Alan T. Luce is a highly experienced QA/QC professional with 36 years of experience in the energy industry. They specialize in the evaluation of engineered equipment, ensuring compliance with approved drawings, welding procedures, and applicable codes and specifications. Their expertise encompasses ASME pressure vessels, rotating equipment, fabricated pressure piping, and modular process plants. They possess extensive knowledge of ASME, API, AWS, NACE, and ANSI standards, along with a strong background in welding and NDT methods (MT, PT, UT, RT, VT). Alan T. Luce holds current AWS-CWI, API SIFE, and API SIRE certifications, demonstrating their comprehensive capabilities in shop and field environments for both new and used equipment.
Year | Main Vendor | Scope Vendor | Scope Type | Material Description |
2026 | Best Pump Works Tyler | Best Pump Works Tyler | Inspection | Pump & Baseplate |
2026 | Solar Turbines International Co. | Lufkin Gears LLC | Inspection | Gearbox |
2026 | Flowserve - Sulphur Springs | Flowserve - Sulphur Springs | Inspection | 10" Plug Valve |
2026 | Flowserve - Sulphur Springs | Flowserve - Sulphur Springs | Inspection | Plug Valve |
2025 | Lufkin Gears LLC | Lufkin Gears LLC | Inspection | Spare Gearset and Main Unit |
2024 | Winston/Royal Guard Corporation | Winston/Royal Guard Corporation | Inspection | flanges, buttwelds, vessels |
2024 | Elliott Company | Lufkin Gears LLC | Inspection | BOG Compressors |
2024 | Elliott Company | Lufkin Gears LLC | Inspection | Compressors, Pump |
2024 | Winston/Royal Guard Corporation | Winston/Royal Guard Corporation | Inspection | Cooler |
2024 | Halliburton - Longview Texas | Halliburton - Longview Texas | Inspection | Supply of 5-Line Multi-Zone Hydraulic Well Control |
2024 | Lufkin Gears LLC | Lufkin Gears LLC | Expediting | Gear Box |
2024 | H. Lorimer Corporation | H. Lorimer Corporation | Inspection | 5-Line Multi-Zone Hydraulic Well Control Panel |
2023 | Flowserve - Sulphur Springs | Flowserve - Sulphur Springs | Inspection | 12IN, 150# plug valve |
2023 | Sabre Industries | Sabre Industries | Inspection | Welding Inspection |
2023 | Qualico Steel Company Inc. | Qualico Steel Company Inc. | Inspection | Columns, Beams, Braces etc. |
2023 | Assmann Southwest | Assmann Southwest | Inspection | Acid Tank |
2023 | Lufkin | Lufkin | Inspection | LOAD GEAR ORDERING SHEET (LUFKIN GEARS) |
2022 | KMI Fabricators | KMI Fabricators | Inspection | DCO UNLOADING FILTER |
2022 | North Texas Pressure Vessels | North Texas Pressure Vessels | Inspection | RDU Pretreatment Coalescer |
2022 | Vessel Technology | Vessel Technology | Inspection | Test Plate |
2022 | Central Texas Iron Works (Waco) | Central Texas Iron Works (Waco) | Inspection | Structural Units |
2022 | AFGLOBAL Corporation | AFGLOBAL Corporation | Inspection | Flanges 6% Moly |
2021 | Lufkin | Lufkin | Inspection | rotating equipment |
2021 | SPX Flow | SPX Flow | Inspection | QM 37 |
2021 | Fibrebond Corporation | Fibrebond Corporation | Inspection | modular unit substation |
2021 | Moore Industries | Moore Industries | Inspection | modular unit substation |
2020 | DXP Industries / Pump Works | DXP Industries / Pump Works | Inspection | (3) pumps with motors |
2020 | DXP Industries / Pump Works | DXP Industries / Pump Works | Inspection | (3) pumps with motors |
2020 | DXP Industries / Pump Works | DXP Industries / Pump Works | Inspection | (3) pumps with motors |
Jan 2000 – Present
VARIOUS CLIENTS
Quality Assurance Representative / Contract Vendor Surveillance/Inspector
Jan 1989 – Dec 2000
Amercool Manufacturing Inc
Quality Control Manager
Jan 1987 – Dec 1989
Brown & Root Texas Eastman Plant
First Class Pipe Welder and Fitter
Jan 1980 – Dec 1987
Delhi Gas Pipeline Corp.
First Class Pipe Welder and Fitter
Jan 1979 – Dec 1980
Howe Baker Engineers
Welder
Jan 2026 – Jan 2026
Enbridge
Steel Forgings – Pipe Fittings
Steel Forgings
Nov 2025 – Nov 2025
Flint Hills
DXP Pumpworks API 610 Pump Testing
DXP Pumpworks
Oct 2025 – Oct 2025
Reset Energy
Gallop Fabrication
Gallop Fabrication
Sept 2025 – Sept 2025
Reset Energy
Gulf Coast Exchangers
Gulf Coast Exchangers
Sept 2025 – Sept 2025
Bazan
Pumpworks 610 – Boiler Feed Water Pumps
Pumpworks 610
Aug 2025 – Aug 2025
Chevron
JE Power - Compressor Package
JE Power
Jul 2025 – Jul 2025
Burns-Mc
VTEC - Pressure Vessels
VTEC
Jun 2025 – Jun 2025
XTO
Epic Industrial – Electric Module LLE Building Insp.
Epic Industrial
Jun 2025 – Jun 2025
Wood
Navis Pack & Ship – Crating Inspection.
Navis Pack & Ship
May 2025 – May 2025
MHI
API 613 Gear Box Mechanical Run Test Witness.
Lufkin Gear
May 2025 – May 2025
Wood
API 613 Gear Box Mechanical Run Test Witness.
Lufkin Gear
May 2025 – May 2025
Energy Transfer
QTC – Long Industries - Double Wall Tank.
Long Industries
Apr 2025 – Apr 2025
ONGC Ltd. Mumbai
Solar Turbines – Console Testing FAT.
Solar Turbines
Feb 2025 – Feb 2025
Schlumberger
Pumpworks 610/Centrifugal Pump
Pumpworks 610
Sept 2024 – Apr 2025
XTO
Saulsbury - Pipe Spools/Modules Inspection
Saulsbury
Aug 2024 – Aug 2024
Arion - Oxy
Saulsbury - Copper Sulfate Testing
Saulsbury
Jun 2024 – Jun 2024
Halliburton
Lorimer Corp. - Testing of Well Control Modules
Lorimer Corp.
Apr 2024 – Apr 2024
ExxonMobil
API 610 Pump – FAT – Pumpworks 610
Pumpworks 610
Mar 2024 – Mar 2024
ExxonMobil
Attemperator Replacement – Turner Ind.
Turner Ind.
Feb 2024 – Feb 2024
Sempra
Port Author LNG Project -Gear Boxes-Lufkin Gears
Lufkin Gears
Jan 2024 – Jan 2024
ExxonMobil
Strainer – Winston Royal Guard
Winston Royal Guard
Dec 2023 – Dec 2023
IAC
Bio Mass Rotary Dryer - WPS
WPS
Nov 2023 – Nov 2023
Arion
Chemical Tank – Baker Tank
Baker Tank
Nov 2023 – Nov 2023
Air Products
Assmann Inc. - Polyethylene Acid Tanks
Assmann Inc.
Oct 2023 – Oct 2023
Seatrium
Petrobras - API 613 Gear Box - Lufkin Gears
Lufkin Gears
Oct 2023 – Oct 2023
Reset Energy
Heat Exchanger - Tranter
Tranter
Oct 2023 – Oct 2023
Midrex
Pressure Vessels
Sept 2023 – Sept 2023
Keiwit
Generator Buildings – Sabre
Sabre
Jul 2023 – Jul 2023
Midrex
RVS – Pressure Vessels
Jul 2023 – Jul 2023
Midrex
Pressure Vessels - White Oak Process
White Oak Process
Jun 2023 – Jun 2023
Energy Transfer
Meter Tube - LTD Fab
LTD Fab
May 2023 – May 2023
Reset Energy
Hudson Products
Hudson Products
Feb 2023 – Feb 2023
YPF Argentina
Wellhead Equipment - StreamFlo
StreamFlo
Jan 2023 – Jan 2023
Enbridge
Steel Forgings
Steel Forgings
Jan 2023 – Jan 2023
Kinder Morgan
Filter Separators – King Tool
King Tool
Jan 2023 – Jan 2023
Reset Energy
ASME Pressure Vessels - Gallop Fabrication
Gallop Fabrication
Jan 2023 – Jan 2023
Reset Energy
ASME Pressure Vessels – Wm Grant.
Wm Grant
Nov 2022 – Nov 2022
Burrows
API 653 Tank – Baker Tank
Baker Tank
Sept 2022 – Sept 2022
Audubon
Compressor Skids – Prestige Compressor
Prestige Compressor
Jul 2022 – Jul 2022
Chevron
Skid package - Energy Weld Fab
Energy Weld Fab
Jul 2022 – Jul 2022
Enbridge
Pressure Vessel - Baker Tanks
Baker Tanks
Jul 2022 – Jul 2022
Chemours
Gear Box Testing – Lufkin Gears
Lufkin Gears
Jul 2022 – Jul 2022
New York Power Authority
Power Poles - Sabre Industries
Sabre Industries
Jun 2022 – Jun 2022
KBR
Galvanized Steel - AZZ Galvanizing
AZZ Galvanizing
May 2022 – May 2022
Kentz -Aramco- Ameriforge
Alloy Flanges
Ameriforge
May 2022 – May 2022
HDEC – Emerson
Relief Valves
Emerson
May 2022 – May 2022
S&B Engineers
Structural Steel Central Texas Iron Works
Central Texas Iron Works
Apr 2022 – Apr 2022
Reset Energy
API RP11S2 Pump Testing - Baker Hughes
Baker Hughes
Feb 2022 – Feb 2022
Reset Energy
ASME Vessels - William Grant Vessels
William Grant Vessels
Jan 2022 – Jan 2022
SBM (Single Buoy Mooring)
Pump Skids – VME Process
VME Process
Jan 2022 – Jan 2022
Petrojet
API 610 Pump – Pumpworks 610
Pumpworks 610
Jan 2022 – Jan 2022
EURTRUE S.R.L.
Shell &Tube Exchanger - Delta Tee
Delta Tee
Jan 2022 – Jan 2022
Chevron
Metering Skid Inspection – Energy WeldFab
Energy WeldFab
Jan 2022 – Jan 2022
Enbridge
Valve Testing – Flowserve
Flowserve
Dec 2021 – Dec 2021
Technip/ANOPC
Gear Box – Lufkin Gears
Lufkin Gears
Dec 2021 – Dec 2021
ANR Pipeline
Blowdown Silencers – VENEC
VENEC
Nov 2021 – Nov 2021
Enbridge
Line Pipe - A&A Coating
A&A Coating
Oct 2021 – Oct 2021
Enbridge
Fittings – Steel Forgings
Steel Forgings
Sept 2021 – Sept 2021
Air Power
Pressure Vessels – VTECH
VTECH
Aug 2021 – Aug 2021
Burns & McDonnel
MCC Buildings - Fibrebond
Fibrebond
Jul 2021 – Jul 2021
ENPPI
Surge Relief Valve – SPX
SPX
Jul 2021 – Jul 2021
Burns & McDonnel
Pressure Vessels – VTech
VTech
Jul 2021 – Jul 2021
Boardwalk Pipeline
Meter Tube - Pipeline Equipment Inc.
Pipeline Equipment Inc.
Jun 2021 – Jun 2021
KILO Global
API 610 Pump - Pumpworks
Pumpworks
May 2021 – May 2021
Holly Frontier
Pressure Vessels - Wm. Grant
Wm. Grant
May 2021 – May 2021
ATCO
Gear Box - Lufkin Gears
Lufkin Gears
Apr 2021 – Apr 2021
Conoco Alaska
Skid Package - Air Power
Air Power
Mar 2021 – Mar 2021
Lubrizol
SS Vessel - Wm Grant
Wm Grant
Jan 2021 – Jan 2021
McDermott
Gear Box - Lufkin Industries
Lufkin Industries
Jan 2021 – Jan 2021
Boardwalk
30" 6D Pipe Bends - Turner Industries
Turner Industries
Nov 2020 – Nov 2020
Aramco
Gear Box - Philadelphia Gear
Philadelphia Gear
Sept 2020 – Sept 2020
Pluspetrol
Pump Skid Package - DXP
DXP
Aug 2020 – Aug 2020
UPI
ASME Pressure Vessels – King Tool
King Tool
Jun 2020 – Jun 2020
Oxy
ASME Pressure Vessels - James Machine
James Machine
May 2020 – May 2020
Aramco
API 613 Gear Box - Philadelphia Gear
Philadelphia Gear
Apr 2020 – Apr 2020
Wood
API 653 Tank - James Machine
James Machine
Mar 2020 – Mar 2020
Technocrat
US Bellows
US Bellows
Mar 2020 – Mar 2020
ADNOC
UOP Plant
UOP
Mar 2020 – Mar 2020
Conoco
Separator - Energy Weldfab
Energy Weldfab
Mar 2020 – Mar 2020
Oxy
Condenser - Delta Tee
Delta Tee
Mar 2020 – Mar 2020
Worley
Electric Motors – Komatsu
Komatsu
Feb 2020 – Feb 2020
Technip/Shell
Sample Probes - Sandelius Company
Sandelius Company
Feb 2020 – Feb 2020
Burns & McDonnel
API 610 Pumps
Jan 2020 – Jan 2020
Rubicon
Seal Pot Vessel - Industry Services Co. Inc.
Industry Services Co. Inc.
Dec 2019 – Dec 2019
PCC
Oxidizer - WPS Industries
WPS Industries
Nov 2019 – Nov 2019
Energy Transfer
Ultrasonic Meter Tube - LTD
LTD
Oct 2019 – Oct 2019
Oil Search (Alaska) LLC
Bridge Bearings - D.S. Brown
D.S. Brown
Oct 2019 – Oct 2019
Chevron
Valves - Flowserve
Flowserve
Sept 2019 – Sept 2019
Polaris
API 650 Tanks - ML Smith
ML Smith
Aug 2019 – Aug 2019
Sinclair
North Texas Pressure Vessel
North Texas Pressure Vessel
Aug 2019 – Aug 2019
ExxonMobil
API 610 Pump Testing - Pumpworks 610
Pumpworks 610
Jul 2019 – Jul 2019
Wood
Fibrebond - ABB - Switch Gear Modules
Fibrebond
Jun 2019 – Jun 2019
Worley Parsons
Gear Boxes – Lufkin Industries
Lufkin Industries
Jun 2019 – Jun 2019
Red Rock
Biomass Fuel Plant Modules – PPE
PPE
May 2019 – May 2019
Azota
Pressure Vessels – Wm. Grant
Wm. Grant
May 2019 – May 2019
Wood Group
Control Room Modules - Fibrebond
Fibrebond
Apr 2019 – Apr 2019
Chevron
Compressor Package - JW Power
JW Power
Mar 2019 – Mar 2019
SQS UK
Alloy 650 Flanges – MAASS Flange
MAASS Flange
Mar 2019 – Mar 2019
Saulsbury
Structural Steel
Mar 2019 – Mar 2019
CTJ Energy
Pressure Vessels - Chelan Public Utility
Chelan Public Utility
Mar 2019 – Mar 2019
Tranter
Wichita Falls, Tx. Plate Superchanger - Wood-Anadarko
Wood-Anadarko
Mar 2019 – Mar 2019
Lufkin Gear
Lufkin, Tx. – API 613 Gear Box Testing - MODEC
MODEC
Feb 2019 – Feb 2019
BestPumpworks
Tyler, Texas – API-610 Pump Testing - ADNOC
ADNOC
Feb 2019 – Feb 2019
StreamFlow
Kilgore, Tx. - API 6A Valves - Enbridge
Enbridge
Jan 2019 – Jan 2019
Fibrebond
Minden, La. - Control Room Modules – Gulf Interstate Engineering
Gulf Interstate Engineering
Dec 2018 – Dec 2018
Cameron Valve & Measurement
Aramco Services
Aramco Services
Dec 2018 – Dec 2018
Module X Solutions
Shreveport, La. - Control Rooms - Praxair
Praxair
Nov 2018 – Nov 2018
Wm. Grant
Henderson, Tx. - Coalescer Vessels - Linde
Linde
Nov 2018 – Nov 2018
Baker Tank
Arp, Tx. – Storage Tanks - Total
Total
Nov 2018 – Nov 2018
Integrated Flow Solutions
Tyler, Tx. – Ammonia Skid Package - Total
Total
Oct 2018 – Oct 2018
Best Pumpworks
Tyler, Texas – Pump Remanufacture - ADNOC
ADNOC
Oct 2018 – Oct 2018
Best Pumpworks
Tyler, Texas – Pump Remanufacture - Tetra
Tetra
Oct 2018 – Oct 2018
CTIW
Waco, Tx. – Structural Steel for Sinclair Oil Co. Wyoming.
Sinclair Oil Co. Wyoming
Oct 2018 – Oct 2018
Steel Fab of Monroe
Monroe, La. Structural Steel - Exxon
Exxon
Sept 2018 – Sept 2018
James Machine Works
Monroe, La. – API 620 Tank - Oxy
Oxy
Aug 2018 – Aug 2018
KP Engineering
Pressure Vessels – Praxair - Wm. Grant
Praxair
Aug 2018 – Aug 2018
ExxonMobil
Steel Fabricators of Monroe – Monroe, La.
Steel Fabricators of Monroe
Aug 2018 – Aug 2018
KP Engineering
Pressure Vessels - VTech
VTech
Aug 2018 – Aug 2018
Pembina
Railserve - Locomotive build inspection.
Railserve
Jul 2018 – Jul 2018
THERMAX
API 610 Pumps - Pumpworks 610
Pumpworks 610
Jul 2018 – Jul 2018
ENEL
SCADA Building - Sabre Ind.
Sabre Ind.
Jun 2018 – Jun 2018
Gulf South
Storage Tank – Baker Tank
Baker Tank
Jun 2018 – Jun 2018
Pembina
API 610 Pumps – Pumpworks 610
Pumpworks 610
Jun 2018 – Jun 2018
Wood
Skid Packages – IFS
IFS
Feb 2018 – Feb 2018
SNC Lavalin
Valerus Sealy, Tx. Saudi Arabian Kentz – Aramco Compressor Packages
Aramco
Feb 2018 – Feb 2018
DeNora Water Technologies
DeNora Water Technologies
Jan 2018 – Jan 2018
Aramco
Forum Valve
Forum Valve
Jan 2018 – Jan 2018
Aramco
Fiberspar – RTR Flexible Pipe – API 15S
Fiberspar
Nov 2017 – Nov 2017
HENC
ITT Goulds
ITT Goulds
Nov 2017 – Nov 2017
Petrofac
Amarillo Gear
Amarillo Gear
Oct 2017 – Oct 2017
Wood Group
BP Mad Dog 2 - Gear Boxes – Lufkin Gear
Lufkin Gear
Sept 2017 – Sept 2017
Delta Gulf
Emerson Process/Houston - Motorized Actuator Testing
Emerson Process
Sept 2017 – Sept 2017
ARKAD
Bray - Butterfly Valves
Bray
Sept 2017 – Sept 2017
Boardwalk Pipeline
Flowserve -Valves
Flowserve
Aug 2017 – Aug 2017
Sinclair Refining
Pressure Vessels – KMI Fab
KMI Fab
Aug 2017 – Aug 2017
Flowserve
F91 Valves - SEPCO
SEPCO
Jul 2017 – Jul 2017
Petrofac
Zeeco - Flare System
Zeeco
Jul 2017 – Jul 2017
Sinclair
Structural Steel – CMC/CTIW
CMC/CTIW
Jun 2017 – Jun 2017
KOC
Bronze HVAC Valves – Nibco
Nibco
Jun 2017 – Jun 2017
Petrofac-Southeast Controls
Sulfur Seals
May 2017 – May 2017
Chelan County
CTJ – Pressure Vessels
CTJ
Apr 2017 – Apr 2017
Air Products
Fisher Valves
Fisher Valves
Mar 2017 – Mar 2017
Petrofac
Cameron Valve
Cameron Valve
Feb 2017 – Feb 2017
SKEC
Aramco - Skid Package - PWC
Aramco
Jan 2017 – Jan 2017
Saipem
Aramco - Surge Relief Valves – SPX
Aramco
Dec 2016 – Dec 2016
Saipem
Aramco - Surge Relief Valves – SPX
Aramco
Nov 2016 – Nov 2016
GL
API 614 Pump Testing Witness - Best Pumpworks
Best Pumpworks
Oct 2016 – Oct 2016
Oxy Vinyls
API 653 Tank Inspection - James Machine
James Machine
Sept 2016 – Sept 2016
Lubrizol
Various Tank & Vessel Inspection – Wm. Grant
Wm. Grant
Aug 2016 – Aug 2016
Aramco
Anti Surge Valve Inspection – Fisher
Fisher
Aug 2016 – Aug 2016
Aramco
Lube Oil System Inspection – Elliott
Elliott
Jul 2016 – Jul 2016
Aramco
Caterpillar - Gen Set Factory Acceptance Test Witness
Caterpillar
Jun 2016 – Jun 2016
SOFEC
HENC/Aramco - Fluid Swivel Testing
Aramco
Jun 2016 – Jun 2016
WESTECH
Aramco - Oily Water Separator Package
Aramco
May 2016 – May 2016
Denora
Electrolyser Package - Aramco
Aramco
Apr 2016 – Apr 2016
Matrix
VME Process – 22 Meter Skids
VME Process
Apr 2016 – Apr 2016
Lubrizol
Tanks & Vessels LLC
Tanks & Vessels LLC
Mar 2016 – Mar 2016
Scelerin
Vector - Ammonia Skid
Vector
Feb 2016 – Feb 2016
Aramco
Flowserve Valves
Flowserve
Jan 2016 – Jan 2016
Eram/Target
Cameron Valves
Cameron Valves
Oct 2015 – Oct 2015
Mustang
Steel Fab of Monroe – Structural Steel
Steel Fab of Monroe
Oct 2015 – Oct 2015
Lubrizol
ASME Vessels - Wm. Grant
Wm. Grant
Oct 2015 – Oct 2015
Eram
SPX Surge Relief Valves
SPX
Oct 2015 – Oct 2015
Aramco
CB&I APP – Fittings
CB&I APP
Sept 2015 – Sept 2015
GCC/Aramco
Forum Valves
Forum Valves
Aug 2015 – Aug 2015
Cameron Valves
Cameron Valves
Aramco
Aug 2015 – Aug 2015
SPX
Eram
Eram
Aug 2015 – Aug 2015
JGC
Corrotherm – Alloy Piping Inspection
Corrotherm
Aug 2015 – Aug 2015
Mustang
Long Industries – Tanks
Long Industries
Aug 2015 – Aug 2015
Lufkin Industries
Lufkin Industries
Aramco
Jul 2015 – Jul 2015
PBV Valves
PBV Valves
Aramco - BIC
Jun 2015 – Jun 2015
Burns & McDonnell
Texas Vessel – Monitoring CB&I inspector
CB&I
Mar 2015 – Mar 2015
Mustang Engineering
King Tool – Filter/Separators
King Tool
Mar 2015 – Mar 2015
PBV Valves
PBV Valves
CAT-Aramco
Feb 2015 – Feb 2015
GCC
WeldFit
WeldFit
Feb 2015 – Feb 2015
Essar
Ecodyne Air Cooled heat Exchanger
Ecodyne
Jan 2015 – Jan 2015
Fluor
Skid Packages – IFS
IFS
Jan 2015 – Jan 2015
SOFEC
Houston - Aramco
Aramco
Jan 2015 – Jan 2015
Linde
Structural Steel - Cherokee Steel
Cherokee Steel
Jan 2015 – Jan 2015
Galperti, Houston
Fittings - Aramco
Aramco
Dec 2014 – Dec 2014
Sempra Chem
Capco
Capco
Nov 2014 – Nov 2014
Mustang Engineering
Skid Packages - Fibrebond
Fibrebond
Jun 2014 – Jun 2014
Warren Alloy
APP CBI – 2205 Alloy - Welding witness
APP CBI
May 2014 – May 2014
PPI
Pump Testing – Pumpworks 610
Pumpworks 610
Mar 2014 – Mar 2014
McDermott
Fuel Gas Skid Package - IFS
IFS
Mar 2014 – Mar 2014
Lufkin Gear
KBR – Gear Box Inspection
KBR
Feb 2014 – Feb 2014
Mustang engineering
Winston Royal Guard – Separator Inspection
Winston Royal Guard
Jan 2014 – Jan 2014
BHP
Angelina Tank – Storage Tank Inspection
Angelina Tank
Sept 2013 – Sept 2013
McDermott Middle East
Pima Valve – Chandler, Az. PIM
Pima Valve
Aug 2013 – Aug 2013
Tecnicas Ruindas/Aramco
Isotherm-Arlington, Tx. Heat Exchangers
Isotherm
Aug 2013 – Aug 2013
Tecnicas Ruindas/Aramco
Hudson Products - Fan Blades
Hudson Products
Jul 2013 – Jul 2013
Technip France
ABU DHABI – Gear Box Inspection - Lufkin
Lufkin
Jun 2013 – Jun 2013
Solar
Skid packages - IFS
IFS
Jun 2013 – Jun 2013
Enbridge
Large Bore Fittings – Steel Forgings
Steel Forgings
Jun 2013 – Jun 2013
HHI
Fuel Gas Skid Package - IFS
IFS
Jun 2013 – Jun 2013
Tecnicas Ruindas
Fire Pump Skid - Tigerflow
Tigerflow
May 2013 – May 2013
KBR
Gear Boxes – Lufkin Industries
Lufkin Industries
May 2013 – May 2013
Mustang Engineering
AZZ Galvanizing
AZZ Galvanizing
Apr 2013 – Apr 2013
Mustang Engineering
Structural Steel - Steel Fab of Monroe, La.
Steel Fab of Monroe
Jan 2013 – Jan 2013
Wintershall
Turbine driven compressor package rebuild – Solar
Solar
Sept 2012 – Sept 2012
ConocoPhillips
Solar Mabank – Turbine Testing
Solar Mabank
Aug 2012 – Jan 2013
IFS
RasGas Skid Units
RasGas
Jul 2012 – Jul 2012
Lufkin Industries
RasGas - Gear Boxes
RasGas
Jun 2012 – Jun 2012
Lufkin Industries
MHI – Gear Boxes
MHI
May 2012 – May 2012
IFS
KTI- Husky - Fuel Gas Skids
KTI- Husky
Apr 2012 – Apr 2012
Baker Tank
Chevron – Pressure Vessels
Chevron
Mar 2012 – Mar 2012
StreamFlo
Weldhead Equipment Inspection - Spectra
Spectra
Jan 2012 – Jan 2012
Baker Tank
Fisk-MEI – Pressure Vessels
Fisk-MEI
Dec 2011 – Dec 2011
Navidad Resources LLC.
QA Consultation - Ongoing
Sept 2011 – Sept 2011
Technip
Gear Boxes - Lufkin
Lufkin
Aug 2011 – Aug 2011
Total
Gear Boxes - Lufkin
Lufkin
Aug 2011 – Aug 2011
Swift Energy
Pressure Vessels – Baker Tank
Baker Tank
Jul 2011 – Jul 2011
Lufkin Industries
GE Gear Box API 613 Testing
GE
Jul 2011 – Jul 2011
Smith Tank
5 Storage Tanks for Genivar - Canada
Genivar - Canada
Jun 2011 – Jun 2011
MBI
Blast resistant Modules for Conoco
Conoco
Jun 2011 – Jun 2011
Winston
White Oak, Tx. Pressure Vessel - Conoco
Conoco
May 2011 – May 2011
SBM
Pump Skid Package Inspection – S&K Supply
S&K Supply
May 2011 – May 2011
Tecnimont
API 613 Gear Box inspection – Lufkin Industries
Lufkin Industries
Apr 2011 – Apr 2011
PB Energy
Welhead Inspection - Vendor- StreamFlo
StreamFlo
Mar 2011 – Mar 2011
Dow Chemical
API 610 & API 650 Tank – M.L. Smith
M.L. Smith
Mar 2011 – Mar 2011
Chevron
Jack/St. Palo Gear Box - Lufkin Industries
Lufkin Industries
Jan 2011 – Jan 2011
MODEC
Pump Skid Package - S&K Supply
S&K Supply
Nov 2010 – Nov 2010
MHI
Gear Box Inspection – Lufkin Industries
Lufkin Industries
Dec 2010 – Dec 2010
ExxonMobil Production
API 12F Tanks – Baker Tank
Baker Tank
Oct 2010 – Oct 2010
Chevron
Turbine Rebuild – Testing – Solar DeSoto Facility
Solar DeSoto Facility
Aug 2010 – Aug 2010
SBM
Gear Box Inspection – Lufkin Industries
Lufkin Industries
Jul 2010 – Jul 2010
Jacobs
Pump Inspection – Centrifugal Technology LLC
Centrifugal Technology LLC
Jul 2010 – Jul 2010
Saipem
Vendor Surveillance/ Inspection of Pressure Vessels – SEC
SEC
Jun 2010 – Jun 2010
AMEC Paragon
PSV Inspection – Farris Valve
Farris Valve
Jun 2010 – Jun 2010
CB&I
CTIW – Kearl Sands Project – Structural Steel
CTIW
May 2010 – May 2010
ExxonMobil Production
API 12F & API 650 Tanks - Baker Tank
Baker Tank
Jan 2010 – Jan 2010
Amec Paragon
PPC Sunnyvale, Texas
PPC
Aug 2009 – Sept 2009
Flowserve
Sulphur Springs, Tx Kuwait Nat'l Petrolem Co. Valve inspection
Kuwait Nat'l Petrolem Co.
Aug 2009 – Sept 2009
Peerless-Alco
Wichita Falls, Tx. Heat Exchangers for Modec
Modec
May 2009 – Jul 2009
Tranter Inc.
AMEC Kearl Sands Project - Inspection of Plate Exchangers
AMEC Kearl Sands Project
Mar 2009 – Apr 2009
Daniels Measurement
Cameron – Little Rock Facility
Cameron
Mar 2009 – Apr 2009
Panhandle Energy
Large bore weld fitting inspection @Steel Forgings
Steel Forgings
Nuovo Pignone - Snamprogetti - Petrobras Aker
Lufkin Gear - Gear Box inspection
Lufkin Gear
Saipem s.a.
Cameron Valve - Little Rock, Ark. Valve inspection for Saipem s.a.
Cameron Valve
Fluor
Fisher Valves – McKinney, Texas
Fisher Valves
CBI Lummus
Surface Equipment
Surface Equipment
Petrojet Vessels
Petrojet Vessels
Surface Equipment
Fluor Expediting
Winston Manufacturing
Winston Manufacturing
Exxon – Mark Wood
IFS - Tyler, Texas
IFS
IAG
Winston Manufacturing
Winston Manufacturing
Mediterranean Oilfield Services
Oversee Continental Emsco F350 Triplex Pump rebuild and performance testing at the S&K Supply facility in Kilgore Texas.
S&K Supply
Feb 2009 – Feb 2009
Solar Turbine Facility
Responsible for Inspection of: Solar Compressor set - Mars 100/C652
Solar
Worley Parsons & WestNet. Australia
client
Lufkin Industries
Solar Gear Boxes
Solar
Jan 2009 – Jan 2009
ExxonMobil
Baytown Various pressure vessels - Peerless
Peerless
Sep 2008 – Dec 2008
Jacobs-Motiva
Pressure vessels
Lufkin Industries
Ebara-Gear Boxes
Ebara
ConocoPhillips
CBI- Pressure vessels
CBI
Jul 2008 – Jul 2008
ExxonMobil
Solar Turbines DeSoto, Tx – Saturn turbine assembly.
Solar Turbines
Bureau Veritas
Slug catcher vessel – Surface Equipment, Kilgore, Texas.
Surface Equipment
Bantrel
Gear box testing per API 613. Lufkin Industries
Lufkin Industries
Solar
Gear box testing per API 613. Lufkin Industries
Lufkin Industries
Foster Wheeler
Skid packages, IFS-Tyler, Texas
IFS
Burns & McDonnell
Pressure Vessels, Winston Mfg. Longview, Tx.
Winston Mfg.
Jacobs/Suncor
Gear box testing per API 613. Lufkin Industries
Lufkin Industries
CB&I
Various Vendor Surveillance Inspection assignments.
Kuwait National Petroleum Company
Valve Inspection - Flowserve - Sulphur Springs, Tx.
Flowserve
Feb 2008 – Feb 2008
Shlumberger
Ball Valve assembly - ES Machine - Longview, Tx.
ES Machine
Saudi Kayan/CTCI Peerless
Pressure Vessel - Abilene, Tx.
Peerless
Aug 2007 – Aug 2007
Qatar Petroleum
Halliburton Well Completion Equipment - Dallas, Tx.
Halliburton
Air Liquide
Rodeo, Ca. Project-Inspection-38 Module hydrogen plant, CBI Tyler, Texas
CBI
Jun 2007 – Jun 2007
Performance Pulsation
Dallas, Tx. In process inspection-Peroni Pompe Spa
Peroni Pompe Spa
Lufkin Gear
CLOJC-API 613 Testing
CLOJC
Larson Turbo LTD.
Dekoron Wire and Cable, Mt. Pleasant, Tx. Witness cable testing
Dekoron Wire and Cable
Devon Energy
Pressure Vessels-Surface Equip. Longview, Tx.
Surface Equip.
Valero
Pressure vessels/VTech/Longview, Tx.
VTech
Black & Veatch
ASME Sect. VIII Div 2 Pressure vessels/Beaird Company Shreveport, La
Beaird Company
Elliott Ebara/Aramco
API 613 Gear Box testing Lufkin Industries
Lufkin Industries
SBM
API 613 testing of Gear boxes for the FPSO Frade. Lufkin Industries
Lufkin Industries
Chevron/Samsung
KTool Longview Texas. Takula Project - Pressure vessel inspection
KTool
Sunoco
Steam Control Station Skid Package- IFS, Tyler, Texas
IFS
Fluor
Alloy Pipe Spools-Shaw Pipe, West Monroe, La.
Shaw Pipe
Foster Wheeler
Expansion Joints-Texas Fab. Nacogdoches, Tx.
Texas Fab.
Trelleborg/Delmar/Shell
Bouy assembly, Jefferson, Texas
Technip
Fisher Control Valve Plant, Sherman, Texas
Fisher Control Valve Plant
Exxon Research
Pump rebuild, Best Pumpworks, Tyler, Texas
Best Pumpworks
Solar
Fuel gas skid packages, IFS-Tyler, Texas
IFS
SBM
Gear Box testing, FPSO SAXI Lufkin Gear
Lufkin Gear
Wilbros
engineered equipment in the East Texas area.
Petrobras
Fuel Gas Skid Package, Tyler, Texas
May 2006 – May 2006
SNC Lavalin
Pump Rebuild, Best Pumpworks, Tyler Texas
Best Pumpworks
Apr 2006 – Apr 2006
Baker Tank
Arp, Texas. El Paso Gas. Glycol Storage Tanks
El Paso Gas.
MODEC/Mitsui
IFS Plant- Tyler, Texas. Seawater Injection Pump Skids.
IFS Plant
Pemex
UOP Plant- Shreveport, La. R-134 Catalyst inspection/Pemex
UOP Plant
NW Pipeline Co.
PECO, Mineral Wells, Texas. Filter Separator inspection, NW Pipeline Co.
PECO
ValveWorks Shreveport, La.
API 6A Gate Valve inspection
API 6A Gate Valve
Feb 2006 – Feb 2006
King Tool
Inspection-23 Heavy wall 72” Separators.
Energy Transfer
Centrifugal pump rebuild, Best PumpWorks. API 610 performance testing RuhrPumpen facility
Best PumpWorks
Jun 2005 – Jan 2006
BP/JE/Cherry Point
Lead inspector - 7000 pipe spools, tips facility
tips facility
May 2005 – May 2005
BP/JE/Carson, Ca.
Lead Inspector - ISO Octene Unit 500 pipe spools TIPS Facility
TIPS Facility
Apr 2005 – Jan 2006
BP/Jacobs engineering/BP Whiting
Lead inspector - project-tips facility -5000+ pipe spools.
tips facility
Jan 2004 – Dec 2006
Jacobs Engineering/Flint Hills-Pine Bend
Lead Inspector - TIPS facility, Paris, Texas. 4000 pipe spools
TIPS facility
Jan 2004 – Jan 2004
EDG/ChevronTexaco
Lead inspector/Expeditor for EDG/ChevronTexaco at the Integrated Flow Solutions facility. (Chemical Injection Skid Package)
Integrated Flow Solutions
Jan 2004 – Jan 2004
SNC-Lavalin, Canada.
Inspection of API 5L X60 pipe at the Lone Star Texas mill-Representing SNC-Lavalin, Canada.
Jan 2004 – Jan 2004
ExxonMobil (MEGI)
Lead Inspector representing ExxonMobil (MEGI) at the Integrated Flow Solutions facility in Tyler, Texas. Assignment included inspection and expediting of a Chemical Injection skid package.
Integrated Flow Solutions
Jan 2004 – Jan 2004
Paragon/BP
Inspection and expediting representing Paragon/BP at Shaw Pipe Hanger facility
Shaw Pipe Hanger facility
Jan 2004 – Jan 2004
Hitachi
expediting for Hitachi at the CTIW Plant
CTIW Plant
Jan 2004 – Jan 2004
Syncrude-Canada
Inspection-US Motors- Mena, Ark. Representing Syncrude-Canada
US Motors
Jan 2003 – Jan 2003
Sunoco
Chief inspector for Sunoco, overseeing the fabrication and inspection of a 22 module Sulfur recovery plant built at the Howe Baker (CB&I) facility
Howe Baker (CB&I) facility
Jan 2002 – Jan 2002
Marathon
Lead inspector representing Marathon at the Howe Baker facility in Tyler, Texas. In charge of all aspects of inspection, reporting, and expediting of a 16 module process plant. (Alba Phase II)
Howe Baker facility
Jan 2001 – Jan 2001
ConocoPhillips
Inspection/Expediting representing ConocoPhillips at the Integrated Flow Solutions facility located in Tyler, Texas. The project involves fabrication and testing of a Sand Slurry skid package.
Integrated Flow Solutions