DANIELE BARETTON is a Senior Team Lead, Qualified Inspector, Expeditor and Auditor with inspection experience for major international engineering companies and clients across electrical, instrumental, mechanical and rotating equipment scopes. Since 2000, he has managed inspection and expediting activities as Managing Director and Owner, following earlier assignments as supervisor, expeditor and inspector across European, Middle Eastern, African and South American projects. His expertise includes electrical and instrumentation FAT, hardware and software inspection, configuration and I/O checks, together with mechanical and rotating equipment performance, pressure, cryogenic, hot-temperature, NDT, painting, final, packing and pre-shipment inspections. He served as resident expediter for NUOVO PIGNONE on the Bonney Project in Nigeria and as resident inspector for the TECHNIP-PETROBRAS JV on offshore platforms P51-P52-P56, covering more than 20,000 ball valves. He has also coordinated 20 inspectors and supervised water-treatment plant erection and start-up activities.
Education
- Electronic Diploma “Cavour Institute” Milan
Qualifications and Training
- Introduction to ISO 9000 quality system and relevant normative carried out at ASSOLOMBARDA di Milano
- ISO 9712 – UNI EN 473 II° Level PT
- ISO 9712 – UNI EN 473 II° Level MT
- ISO 9712 – UNI EN 473 II° Level UT
- ISO 9712 – UNI EN 473 II° Level RT
Previous Fulkrum Work Experience
| 2026 | PT. Adidaya Abadi Sentosa | Alfa Standard S.p.A. | Inspection | MV Busduct |
|---|
| 2026 | CARSON INDUSTRIAL TECHNOLOGIES | Cammi srl | Inspection | Air piping |
| 2025 | Friulforgia Srl | Inspection | Forgings |
| 2025 | Draeger Italia S.p.A. | Inspection | Gas detectors |
Work Experience
2000 – Present
VARIOUS CLIENTS
MANAGING DIRECTOR AND OWNER
- Managed inspection and expediting activities for various clients.
- Performed inspection on electrical and instrumental commodities, including FAT, routine electrical and prototype electrical tests, hardware and software inspections, configuration checks, analogical and digital I/O checks, and visual and dimensional examination.
- Performed inspection on mechanical and rotating equipment, including FAT, performance tests, pressure tests, cryogenic and hot-temperature tests, burn-out tests, visual and dimensional examinations, NDT and painting tests, and final, packing and pre-shipment inspections.
1997 – 2000
VARIOUS CLIENTS
EXPEDITOR / INSPECTOR
- Inspected goods across the Italian and European markets, including ESD/BMS, DCS, MCC, HV-LV switchboards, control panels, field and control room instrumentation, UPS, pumps, valves, compressors, pipes, skids, heat exchangers and pressure vessels in general.
- Served as resident expediter at NUOVO PIGNONE in Florence from 1999 to 2000 for mixed refrigerant gas compression trains for the Bonney Project in Nigeria.
1995 – 1997
VARIOUS CLIENTS
SUPERVISOR, EXPEDITOR AND INSPECTOR
- Expedited and inspected DCS components, switchboards and control panels, pumps, skids, gate-globe-check valves, LP-HP compressors, including single- and multi-stage compressors, and turbines.
1994 – 1995
VARIOUS CLIENTS
EXPEDITER, INSPECTOR AND SHIPPING SUPERVISOR
- Expedited and inspected mechanical and electro-instrumental components and materials relevant to the Sabiya Power Station, Pipeline Project, Ras Abu Fontas and Steam Boilers projects.
1993 – 1993
VARIOUS CLIENTS
MECHANICAL AND INSTRUMENT EXPEDITER / INSPECTOR
- Performed mechanical and instrument expediting and inspection for major clients including KELLOGG, SNAMPROGETTI, TPL and ALIMENTA – FIAT Group.
- Inspected valves, pumps, skids and pipes for KELLOGG.
- Inspected bulk materials, fittings, pipes, valves, MV switchboards, UPS, DCS and MCC for SNAMPROGETTI.
- Inspected pipes, valves, rotating machines and instruments for TPL.
- Performed quality, quantity and packing inspection for a vegetable canning plant for ALIMENTA – FIAT Group, with FOOD INT. CO. Rijad as final client.
1990 – 1992
VARIOUS CLIENTS
EXPEDITER / INSPECTOR
- Expedited and inspected bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power cables and instrument cables.
- Performed assignments for the Al Jubail MTBE Complex in Saudi Arabia, Bandar Abbas in Iran, Bu Attifel in Lybia, China Urea Plants and other Italian projects.
1987 – 1990
IONICS/ITALBA Milano
FIELD SUPERVISOR
- Supervised erection and start-up of water treatment and waste recovery system plants.
- Supervised start-up of one ENEL desalination water plant at Livorno with a total capacity of 1,080 m3/day.
- Supervised start-up of four ENEL desalination water plants at Termini Imerese with a total capacity of 4,500 m3/day.
- Supervised start-up of two FIAT desalination water plants at Termini Imerese with a total capacity of 2,160 m3/day.
- Supervised start-up of one ENICHEM waste recover water plant at Manfredonia with a total capacity of 10,800 m3/day.
- Performed laboratory work on new flocculation agents.
⚠ Review: dates overlap with VARIOUS CLIENTS
1987 – 1990
VARIOUS CLIENTS
MECHANICAL AND INSTRUMENTAL EXPEDITER / INSPECTOR
- Performed mechanical and instrumental expediting and inspection with duties as supervisor and coordinator of 20 inspectors for several petrochemical projects and offshore plants on behalf of SNAMPROGETTI and other main International Engineering Companies.
⚠ Review: dates overlap with IONICS/ITALBA Milano
1982 – 1984
VARIOUS CLIENTS
ESTIMATOR FOR ELECTRO-INSTRUMENTAL PLANTS
- Prepared estimates for electro-instrumental plants for ENEL and TELECOM.
1980 – 1982
C.E.I. Compagnia Elettrotecnica Italiana
SUPERVISOR
- Worked as an electrical and instrumental field assistant with supervisory duties at the Ras LA Nuf Refinery in Libia.
- Supervised instrument test calibration, including pneumatic and electric calibration.
- Coordinated and supervised all primary and secondary pipe prefabrication.
Projects
| Year | Main Vendor | Scope Vendor | Scope Type | Material Description |
|---|
| 2026 | PT. Adidaya Abadi Sentosa | Alfa Standard S.p.A. | Inspection | MV Busduct |
| 2026 | CARSON INDUSTRIAL TECHNOLOGIES | Cammi srl | Inspection | Air piping |
| 2025 | Friulforgia Srl | Inspection | Forgings |
| 2025 | Draeger Italia S.p.A. | Inspection | Gas detectors |
1999 – 2000
Bonney Project
Vendor: NUOVO PIGNONE
Product: Mixed refrigerant Gas Compression Trains
Position: Resident expediter
Location: Florence; Nigeria
- Served as resident expediter at NUOVO PIGNONE in Florence for mixed refrigerant gas compression trains for the Bonney Project in Nigeria.
1994 – 1995
Sabiya Power Station
Product: Mechanical and electro-instrumental components / materials
Position: Expediter, Inspector and Shipping Supervisor
Location: Kuwait
- Expedited and inspected mechanical and electro-instrumental components and materials relevant to the Sabiya Power Station project.
1994 – 1995
Pipeline Project
Product: Mechanical and electro-instrumental components / materials
Position: Expediter, Inspector and Shipping Supervisor
Location: Kuwait
- Expedited and inspected mechanical and electro-instrumental components and materials relevant to the Pipeline Project.
1994 – 1995
Ras Abu Fontas
Product: Mechanical and electro-instrumental components / materials
Position: Expediter, Inspector and Shipping Supervisor
Location: Qatar
- Expedited and inspected mechanical and electro-instrumental components and materials relevant to the Ras Abu Fontas project.
1994 – 1995
Steam Boilers
Product: Mechanical and electro-instrumental components / materials
Position: Expediter, Inspector and Shipping Supervisor
Location: Pakistan
- Expedited and inspected mechanical and electro-instrumental components and materials relevant to the Steam Boilers project.
1990 – 1992
Al Jubail MTBE Complex
Product: Bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power and instrument cables
Position: Expediter / Inspector
Location: Saudi Arabia
- Expedited and inspected bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power cables and instrument cables.
1990 – 1992
Bandar Abbas
Product: Bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power and instrument cables
Position: Expediter / Inspector
Location: Iran
- Performed expediting and inspection activities for bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power cables and instrument cables.
1990 – 1992
Bu Attifel
Product: Bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power and instrument cables
Position: Expediter / Inspector
Location: Lybia
- Performed expediting and inspection activities for bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power cables and instrument cables.
1990 – 1992
China Urea Plants
Product: Bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power and instrument cables
Position: Expediter / Inspector
Location: China
- Performed expediting and inspection activities for bulk materials, flanges, valves, HP-LP pumps, carbon-steel and stainless-steel pipes, electrical panels, DCS, MCC, power cables and instrument cables.
1987 – 1990
Client: ENEL
Desalination water plant – Livorno
Vendor: IONICS/ITALBA Milano
Product: Desalination water plant
Position: Field Supervisor
Location: Livorno
- Supervised erection and start-up of one desalination water plant with a total capacity of 1,080 m3/day.
1987 – 1990
Client: ENEL
Desalination water plants – Termini Imerese
Vendor: IONICS/ITALBA Milano
Product: Desalination water plants
Position: Field Supervisor
Location: Termini Imerese
- Supervised erection and start-up of four desalination water plants with a total capacity of 4,500 m3/day.
1987 – 1990
Client: FIAT
Desalination water plants – Termini Imerese
Vendor: IONICS/ITALBA Milano
Product: Desalination water plants
Position: Field Supervisor
Location: Termini Imerese
- Supervised erection and start-up of two desalination water plants with a total capacity of 2,160 m3/day.
1987 – 1990
Client: ENICHEM
Waste recover water plant – Manfredonia
Vendor: IONICS/ITALBA Milano
Product: Waste recover water plant
Position: Field Supervisor
Location: Manfredonia
- Supervised erection and start-up of one waste recover water plant with a total capacity of 10,800 m3/day.
- Performed laboratory work on new flocculation agents.
1987 – 1990
Client: SNAMPROGETTI and other main International Engineering Companies
Petrochemical projects and offshore plants
Product: Mechanical and instrumental equipment
Position: Mechanical and Instrumental Expediter / Inspector
- Performed mechanical and instrumental expediting and inspection.
- Supervised and coordinated 20 inspectors for several petrochemical projects and offshore plants.
Skills
- Team Leadership
- Qualified Inspection
- Third-Party Inspection
- Expediting
- Auditing
- Electrical and Instrumentation Inspection
- Mechanical Equipment Inspection
- Rotating Equipment Inspection
- Electrical Testing
- Hardware and Software Inspection
- Configuration Checks
- NDT Inspection
- Painting Inspection
- Final, Packing and Pre-shipment Inspection
- Inspection Coordination
- Plant Erection and Start-up Supervision
Commodities
- ESD/BMS
- DCS
- MCC
- HV-LV Switchboards
- Control Panels
- Field and Control Room Instrumentation
- UPS
- Pumps
- Valves
- Compressors
- Pipes
- Skids
- Heat Exchangers
- Pressure Vessels
- Turbines
- Bulk Materials
- Flanges
- Fittings
- Power and Instrument Cables
- Electrical Panels
- Transformers
- Electric Motors
- Gears
- Bus Duct
- Electrical Heaters
- Junction Boxes
- Forgings
- Castings
- Mechanical and Instrumentation Components
- Water Treatment Plants
- Waste Recovery Plants