 1) | PIBIVIESSE S.P.A. |
| ACTUATED BALL VALVES | PETROFAC/ADCO | UPPER ZAKUM 750 ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT NO. P7512 | B.F.E. S.P.A. |
| ICU RIG PACKAGE | STATOIL/DSME | MARINER TOPSIDE EPC DRILLING P.O.4502652650 | DRILLMEC S.P.A. |
| FINGER TYPE SLUG CATCHER PACKAGE | PETROFAC/BP | CENTRAL PROCESSING FACILITY(CPF) KHAZZAN PROJECT | BASSI LUIGI S.P.A. |
| PNEUMATIC ACTUATORS | SEPCO | MASTER GAS SYSTEM EXPANSION | CAMERON LEDEEN |
| FITTINGS PIPES INSULATION JOINTS | PETROFAC/PDO | RHIP | I.B.F./TUBACEX S.P.A. |
| PNEUMATIC ACTUATORS | PETROFAC/PDO | YIBAL KHUFF PROJECT | DVG AUTOMATION |
| PENTAIR ACTUATION & CONTROL | KNPC | KNPC CFP PROJECT | VIRGO VALVES AND CONTROLS PRIVATE LTD. |
| PNEUMATIC ACTUATORS | SEPCO | MASTER GAS SYSTEM-PHASE 1 | CAMERON LEDEEN |
| OPERATED BUTTERFLY VALVES | SEPCO | JAZAN IGCC POWER BLOCK PROJECT | IMI/ORTON VALVES |
| OPERATED BUTTERFLY VALVES | PETROFAC/PDO | YIBAL KHUFF PROJECT | VANESSA/PENTAIR SPA |
| FITTINGS | PETROFAC | FADHILI GAS PROJECT | CDB ENG. |
| BALL VALVES | ARKAD | MASTER GAS PROJECT II, III | CAMERON ITALY - GROVE |
| FITTINGS | TECNICAS REUNIDAS / | JAZAN PROJECT | BASSI LUIGI SPA |
| FITTINGS | PETROFAC | FADHILI GAS PROJECT | CDB ENG. |
| BUTTERFLY VALVES | PETROFAC | FADHILI GAS PROJECT | IMI ORTON GROUP |