ALESSANDRO BONICALZI is an experienced mechanical and electrical inspector, Inspection Quality Surveyor and Expeditor serving Oil & Gas, Petrochemical and Heavy Industry markets. Since January 2015, he has owned and managed AB Oil & Gas Service Srl while following inspection activities for major international clients and engineering companies. His scope covers welded structures, forgings, castings, pipes, flanges, fittings, valves, actuators, coatings and pressure equipment, supported by expertise in international codes, customer specifications and manufacturing processes. He has performed welding and NDT inspection, dimensional and material verification, pressure and functional testing, coating checks and supplier surveillance. He also prepares inspection reports, release notes, data-book reviews and non-conformity follow-up, and has conducted PR2 testing involving pressure, temperature and torque cycles.
| Project | Contractor | End user | Equipment | Period |
|---|---|---|---|---|
| NFPS Offshore Compression Complexes Project COMP3 | QE LNG | SAIPEM | VALVES | 2025-2026 |
| ABU DHABI NATIONAL OIL COMPANY (ADNOC) GHASHA CONCESSION PROJECTS | ADNOC | NPCC-SAIPEM | VALVES | 2024-2026 |
| HABSHAN & BAB CONTROL SYSTEMS UPGRADE PROJECT (PACKAGE-1) PROJECT No:0405323 | ADNOC | TARGET | VALVES | 2025-2026 |
| BALEINE | ENI | BH | VALVES | 2024-2026 |
| 4193 Hammerhead FPSO Project | MODEC | HAMMERHEAD | FITTINGS | 2024-2026 |
| Daman Upside Development Project - Wellhead Platforms and Pipelines | ONCG | L&T Energy | VALVES | 2024-2026 |
| P013381-E-011/CTR-001 | SVS | PD&MS Energy (Aberdeen) Ltd | FITTINGS | 2025-2026 |
| EPC For Well Digitalization for Bab, Buhasa & Southeast Project. | JERELL | ADNOC | VALVES | 2025-2026 |
| ZUBAIR FIELD | ENI | VALVES | 2024-2025 | |
| UPGRADE OF CHEMICAL INJECTION & MONITORING | MECC | KOC | VALVES | 2024-2025 |
| CLAIR RIDGE | AMEC | BP | FORGED BODY & BONNETS SUBSEA GATE VALVES, GLOBE, CHECK | 1 Year |
| MAGNUS | PETROFAC | BP | C.S. SUBSEA BALL VALVES | 3 Months |
| WEST NILE DELTA | AMEC | BP | C.S. SUBSEA BALL VALVES | 4 Months |
| SHAH DENIZ | AMEC | BP | BALL, GATE AND CHECK VALVES | 2 Years |
| AIOC | AMEC | BP | BALL, GATE AND CHECK VALVES | 12 Months |
| ANDREW | WOODGROUP | BP | C.S. SUBSEA BALL VALVES | 9 Months |
| UBILYNOE | GAZPROM | BALL VALVES, FULLY WELDED, MAINTENABLE | 12 Months | |
| ASTRAKHAN | GAZPROM | BALL VALVES, FULLY WELDED, MAINTENABLE | 8 Months | |
| BOVANENKO | GAZPROM | BALL VALVES, FULLY WELDED, MAINTENABLE | 8 Months | |
| NORD STREAM | CHEVRON | FORGED BODY & BONNETS SUBSEA GATE VALVES. BIG SIZES | 12 Months | |
| SAKHALIN | KTS | C.S BALL VALVES | More than 1 year | |
| KARACHANAG | KTS | C.S BALL VALVES | More than 1 year | |
| HAIL SURFACE PROJECT | CUNADO | INITEC TECNICAS REUNIDAS | BALL VALVES | More than 1 year |
| PLANT, RUMAILA OIL FILED, IRAQ | CPECC | - | MOTOR OPERATED BALL VALVES | 8 Months |
| NORTH MALAY BASIN | Hess Exploration & Production Malaysia B.V. | PETRONAS | SUBSEA BALL VALVES | 8 Months |
| EF-1928 | PETROFAC | KOC | Floating Ball Valves | More than 1 year |
| GHANA OCTP | GE | SUBSEA BALL VALVES | More than 1 year | |
| ZADCO | NPCC | TECHNIP | FITTINGS | More than 1 year |
| NATGASOLINE METHANOL-AIR LIQUIDE | ORASCOM | - | BUTTERFLY, BALL, CHECK, GLOBE VALVES | 3 Months |
| TAPIS E PROJECT | VALSER | KENCANA PINEWELL SDN BHD | ACTUATED BALL VALVES | 3 Months |
| AEGEAN REFINERY PROJECT (ARP) | - | SAIPEM | HOSTING SYSTEM | 3 Months |
| NEW GATHERING CENTRE GC 30, IN NORTH KUWAIT | LARSEN & TOUBRO | KOC | BALL VALVES | More than 1 year |
| ICHTHYS INPEX | - | GE OIL & GAS | FORGED PIECES | 6 Months |
| AL NASR FULL FIELD DEV. PROJECT-PKG I | NATIONAL PETROLEUM CONSTRUCTION COMPANY | ESD VALVES (ON-OFF ACTUATED BALL VALVES) | 6 Months | |
| NARGAN | TECHINCO | ASCO | DIESEL HYDROTREATMENT PROJECT (DHT), PIPING, HEAT EXCHANGER, FANS | More than 1 year |
| ADMA OPCO- UMM LULU FULL FIELD DEV.PROJ | NPCC | - | 6 Months | |
| BARONIA PRJ | HYUNDAI | PETRONAS | ACTUATED BALL VALVE | 3 Months |
| CLEAN FUELS PROJECT | KNPC | G&S | ON-OFF VALVES (BALL) | More than 1 year |
| IGD-E (PHASE 1) PACKAGE 3 | TECNICAS REUNIDAS | GASCO | HEAT EXCHANGER | 1 Month |
| EPC OF 32” SALALAH LOOPLINE | - | OMAN GAS COMPANY | TUBES | 6 Months |
| WEST HUB DEVELOPMENT – OCHIFUGU FIELD | - | SAIPEM | STEEL PIPES | 6 Months |
| RAPID PROJECT PACKAGE 3 | TECNICAS REUNIDAS | STEEL PIPES | 6 Months | |
| KARBALA PRJ | HYUNDAI | - | STEEL PIPES, ELECTRIC HOISTS, ELECTRICAL CRANE, PUMP, DUMPER, FLANGES | More than 1 year |
| SATAH AL-RAZBOOT (SARB) FIELD DEVELOPMENT PROJECT – EPC PKG4 | HYUNDAI | BALL, GATE, CHECK, CHOKE, SUBSEA VALVES, MONITORS | More than 1 year | |
| BG EXPLORATION AND PRODUCTION INDIA LIMITED / SUPPLY BALL VALVES FOR PPA AND SATELLITE PLATFORMS | BG EXPLORATION | BALL VALVES | 3 Months | |
| CULZEAN FIELD DEVELOPMENT | MAERSK OIL | SEMBCORP MARINE | BALL VALVES | 3 Months |
| SOUTH PARS PHASES 17 &18 | - | IS INDUSTRIES | JUNCTION BOXES | 3 Months |
| NH3-UREA Aswan (EG) EPC - KIMA | TECNIMONT | FLANGES | 4 Months | |
| SOUTH PARS GAS FIELD DEVELOPMENT PHASE 14 | NIOC | POGC/ISOICO | CYLINDERS | 3 Months |
| LORDEGAN AMMONIA & UREA FERTILIZER PROJECT | LORDEGAN UREA FERTILIZER COMANY | HAMPA ENGEENERING CORPORATION | HEAT EXCHANGERS, SPARE TUBES FOR EXCHANGERS | 4 Months |
| IWMP EVAPORATOR PACKAGE | HPD | - | AUTO PILOT VALVE | 3 Months |
| EPC FOR AL DABB’IYA FACILITIES DEVELOPMENT PHASE III | TECNIMONT | ADCO | ON-OFF BALL VALVES | 6 Months |
| EPC WORKS FOR POTABLE WATER SYSTEM & SEWAGE TREATMENT PLANT AT ZIRKU | ZADCO | - | UPS SYSTEM | 3 Months |
| PARSIAN C2+ RECOVERY AND FRACTIONATION PROJECT | PALAYESH PARSIAN SEPEHR CO. | HAMPA ENGEENERING CORPORATION | GASKETS | 3 Months |
| 3873 – CORU PROJECT MOSCOW-RUSSIAN FEDERATION | GAZPROM NEFT | TECNIMONT | CONTROL VALVES | 3 Months |
| SOHARIII POWER PROJECT | - | SEPCOIII ELECTRIC POWER CONSTRUCTION CORPORATION | FAN FOR COOLING TOWER | 3 Months |
| MENDER DEVELOPMENT PRJ PHASE 1 | - | ADCO | ON-OFF VALVES | 3 Months |
| TEMPA ROSSA | TECNIMONT | EXTERNAL DUCT FOR WELLSITES | ALBIZZATI | 2017 |
| ORICA Australia Pty Ltd | Exchanger | Costacurta /Casale | 2016 | |
| SOCAR POLYMER | TECNIMONT | Steamer off gas drying package & Propylene dryer package | Premabergo Italiana SRL | 2016 |
| SOCAR POLYMER | TECNIMONT | Electric and Nitrogen heater exchangers | FATI srl | 2016 |
| KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM | NCOCNV | TOP ENTRY 18” BALL VALVES | Valvitalia | 2016 |
| KASHAGAN DEVELOPMENT EXPERIMENTAL PROGRAM | NCOCNV | TOP ENTRY 28” BALL VALVES | Valvitalia | 2016 |
| Central Processing Facility (CPF) Khazzan Project | Petrofac | Gas exchanger | Brembana & Rolle | 2016 |
| ADRAR PROJECT | TouatGaz | Ball Valves | Emerson-Virgo | 2016 |
| Petrofac JSD6000 Vessel project | Petrofac | Stinger handling system | F.lli RIGHINI | 2015 |
| Shenhua Ningxia 4 million t/y Coal-to-Liquids Project | Shenhua Ningxia Coal Industry Group Co | Control Valves | PARCOL SPA | 2015 |
| ADRAR TOUATGAZ PROJECT | GROUPEMENT TOUATGAZ | Control Valves | ECOSERVICE | 2015 |
| ADRAR TOUATGAZ PROJECT | GROUPEMENT TOUATGAZ | BLOWER | UNIDRO s.pa. | 2015 |
| EPCC of Wellpad E&F | PETRONAS CARIGALI IRAQ HOLDING B. V | Manual Ball Valves | ERREESSE Spa | 2015 |
| NAWARA GAS TREATMENT PLANT (NAWGTP) | OMV GMBH | WASTE HEAT RECOVER UNITS | Bono Energia spa | 2015 |
| LICHTERFELDE | Vattenfall Power Consult GmbH | GLOBE, GATE & TRUNNION BALL VALVES | LVF srl | 2015 |
| LICHTERFELDE | NOOTER/ERIKSEN | Valve Wedge Gate Seal & Swing Check Valve | PENTAIR VALVES & CONTROLS | 2015 |
| Sturgeon Refinery Project | Technical Reunidas | LIFT & GATE valve | OMB | 2015 |
| NUEVA UNIDAD DE REFORMACION CATALITICA | Technical Reunidas | Control Valve | Carraro spa | 2015 |
| EPCC of Wellpad E&F (Infill 3) for Petronas Carigali Iraq Holding B.V | PETRONAS | Bulk Valve | ERREESSE SRL | 2015 |
| KNPC Fluor - Kuwait | Howden Thomassen Compressors | Lube oil heat exchanger | Coes srl | 2015 |
| La Pampilla | REPSOL | Skid compressor Package | INGERSOLL RAND | 2015 |
| Umm Lulu full field development project | ADMA-OPCO | GRE TANK | Plastic Glass | 2015 |
| NORTH RUMAILA -- NATURAL GAS UTILIZATION PROJECT | Nuovo Pignone | HYDROCARBON PUMP | GRUPPO ATURIA SPA | 2015 |
| ADRAR TOUATGAZ PROJECT | GROUPEMENT TOUATGAZ | PW Floating Sludge Pump Skid SD | ECOSERVICE | 2015 |
| EL ELDEN | HB SADELEC | Turbine Components | Getecma | 2015 |
| HOKKAIDO ELEC.POWER (HT-4) | Mitsubishi Hitachi Power Systems Ltd. | Mist eliminator FLEXICHEVRON | KOCH-GLITSCH ITALIA | 2015 |
| RPLC DEEP CONVERSION PROJECT | HYUNDAI | Metering Pumps | SEKO | 2015 |
| Kusile Power Station | ESKOM | Motorized Isolation ValveI | IMI Orton. | 2015 |
| SAN PEDRO BIOENERGY | ENERGIA Y RECURSOS AMBIENT. INTERNAC. SL | Control Valves | Carraro spa | 2015 |
| ADRAR TOUATGAZ PROJECT | GROUPEMENT TOUATGAZ | PW Drying Beds Feed Pump Skid SD | ECOSERVICE | 2015 |
| EPIC FOR FORWARD MOUNTED BASE | Flowserve Gulf ZE | Control Valves | Flowserve Valbart | 2015 |
| Shenhua Ningxia 4 million t/y Coal-to- Liquids Project | BYPassControl Valve | Parcol spa | 2015 | |
| La Pampilla | REPSOL | Internals For Tray | Baretti Mefe | 2015 |
| Umm Lulu full field development project | ADMA- OPCO | ESDV Valve | LCM spa | 2015 |
| Umm Lulu full field development project | ADMA- OPCO | MOV | LCM spa | 2015 |
| CC-CHP Lichterfelde Konzept | Vattenfall - Nooter Eriksen | Large bore on off valve | Pentair | 2015 |
| Umm Lulu full field development project | ADMA- OPCO | Trunnion Valve | LCM spa | 2014 |
| Umm Lulu full field development project | ADMA- OPCO | Painting monitoring valve | LCM spa | 2014 |
| Atlas coextension project | Air Liquide Global | Piping spool manufacturing | FCM spa | 2014 |
| MGR-08 | REPSOL E&P BOLIVIA | Skid compressor Package | Ingersoll Rend | 2015 |
| Horizon Oil Sands - VDU-DRU-HSU Project | Canadian Natural | Ball trunnion valves side entry | OMB valve | 2014 |
| JAMNAGAR J3 OFFSITES & UTILITIES-MS-CYC751-003 | INGERSOLL RAND INDIA L.T. D | Centrifugal compressor | Ingersoll rend | 2014 |
| EPIC FOR FORWARD MOUNTED BASE | Technip | Control Valves | Flowserve | 2014 |
| Kusile Power Station | ESKOM | Compressed Air Equipment | Ingersoll rend | 2014 |
| Pre Salt | FMC Brazil-Petrobras | Sub Sea Valves 7 1/16" 10000 | Cameron -Ring-O Valve | 2014 |
| SENORO GAS DEVELOPMENT PROJECT | JOB PMTS | FUEL GAS SKID | SiTES s.r.l | 2014 |
| SENORO GAS DEVELOPMENT PROJECT | JOB PMTS | ACID GAS SKID | SiTES s.r.l | 2014 |
| Takreer Carbon Black & Delayed Coker | Takreer | Control Valves | GARO/ Samsung | 2014 |
| Takreer Carbon Black & Delayed Coker | Takreer | GEARBOX | Nuova Pignone / Ocmi OTG | 2014 |
| Takreer Carbon Black & Delayed Coker | Takreer | HC Flare Gas Recovery System Package | 2014 | |
| K098- HYDROGEN PLANT-DAURA RAFINERY | KINETICS TECHNOLOGY SPA | COMBUSTION AIR FAN & FLUE GAS | AEROMECCANICA STRANICH | 2014 |
| SENORO GAS DEVELOPMENT PROJECT | JOB PMTS | ACID GAS SKID | SiTES s.r.l | 2014 |
| Takreer Carbon Black & Delayed Coker | Takreer | Control Valves | GARO/ Samsung | 2014 |
| Takreer Carbon Black & Delayed Coker | Takreer | GEARBOX | Nuova Pignone / Ocmi OTG | 2014 |
| Takreer Carbon Black & Delayed Coker | Takreer | HC Flare Gas Recovery System Package | 2014 | |
| K098- HYDROGEN PLANT-DAURA RAFINERY | KINETICS TECHNOLOGY SPA | COMBUSTION AIR FAN & FLUE GAS | AEROMECCANICA STRANICH | 2014 |
| KUSILE POWER STATION | ESKOM Holding Limited | Butterfly valves 20” | ORTON | 2014 |
| KUSILE POWER STATION | ESKOM Holding Limited | Parallel valves 16” | PENTAIR | 2014 |
| SATAH FULL FIELD DEVELOPMENT PROJECT | ZADCO | ACTUATED BALL VALVE 24” 600 # RTJ | PIBIVIESSE | 2014 |
| SATAH FULL FIELD DEVELOPMENT PROJECT | ZADCO | HIPPS | PIBIVIESSE | 2014 |
| SALOMOND POWER PLANT | ALSTOM | THRUST RUNNER COLLAR | NUGO ROMANO | 2014 |
| KUSILE POWER STATION | ESKOM | CHECK VALVE | PENTAIR | 2014 |
| GATE VALVE | PENTAIR | 2014 | ||
| TEST PRESSURE CAP | PENTAIR | 2014 | ||
| WESTFRANKLIN | TOTAL E&P | BALL VALVE | PETROLVALVES | 2012 |
| ELGIN B | GLOBE VALVE | PETROLVALVES | 2012 | |
| CONTROL VALVES | PETROLVALVES | 2012 | ||
| GATE VALVE | PENTAIR VALVES AND CONTROLS | 2012 | ||
| CHECK VALVE | PENTAIR VALVES AND CONTROLS | 2012 | ||
| PIPE | I IBF | 2012 | ||
| PIPE | SA NDVICK ITALIA | 2012 | ||
| PIPE | COMMERCIALE TUBI ACCIAI | 2012 | ||
| PIPE | T.A. L | 2012 | ||
| LIFE SAVING EQUIPMENT | VIKING | 2012 | ||
| FITTINGS | MEGA SPA - I.RC. SPA – F.M.I SPA | 2012 | ||
| FLANGES | OFFICINE AMBROGIO MELESI - MEGA SPA - I.RC. SPA – F.M.I SPA | 2012 | ||
| LIVING QUARTER CLIPPER | SHELL | VALVE | ||
| Control Valves | BONNYE FORGE - B.F. E | 2013 | ||
| Control Valves | BONNYE FORGE - B.F. E | 2013 | ||
| BALL VALVE | MRC TRANSMARK-BAC | 2013 | ||
| ACTUATED VALVE | PENTAIR VALVES | 2013 | ||
| SAFETY VALVE | TAI MILANO | 2013 | ||
| BALL VALVE | STARLINE | 2013 | ||
| QUICK CONNECTION | ERRE.DI | 2013 | ||
| FLEXIBLE HOSE | ERRE.DI | 2013 | ||
| WASH WATER SKID | ASCO FILTRI | 2013 | ||
| FLANGES | OFF.AMBROGIO MELESI | 2013 | ||
| MARLIN JACKET & TOPSIDE | FOXTROT | VALVE | ||
| ACTUATED VALVES | DRESSER ITALIA | 2013 | ||
| CONTROL VALVES | DRESSER ITALIA | 2013 | ||
| CHOKE VALVE | QUAM SRL | 2013 | ||
| BALL VALVE SPLIT BODY | ZA.VE.RO | 2013 | ||
| CRANE | MEP PELLEGRINI | 2013 | ||
| FITTINGS | PIANA | 2013 | ||
| IKA JZ | INAGIP | VALVE | 2013 | |
| WING VALVE+ACTUATOR | QUAM SRL | 2013 | ||
| LIQUID DISCHARGE VALVE + PANEL | QUAM SRL | 2013 | ||
| BLOW DOWN VALVE | QUAM SRL | 2013 | ||
| CHOKE VALVE | QUAM SRL | 2013 | ||
| NEEDLE VALVE | GUSBERTI | 2013 | ||
| Control Valves | GUSBERTI | 2013 | ||
| PRESSURE SAFETY VALVE | TECHNICAL | 2013 | ||
| CRANE | MEP PELLEGRINI | 2013 | ||
| PRESSURE VESSEL | SIMIC | 2013 | ||
| COLD VENT | I.TA. S | 2013 | ||
| FAUZIA | ENI E&P | SKID | ||
| ELETTRA | ACTIVATED CARBON FILTER | ASCO FILTRI | 2013 | |
| REVAMPING BARBARA | VALVE | 2013 | ||
| Control Valves | AST SPA | 2013 | ||
| SHUT DOWN VALVE + PANEL | QUAM SRL | 2013 | ||
| ACTUATED VALVE | QUAM SRL | 2013 | ||
| CHOKE VALVE | QUAM SRL | 2013 | ||
| PRESSURE VESSEL | BERTOCCHI IMPIANTI | 2013 |