Andy Thomas
SUMMARY
Andy Thomas is an experienced professional with over twenty-three years of experience in construction environments, both inland and offshore. They currently serve as a Supervisor/NACE 2 Inspector, demonstrating a strong blend of practical experience, knowledge, and skills gained through various job duties. They are dedicated, ambitious, and motivated, consistently working effectively in team settings. Their expertise includes supervision, coating inspection, and project management in complex industrial settings.
education
- Sangre Grande Junior Secondary
- North Eastern College
- CXC O'Levels General Proficiency: Technical Drawing, Metals, Electricity & Electronics
QUALIFICATIONs AND TRAINING
- Irata Rope Access Technician- Level I Certified (Certificate No: 1/68737)
- NACE Coating Inspector – Level II Certified (Certificate No: 45029)
- Basic Scaffold Inspection – Safety & Access Limited (Certificate No: 17478)
- Quality Control Management (Issuing Body: Synergy Training Institute)
- Construction Project Management (Issuing Body: Synergy Training Institute)
- Conflict Resolution (Issuing Body: Synergy Training Institute)
- International Business Management (Issuing Body: Synergy Training Institute)
- Project Management (Issuing Body: London International College, Certificate No: LIC108636UK)
- H2S Awareness (Issuing Body: Falck Nutec Limited, Certificate No: 3982679)
- NSL Rigging and Lifting Refresher (Certificate No: G19529/22)
- Risk Management and Safe Systems of Work (SSOW) (Issuing Body: Repsol YPF, Role: Performing Authority)
- BPTT Control of Work Standard (Issuing Body: Ecow, Training Type: Performing Authority Training, Date: 15.11.2017)
- Bolt Tensioning and Bolt Torquing Training (Issuing Body: HydraTight Limited, Date: 17.03.13)
- Basic Scaffold Part 1 (Issuing Body: Worldwide Safety Consultants Limited (WSCL))
- DENSO TAPING TRAINING COURSE (Certificate for Denso Mastic application)
- BpTT Golden Safety Rules EMS Training Certificate (Issuing Body: BPTT)
- Ecow Permit to Work (Issuing Body: BPTT)
- Energy Isolation (Issuing Body: BPTT)
- Lifting (Issuing Body: BPTT)
- Vehicle Safety (Issuing Body: BPTT)
- Banks's man / Slingers Theory Practical assessment (Issuing Body: Falck Nutec Caledonian Safety Trinidad Ltd.)
- Combined Skills for Supervisors CBS-06-0010 (Issuing Body: RGIT Montrose)
- Computer Based Course in Authorized Gas Testing (Issuing Body: RGIT Montrose, OPITO Certified)
- Attaining a pass mark of 99% (Issuing Body: RGIT Montrose)
- Stop - Train (Issuing Body: RGIT Montrose)
- Confined Space Training (Details: Making a Safe Entry using S.C.B.A., Air Quality Testing, Hazards Relating to Confined Space, Control Procedures, Emergency Procedures)
- Authorized Gas Tester Training (OPITO Certified)
- Fastorq Bolting Systems (Details: Guidelines for bolting application)
- Klinger Gasket Training (Details: Guidelines for installing care of gasket)
- Safety Leadership Training
- Safety Harness Inspection (Issuing Body: Cape Industrial Services Limited)
- Du Pont STOP Training
Work experience
Oct 2024 – Present
VARIOUS CLIENTS
Supervisor/Coating Inspector Nace 2.
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Jan 2024 – Oct 2024
VARIOUS CLIENTS
Coating Inspector Nace 2.
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Mar 2023 – Oct 2023
MONAR LIMITED
Coating Inspector Nace 2.
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Dec 2021 – Feb 2023
EPIC MAINTAINCE LITIMED
Coating Inspector Nace 2.
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Sep 2020 – Nov 2021
VARIOUS CLIENTS
Client Site Rep.
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Jan 2018 – Aug 2020
HYDRO TECH LIMITED
SUPERINTENDENT
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Aug 2017 – Jan 2018
VARIOUS CLIENTS
SUPERINTENDENT
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Jul 2016 – Aug 2017
VARIOUS CLIENTS
SUPERINTENDENT
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Jan 2011 – Jun 2016
CARILLION (Caribbean Limited)
SUPERINTENDENT
- Prepared crews for work
- Executed work permits and JSA permit procedures
- Managed rigging installation procedures
- Oversaw fabrication procedures
- Conducted painting and inspection tasks
- Prepared work packs and ensured job execution
Jan 2000 – Dec 2010
Carl King Company Ltd
FOREMAN/Supervisor
- Performed Samaan A Platform Repairs
- Completed Immortelle Thunder Foot Repair
- Managed Kapok Platform insulation and commissioning fabrication & installation of flow line
- Executed Cannon Ball insulation and commissioning
- Served as Immortelle - T.A.R. Foreman
- Supervised BPTT Mahogany Bravo TAR projects
- Oversaw BPTT Mango Platform Commissioning fabrication & installation of flow line
- Supervised BPTT Beach Field Upgrade
- Supervised BPTT Cassia A 30” Riser split tee installation and top side valve change out
- Supervised BPTT Cassia A Slub Valve Installation and Removal in 2010
- Supervised BPTT Cassia A Boat Guard Removal in 2010
- Supervised BHP piping fabrication and installation offshore
Jan 2002 – Dec 2002
VARIOUS CLIENTS
Operator
- Operated Bob Cat
- Operated Man Lift
- Received Crane operator training
Jan 1999 – Dec 2001
Transocean Sedcoforex Rig #3
Roustabout, Painter
Jan 1998 – Dec 1999
TARMAC CONSTRUCTION LTD
Rigger, Scaffold Builder, Operator, Painter
Projects
Oct 2024 – Present
SBM
SBM Guyana FPSO
Jan 2024 – Oct 2024
OCELOT 7" Pipe Upgrade
Mar 2023 – Oct 2023
Methanex
Methanex Upgrade
Dec 2021 – Jul 2022
16'NGC Line Repair Project
Aug 2022 – Feb 2023
PPGPL
PPGPL Project
Oct 2021 – Nov 2021
Poui 24’NGC Line Repair Project
Sep 2020 – Feb 2021
BHP
Ruby Project
Jan 2018 – Aug 2018
GEP Bethel Project
Sep 2018 – Oct 2018
EOG
Banyan FM/Mechanical Upgrade
Nov 2018 – Dec 2019
Cassia A TAR Project
Dec 2019 – Jan 2020
Perenco
Teck A Project
Feb 2020 – Aug 2020
Cassia B TAR Project
Aug 2017 – Jan 2018
Cannonball Restart and Upgrade
Sep 2016 – Aug 2017
Mahogany Bravo TAP Accommodation Project
Jul 2016 – Sep 2016
Mahogany Bravo TAR Project
Mar 2016 – Jun 2016
BG
Dolphin + 15 Painting Project, Rope access
Jun 2015 – Mar 2016
Atlantic
Atlantic Train 4 Upgrade
Dec 2014 – May 2015
BG
Poinsettia + 15 Painting Project, Rope access
Aug 2013 – Mar 2014
Pelican Painting Project, Rope access
Jun 2013 – Aug 2013
Amherstia Rig Readiness Project
Aug 2012 – Dec 2012
Repsol
Poui Alpha Generators Upgrade Project
Mar 2012 – Jun 2012
Repsol
Teak Bravo & Delta Critical Piping Repairs Project
Jan 2011 – Dec 2011
Repsol
Samaan Bravo Helideck Upgrade Project
Jan 2010 – Dec 2010
BPTT
Cassia A Slub Valve Installation and Removal
Jan 2010 – Dec 2010
BPTT
Cassia A Boat Guard Removal
Skills
- Rope Access (IRATA Level I)
- NACE Coating Inspection (Level II)
- Basic Scaffold Inspection
- Quality Control Management
- Construction Project Management
- Conflict Resolution
- International Business Management
- Project Management
- H2S Awareness
- Rigging and Lifting
- Risk Management
- Safe Systems of Work (SSOW)
- Control of Work (CoW)
- Permit to Work
- Bolt Tensioning
- Bolt Torquing
- Denso Taping
- Energy Isolation
- Lifting Operations
- Vehicle Safety
- Banks's man / Slingers
- Supervision
- Authorized Gas Testing (OPITO Certified)
- Confined Space Entry
- Air Quality Testing
- SCBA (Self-Contained Breathing Apparatus)
- Bolting Application (Fastorq)
- Gasket Installation (Klinger)
- Safety Leadership
- Safety Harness Inspection
- Du Pont STOP Training
- Client Site Representation
- Construction
- Roustabout Duties
- Painting
- Scaffold Building
- Bob Cat Operation
- Man Lift Operation
- Crane Operation
- Work Permit Procedures
- JSA Procedures
- Fabrication
- Work Pack Preparation
- Job Execution
- Platform Repairs
- Insulation
- Commissioning
- Flow Line Installation
- Riser Installation
- Valve Change-out
- Piping Fabrication