Summary
Mohit Solanki is a Mechanical Engineer with +13 years of experience in the oil and gas sector, specializing in inspection and quality activities across manufacturing and project environments. He has extensive experience inspecting pressure vessels, heat exchangers, structures, fittings, LSAW, HSAW and ERW line pipes, stainless-steel pipes and tubes, valves, castings, bends, coatings and painting systems. His background includes third-party inspection, preparation of WPS, PQR and WOPQ, welding-quality improvement, QA/QC procedures, ITPs, technical documentation, CRS, NCR closure and final dossiers. He has held Senior Manager and Quality Head responsibilities and has supported major clients and organizations including Fluor, Petrofac, PDO, ADNOC, Qatar Energy, Dangote, OQGN and CPECC. He also coordinates client, supplier, auditor and third-party inspection activities.
Education
- 2007 – S.S.C., GSEB, March
- DME, TEB, May-2007 To May-2010
- BE-Mechanical, GTU, June-2014 To July-2017
Qualifications and Training
- CSWIP 3.2.2 (Senior Welding Inspector), Qualified, 05.07.2023 to 20.04.2028
- Ultrasonic Test (UT), Level II, 17.09.2024 to 19.09.2029
- Radiography Test (RT), Level II, 17.09.2024 to 19.09.2029
- Magnetic Particle Test (MPT), Level II, 17.09.2024 to 19.09.2029
- Dye Penetrate Test (DPT), Level II, 17.09.2024 to 19.09.2029
- Eddy current Testing (ECT), Level II, 17.09.2024 to 19.09.2029
Work Experience
May 2025 – Present
FREELANCE (Various clients)
- Inspected pressure vessels, heat exchangers, tanks, castings, valves, line-pipe manufacturing, coating and fittings.
Jun 2024 – May 2025
M/s Venus Pipes & Tubes Ltd
Sr. Manager
- Managed QA and QC activities as Quality Head for the LSAW SS welded plant.
- Monitored and certified plant welding activities.
- Certified WPS, PQR, WOPQ, welding records and data.
- Reviewed and submitted technical comments, ITPs, MPS and other technical documents during enquiry and post-award stages.
- Prepared and implemented QA/QC procedures and inspection test plans according to client technical specifications.
- Provided raw-material technical specifications to procurement and commented on specifications provided by raw-material suppliers.
- Prepared comment resolution sheets during project-document approval.
- Attended kick-off and pre-production meetings and prepared minutes of meetings.
- Coordinated with foreign delegates, clients, third-party inspection agencies and external auditors during plant visits and pre-production meetings.
- Assisted in establishing and maintaining quality norms according to ISO standards and coordinated audit activities.
- Performed internal quality audits for the quality-management system.
- Maintained quality-department records.
- Performed supplier mill audits, raw-material inspection, supplier evaluation, yield analysis, product testing, product release, failure analysis and customer-complaint activities.
- Performed inspection and destructive testing of welds and recommended process, application and equipment-calibration improvements.
- Maintained daily and weekly progress and quality-control reports as part of document control.
Sep 2017 – May 2024
TPI AGENCY
Inspector Third Party Inspection
- Inspected pressure vessels, storage tanks and shell-and-tube heat exchangers.
- Reviewed raw-material test certificates and internal reports for material identification.
- Witnessed in-process material identification for pressure and non-pressure parts.
- Witnessed welder and welding-procedure qualification and endorsement of PTC for mechanical and NDT testing.
- Witnessed dished-end dimensional inspection and NDE.
- Performed category-wise joint fit-up and NDE inspection for A, B, C and D joints.
- Witnessed baffle, skeleton, tube-bundle and tube-parts setup inspections.
- Witnessed tube expansion, tube-to-tube-sheet PT and bolt tightening.
- Witnessed UT, RT, MPI and PT examinations.
- Witnessed pneumatic, hydro, helium leak and cold stretch tests.
- Performed final visual and dimensional inspection.
- Witnessed draining, drying, surface preparation and painting inspection.
- Verified nameplate, CG marking, dew-point temperature, N2 filling and packing slips.
- Witnessed inspection of loose items and equipment spares.
- Reviewed final dossiers and issued IRNs.
- Inspected HSAW, LSAW, ERW and stainless-steel pipes and tubes, DI line pipes, induction bends and stainless-steel welded pipes.
- Reviewed raw materials and inspected ID/OD welding, hydro testing, NDT, physical testing, visual inspection and dimensional inspection.
- Performed random visual inspection of plates and coils.
- Performed plate and coil UT examination of 100% edges and body in accordance with specifications.
- Monitored pipe forming and automatic/manual MIG and SAW welding of LSAW/HSAW pipes.
- Performed random surveillance of internal UT and real-time radiography.
- Witnessed cold expansion and hydro testing of LSAW pipes.
- Witnessed tensile, impact, chemical, micro, macro, DWTT, hardness and all-weld testing for consumables.
- Witnessed sour and NACE service testing including HIC, SSC, IGC and CTOD tests.
- Performed final AUT/MUT examination and radiography of pipes at both ends.
- Performed visual and dimensional inspection, reviewed NDT reports and issued final clearance.
- Inspected bend manufacturing stage-by-stage, including pig testing, NDT, laboratory testing and final VDI.
- Issued non-conformity records and handled them through closure.
- Reviewed final QA/QC dossiers and issued inspection release notes to vendors.
Sep 2010 – May 2014
Man Industries (India) Ltd.
Sr. Engineer
- Worked as Sr. Engineer Plant Incharge and managed shop-floor quality activities during shifts for pipe manufacturing.
- Coordinated with foreign delegates, clients, third-party inspection agencies and external auditors during plant visits and preproduction meetings.
- Performed Hydro test, Burst Test and Cyclic Test as per QAP/ITP and witnessed pressure gauges used for hydrostatic testing with a dead weight tester.
- Handled documentation and implementation for ISO 9001:2000 and certification as per quality-system procedures.
- Liaised with TPI, clients and consultants on quality systems, procedures and project coordination.
- Planned and coordinated inspection and testing equipment, materials and manpower for projects.
- Executed inspection and testing activities with third-party inspection agencies.
- Managed receiving, in-process and final inspection and testing activities.
- Prepared welding procedure specifications and procedure qualifications.
- Applied piping standards including ASTM, ASME SEC. IX, IS and API 5L and other relevant standards for pipe manufacture.
Projects
| Client | Project | Details of work done in the project |
|---|
| M/s LTHE/IOCL | LTK-1 &2 Package for ‘’Ethylene Glycol’’ at Paradip Refinery, Odisha | 10’’ OD to 52’’ OD SS Pipes for General and NACE Service at M/s Ratnamani Metal & Tubes Ltd. |
| M/s Dangote Oil Refining Company Ltd | Dangote Petroleum Refinery & Petrrochemical FZE | 36’’ OD, 52’’OD SS Pipes, SS 304 & SS304L M/s Ratnamani Metal & Tubes Ltd. |
| M/s Isarene Group M/s Petrofac International (UAE) LLC | AIN TSILA Development Project, Algeria. | 18’’OD, 24’’OD, 32’’ OD, 36’’OD, 42’’OD, 48’’OD SS Pipes, SS 304, SS304L, SS316, SS361L General & NACE Service at M/s Ratnamani Metal & Tubes Ltd. |
| M/s Petro Tamin FAHM Company, IRN | FAHM Replacement Project | Inspection of Tubes 19.05 mm OD X 1.65 mm WT, TP316L, 16 mm ODS X 2.30 mm WT TP316L. |
| M/s Dangote Oil Refining Company Ltd | Dangote Petroleum Refinery & Petrrochemical FZE | 36’’ OD, 48’’OD, 52’’OD SS Pipes, SS 304 & SS304L M/s Jindal Saw Ltd. |
| Client | Project | Details of work done in the project |
|---|
| M/s TOTAL | Bend Qualification as per GS EP PLR 226 | 20’’OD X 20.62 mm WT X 5D & 18’’OD X 11.1 mm WT X 5D, API 5L X 65MO PSL2, HIB Bend at M/s Welspun Crop PBM Plant. |
| M/s Carigali-Pttepi Operation Company (CPOC)/ M/s Sapura Offshore Sdn. Bhd. Malaysis | JDA Block-B-17 Development Project | 20’’OD X 22.23 mm WT X 3D & 5D API 5L X 65MS PSL2 HIB Bend at M/s Welspun Crop PBM Plant. |
| M/s GSPL | SWAN FSRU Connectivity Pipeline | 30’’OD & 30’’OD API 5L X 70M PSL2, LR Bend (3D & 5D 6D) at M/s Ratnamani Metal & Tubes Ltd. |
| M/s Mahanagar Gas Ltd | City Gas Distribution Project | 8’’ OD API 5L X 70M PSL2, LR Bend (3D & 5D 6D) Fabrication of Bend and Sleeve coating at M/s Ratnamani Metal & Tubes Ltd. |
| M/s Oil India Ltd | Supply of PRE-Coated Line Pipe and Bends | 6’’ OD & 8’’ OD API 5L X 60M PSL2, Fabrication of Bend and Sleeve coating at M/s Ratnamani Metal & Tubes Ltd. |
| Client | Project | Details of work done in the project |
|---|
| End User: Qatar Energy Customer: Petrofac Qatar W.L.L. | ENGINEERING, PROCUREMENT, INSTALLATION AND COMMISSIONING (EPIC) OF EARLY WORKS FOR WWTP UPGRADE | Stage Inspection of Groth Pressure Vacuum Relief Valve @ GROTH CONTINENTAL MANUFACTURING PRIVATE LIMITED |
| M/s Andritz Hydro Pvt Ltd | Moyar PH & Anrland-HPP | Inspection of Jet Deflector Casting, Runner Blade at M/s Atul Pricision Cast Ltd-Rajkot. |
| M/s ADMA / M/s Technip France Abu Dhabi | Additional Gas supply to onshore and Flexibility Assurance at USSC | Dual Plate check valve at M/s Intrux Techno casting Pvt.Ltd |
| M/s Virgo Valve & Controls Pvt Ltd. Pune. | ----- | Inspection of Pouring witnessed, Lab Testing, Visual & Final Dimensional for Material WCB, CF8, and CF8M. |
| M/s Proman, Germany / M/s VAK & Press Engineering | ----- | Inspection of Poring witnessed , Lab Testing, Final nd Visual Dimension for Ball Valve- F304L (Body & Ball) at M/s G.M Valve Pvt Ltd-Rajkot. |
| M/s Petro Valve/ M/s Corrtech International | Steel pipeline construction and associated work for NBPL | Inspection of Ball valve for Body, side pic, steam, Pup piece at M/s Gujarat Intrux Pvt .Ltd-Rajkot. |
| M/s Hawa Valves | Sabarmati gas line | Casting Ball valve,Butter fly valve of body, bonnet and Plate for gas line at M/s Iceburge Technocast Pvt Ltd. |
| M/s Elbit System ISRAEL Aerospace | ISRAEL vapoun | ISRAEL vapoun casting body, bonnet, Flange at M/s Hi-Tech Investment casting Pvt. Ltd. |
Skills
- Welding Inspection
- Third-Party Inspection
- QA/QC Management
- WPS / PQR / WOPQ Preparation
- Pressure Equipment Inspection
- Piping and Structure Fabrication Inspection
- Line Pipe Inspection
- Stainless-Steel Pipe and Tube Inspection
- Casting and Valve Inspection
- Coating / Painting Inspection
- Supplier and Raw Material Inspection
- Quality Documentation and Dossier Review
- NCR and CRS Management
- Client and Certification Audits
- Welder Qualification
- Quality System Implementation
Commodities
- Pressure Vessels
- Heat Exchangers
- Storage Tanks
- Dump Tanks
- Piping
- Structures
- Modules
- LSAW Line Pipes
- HSAW Line Pipes
- ERW Line Pipes
- Stainless-Steel Pipes and Tubes
- Fittings
- Induction Bends
- Long Radius Bends
- Valves
- Castings
- Boilers
- Cryogenic Vessels
- Skids
- Coating Material
- Painting Systems